Tennessee State Route 252
Jump to navigation
Jump to search
Wilson Pike | ||||
Route information | ||||
Maintained by TDOT | ||||
Length | 13.4 mi (21.6 km) | |||
Existed | July 1, 1983[1]–present | |||
Major junctions | ||||
South end | SR 96 in Arrington | |||
North end | US 31 in Brentwood | |||
Location | ||||
Country | United States | |||
State | Tennessee | |||
Counties | Williamson | |||
Highway system | ||||
|
State Route 252 (SR 252) is a south–north road in Williamson County, Tennessee that connects Arrington with Brentwood.
Route description
SR 252 begins as Wilson Pike in Arrington at an intersection with SR 96. It goes north through farmland to enter the Brentwood city limits before having intersections with SR 441 and SR 253. It begins paralleling I-65 before entering downtown and coming to an intersection with Church Street. SR 252 then turns west along Church Street to pass under I-65 to come to an end at US 31/SR 6 less than a half-mile away.[2]
Major intersections
The entire route is in Williamson County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Arrington | 0.0 | 0.0 | SR 96 (Murfreesboro Road) – Franklin, Murfreesboro | Southern terminus | |
Brentwood | SR 441 west (Moores Lane) to I-65 – Franklin | Eastern terminus of SR 441 | |||
SR 253 (Concord Road) to I-65 – Nolensville | |||||
13.4 | 21.6 | US 31 (Franklin Road/SR 6) – Franklin, Oak Hill | Northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
See also
References
- ^ "The Road To 100 Years" (PDF). Tennessee Road Builder. Vol. 17, no. 5. September 2014. p. 22. Retrieved April 6, 2019.
- ^ Tennessee Atlas & Gazetteer (Map) (2004 ed.). DeLorme.