Vijayawada–Hyderabad Expressway
Vijayawada-Hyderabad Expressway | |
---|---|
Route information | |
Maintained by National Highways Authority of India (NHAI) | |
Length | 247 km (153 mi) |
Existed | October 2012–present |
Major junctions | |
East end | Gollapudi, Vijayawada, Andhra Pradesh |
West end | Outer Ring Road, Hyderabad, Telangana |
Location | |
Country | India |
States | Andhra Pradesh and Telangana |
Districts | Krishna, Suryapet, Nalgonda, Yadadri Bhuvanagiri, Medchal–Malkajgiri, Ranga Reddy, Hyderabad |
Major cities | Suryapet |
Towns | Nandigama, Kodad, Nakrekal, Chityala, Choutuppal |
Villages | Paritala, Kanchikacherla, Narketpally |
Highway system | |
Vijayawada–Hyderabad Expressway is a 247 km long, 4/6 lane wide tolled expressway that connects Vijayawada in Andhra Pradesh with Hyderabad in Telangana. It was opened for public in October 2012.[1] The project was undertaken by concessionaire GMR Hyderabad Vijayawada Expressways Private Limited, a subsidiary of GMR Group on a Build-Own-Operate-Transfer (BOOT) basis.[2] It is one of the busiest expressways in India and is a part of National Highway 65, which connects Machilipatnam to Pune.[3]
History
In early 2007, National Highways Authority of India (NHAI) has decided to expand the existing two-lane into a four-lane of Vijayawada-Hyderabad section. The project has also been sanctioned in 2007. But, due to technical issues, the project was delayed. Then in 2009, bids were announced by the NHAI. Five bidders were finalized for the construction of the roadway.
GMR Group, one of the 5 bidders for the project got the bid at a concession period of 25 years and incorporated a subsidiary, GMR Hyderabad Vijayawada Expressways Private Limited on 11 June 2009 for this work.[4] The project was completed under this subsidiary.
Construction
The project was started on 22 March 2010 with an estimated cost . The laying foundation ceremony was held at Narketpally attended by then Chief Minister of Andhra Pradesh, Konijeti Rosaiah, Jaipal Reddy and Ratanjit Pratap Narain Singh.[5] Earlier, three toll gates were set-up, whereas now, there are four. The project was completed in October 2012.[6]
Importance
After the Bifurcation of Andhra Pradesh, the expressway became a major roadway connecting Hyderabad, capital of Telangana and Vijayawada, capital of Andhra Pradesh. The expressway became a major hub for various businesses. Industrial parks, pharma sectors and other corridors were proposed by both Government of Telangana and Government of Andhra Pradesh.[7]
Exits
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. |
Inter-connectivity
Following will either connect or act as an alternative to the Vijayawada–Hyderabad Expressway:
- Mumbai–Nagpur Expressway will connect to expressway will connect to Vijayawada–Hyderabad Expressway at Nagpur.
- Jalna–Nanded Expressway will also provide direct connectivity between Vijayawada–Hyderabad Expressway (at Hydrabad) and Mumbai–Nagpur Expressway (at Jalna).
- Nagpur–Vijayawada Expressway is part of Nagpur–Vijayawada Economic Corridor which will connect Nagpur-Chandrapur (part greenfield) to Mancherial–Warangal (greenfield), Warangal–Khammam (greenfield), Khammam–Vijayvada (part greenfield). The tenders were issued in November 2022, would be likely completed by the end of 2024 or mid 2025.[8]
- Hyderabad–Indore Expressway via Nanded–Akola-Omkareshwar–Indore, which will further connect to Delhi–Mumbai Expressway via Kota–Indore Expressway (136 km).[9]
- Raipur–Visakhapatnam Expressway will be an alternative to the Vijayawada Hyderabad Expressway for the access to various ports across the Western Ghats in Bay of Bengal.
See also
References
- ^ "Work on Hyderabad-Vijayawada section of NH-9 to be over by October 2012". The Hindu. 22 March 2010. ISSN 0971-751X. Retrieved 19 January 2021.
- ^ "4/6 Laning Hyderabad – Vijayawada – Machilipatnam NH–9". www.nbmcw.com. Retrieved 19 January 2021.
- ^ Sanjai, P. R. (25 September 2015). "GMR Infra says payment delays on road projects were beyond its controls". mint. Retrieved 19 January 2021.
- ^ "GMR Infra to develop Hyderabad-Vijayawada highway". www.projectstoday.com. Retrieved 19 January 2021.
- ^ "Work on Hyderabad-Vijayawada section of NH-9 to be over by October 2012". The Hindu. 22 March 2010. ISSN 0971-751X. Retrieved 19 January 2021.
- ^ "Driving on Vijayawada-Hyderabad national highway to cost a bomb | Hyderabad News – Times of India". The Times of India. TNN. 8 Aug 2012. Retrieved 19 January 2021.
- ^ TelanganaToday. "KTR writes to Gadkari, seeks Rs 500 cr for development of Hyderabad-Vijayawada highway". Telangana Today. Retrieved 19 January 2021.
- ^ [ https://www.newindianexpress.com/states/telangana/2022/nov/29/nhai-to-build-mancherial-warangal-greenfield-highway-2523257.html NHAI to build Mancherial–Warangal greenfield highway], Indian Express, 29 Nov 2022.
- ^ Mega national highways projects: 22 expressways to be built in 5 years by 2024, 2020.