Outer Ring Road (Hyderabad, India)

From the AARoads Wiki: Read about the road before you go
(Redirected from Outer Ring Road, Hyderabad)
Jump to navigation Jump to search

Outer Ring Road, Hyderabad

Nehru Outer Ring Road
Hyderabad Outer Ring Road in red
Hyderabad Outer Ring Road.jpg
Route information
Maintained by Greater Hyderabad Municipal Corporation,
Hyderabad Metropolitan Development Authority
Length158 km (98 mi)
Existed2005; 19 years ago (2005)–present
RestrictionsTwo and three-wheeler vehicles are not allowed
Major junctions
North endGachibowli
South endNarsingi
Location
CountryIndia
StateTelangana
Highway system
State Highways in Telangana

The Hyderabad Outer Ring Road, officially known as Nehru Outer Ring Road and abbreviated as, H.O.R.R., is a 158-kilometer (98 mi), eight-lane ring road expressway encircling Hyderabad, capital of the Indian state of Telangana. The expressway was designed for speeds up to 100 kilometers per hour (62 mph), later increased to 120 kilometers per hour (75 mph).[1] A large part, 124 kilometers (77 mi) (covering urban nodes viz., Hi- Tech city, Nanakramguda Financial District, Rajiv Gandhi International Airport, IKP Knowledge park, Hardware Park, Telangana State Police Academy, Singapore Financial District, and Games village) of the 158 kilometers (98 mi) was opened by December 2012.[2]

On 3 January 2006, Prime Minister Dr. Manmohan Singh laid the foundation stone for the proposed Outer Ring Road (Phase I) near Shamshabad on the outskirts of Hyderabad. The project was part of broader vision to develop Hyderabad into a world-class city and a hub for information technology and other industries.

It gives easy connectivity between NH 44, NH 65, NH 161, NH 765 and NH 163 from Hyderabad to Vijayawada and Warangal as well as state highways leading to Vikarabad Nagarjuna Sagar and Karimnagar /Mancherial.[3] The Hyderabad Outer Ring Road also helps reduce the travel time from Rajiv Gandhi International Airport to cities like Nizamabad and Adilabad as it connects to NH44. The expressway is fenced and 33 radial roads connect it with the Inner Ring Road,[4] and the upcoming Regional Ring Road.

History

Initially this project was taken up by HUDA (Hyderabad Urban Development Authority), through its internal funding without political intervention of state government.[5] In December 2022, Government of Telangana planned to monetise the outer ring road through the toll-operate-transfer (TOT) model and generate revenues and called for tenders.[6]

Opening timeline

  • 14 Nov 2008: Gachibowli – Narsingi – Shamshabad (for Hyderabad International Airport) (22 km)[7]
  • 7 Jul 2010: Shamshabad – Pedda Amberpet (38 km)[8]
  • 14 Aug 2011: Narsingi – Patancheru (23.7 km)[9]
  • 3 Dec 2012: (part completed in 27 April 2018) Patancheru – Gowdavalli, and Kandlakoya – Shamirpet (38 km)[10]
  • 4 Mar 2015: Pedda Amberpet – Ghatkesar (14 km)[11]
  • 15 Jul 2016: Ghatkesar – Shameerpet (23 km)[12][13]

Land acquisition

The First Phase land required was 750 acres (3.0 km2), out of which the private land acquired was 500 acres (2.0 km2). The land required for Second Phase is about 5,500 acres (22 km2), of which the Govt. land is about 1,000 acres (4.0 km2). The estimated Cost of Acquisition was ₹250 Crores.

Traffic studies

A glimpse of the ORR while heading from Gachibowli towards Shamshabad

The traffic studies on NH 44 and NH 65 concluded that a four- or six-lane road is due. The traffic movement on the existing inner ring road proved that the existing four-lane road was inadequate. Due to the anticipated growth in the region and the development of proposed satellite townships around the ring road and beyond, an eight-lane carriageway was planned with a design life of 20 years.

The conclusion was to develop a highway with access control provides highway grade separations or interchanges for all intersecting highways. Once it had been decided to develop the route as an expressway, all intersecting highways should be terminated, rerouted or provided with a grade separation. The proposed corridor was access-controlled and limited access was to be provided at National Highway/SHI Major road crossings. A two-lane service road designed to carry two-way traffic, was proposed on both sides of the corridor. Low level underpasses were to be provided for connecting both the service roads at every 1–2 kilometers (0.62–1.24 mi), where the terrain permits.

Criticism

Much before the outer ring road (ORR) became a ring road, it underwent several changes in the road alignments. Influential farmers and realtors changed the alignment to best serve their interests at the cost of small and marginal farmers.[14]

The High Court of Andhra Pradesh passed a landmark judgement on 9 September 2010 in which the land acquisition proceedings were quashed for various reasons.[15]

Cycling track

Government of Telangana constructed a 23-kilometer-long (14 mi) cycle track on the Hyderabad Outer Ring Road (HORR) between the main carriageway and service road.[16] The foundation stone was laid by the then Minister for Municipal Administration and Urban Development (MAUD) K. T. Rama Rao in September 2022.[17] The cycle track is 8.5 kilometers (5.3 mi) long from Nanakramguda Junction to the Telangana State Police Academy (TSPA) and 14.50 kilometers (9.01 mi) from Narsingi to Kollur covered with solar panel rooftops along the stretch with a capacity of 16 MW.[18] The width of the cycle track is 4.5 metres with one-metre green space on either side. The cycle track is the improved version of the South Korean model, which provides more facilities like lighting, protection from rain, parking and other amenities such as food stalls. A team of officials from HMDA and HGCL had visited South Korea and studied the Cycle Track Project between Daejon and Sejong.

Proposed metro network

On 31 July 2023, K. T. Rama Rao mentioned that Government of Telangana has proposed a metro corridor of approximately 415 kilometers (258 mi) in length for city of Hyderabad and its peripheral areas, including 156 kilometers (97 mi) of metro network along the Outer Ring Road.[19][20][21]

Gallery

Exit and entry junctions

The Hyderabad Outer Ring Road
Ringroad towards RGIA

There are 20 interchange junctions on the Hyderabad Outer Ring Road.[22]

  • Kokapet interchange
  • Shamshabad Junction
  • Telangana State Police Academy Junction (TSPA Junction)
  • Nanakramguda Junction
  • Gachibowli Junction
  • Muttangi Junction, Pantancheru
  • Dommarapochampalli Junction
  • Kandlakoya Junction, Medchal (NH44) Nagpur highway (Srinagar to Kanyakumari National Highway)
  • Shamirpet Junction(SH1) Karimnagar State Highway
  • Keesara Junction
  • Annojiguda Junction, Ghatkesar
  • Pedda Amberpet Junction
  • Bongloor Junction

The HORR passes through the villages in Ranga Reddy and Sangareddy districts viz. Ghatkesar, Shamshabad, Tukkuguda, Kollur, Narsingi, Gachibowli, Patancheru, Bowrampet, Gowdavelli, Shamirpet, Pedda Amberpet, Bongloor and Medchal.

Route map

See also

References

  1. ^ "Speed limit on ORR raised to 120 kmph, citizens rejoice". The Hindu. 27 June 2023. ISSN 0971-751X. Retrieved 10 July 2023.
  2. ^ Another Outer Ring Road stretch to be opened today. The Times of India]. (3 December 2012).
  3. ^ Cities. Deccan Chronicle. Retrieved on 6 December 2013.
  4. ^ HMDA seeks approval to work on 16 radial roads. The Hindu (3 December 2012). Retrieved on 6 December 2013.
  5. ^ "Outer Ring Road - 2004 Budget Speech". apfinance.gov.in.
  6. ^ "Hyderabad: RRR may dent ORR revenue, fear bidders". The Times of India. 15 January 2023.
  7. ^ "First phase of Hyderabad Outer Ring Road thrown open". Thaindian News.
  8. ^ "For smooth traffic flow". The Hindu Business Line. Retrieved 5 January 2016.
  9. ^ "Narsingi-Patancheru ORR stretch opened". IBNLive. Retrieved 5 January 2016.
  10. ^ "Another Outer Ring Road stretch to be opened today". The Times of India. 2 December 2012.
  11. ^ "ORR: Pedda Amberpet-Ghatkesar stretch opens". The Hindu. 5 March 2015. Retrieved 5 January 2016.
  12. ^ "ORR: Ghatkesar – Shameerpet stretch opens". TOI. 15 July 2016. Retrieved 5 July 2016.
  13. ^ "Work to be Resumed on ORR Kandlakoya Interchange". The New Indian Express. Archived from the original on 26 October 2015. Retrieved 5 January 2016.
  14. ^ Money, muscle decide outer ring road course|work=The Times of India. Timesofindia.indiatimes.com (10 May 2005). Retrieved on 6 December 2013.
  15. ^ "The Hon'ble Sri Justice V". Archived from the original on 12 March 2012. Retrieved 4 November 2018. Hyderabad Metropolitan Development Authority (HMDA) vs Others
  16. ^ "Hyderabad: Solar roof-topped cycling track to come up on Outer Ring Road".
  17. ^ "Foundation laid for 21-km solar-roof cycling track on ORR".
  18. ^ "Solar panels to dot ORR cycling track, cost Rs 88cr".
  19. ^ "Elevated Metro rail to be cost effective: HMRL MD".
  20. ^ Hyderabad: 2-decker marvel in Metro-3
  21. ^ "Telangana cabinet approves 309 km of Hyderabad Metro expansion at Rs 69,000 crore". August 2023.
  22. ^ "Origin & Destination Matrix, Nehru Outer Ring Road" (PDF). Hyderabad Metropolitan Development Authority. Retrieved 28 November 2018.

External links