Terbanggi Besar–Pematang Panggang Toll Road
Jump to navigation
Jump to search
Terbanggi Besar–Pematang Panggang–Kayu Agung Toll Road | |
---|---|
Route information | |
Part of AH 25 | |
Maintained by PT Hutama Karya (Persero) | |
Length | 100 km (62 mi) |
Existed | 2019–present |
Major junctions | |
South end | Terbanggi Besar |
North end | Pematang Panggang |
Location | |
Country | Indonesia |
Provinces | Lampung |
Major cities | |
Highway system | |
Terbanggi Besar–Pematang Panggang–Kayu Agung Toll Road, often abbreviated as Terpeka is a 189.2-kilometer-long (117.6 mi) toll road that connects Terbanggi Besar, Pematang Panggang, and Kayu Agung in the island of Sumatra, Indonesia.[1] This toll road is a network of Trans-Sumatra Toll Road, and connected to Bakauheni-Terbanggi Besar Toll Road and Kayu Agung–Palembang–Betung Toll Road.
Exits
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Lampung | Terbanggi Besar, Central Lampung Regency | 140.0 | 87.0 | Bakauheni–Terbanggi Besar Toll Road | |||
140.8 | 87.5 | 140 | Terbanggi Besar Toll Gate |
| Southern terminus | ||
Terusan Nunyai, Central Lampung Regency | 167.4 | 104.0 | 166 | Gunung Batin Toll Gate |
| ||
Menggala, Tulang Bawang Regency | 183.7 | 114.1 | 184 | Menggala Toll Gate |
| ||
Lambu Kibang, West Tulang Bawang Regency | 201.8 | 125.4 | 202 | Lambu Kibang Toll Gate |
| ||
Way Serdang, West Tulang Bawang Regency | 218.4 | 135.7 | 218 | Way Kenanga Toll Gate |
| ||
Simpang Pematang, Mesuji Regency | 239.6 | 148.9 | 239 | Simpang Pematang Toll Gate |
| Northern terminus | |
240.6 | 149.5 | Pematang Panggang–Kayuagung Toll Road | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ "Nine toll roads stretching 406 kilometers to be launched this year". The Jakarta Post. Retrieved 2 September 2019.