New Jersey Turnpike

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

New Jersey Turnpike

New Jersey Turnpike and spurs (in green)
Route information
Maintained by NJTA
Length117.20 mi[1][2] (188.62 km)
(Mainline)
  • 11.03 mi (17.75 km)—Western Spur[3]
  • 6.55 mi (10.54 km)—Pennsylvania Extension[1]
  • 8.17 mi (13.15 km)—Newark Bay Extension[4]
  • 5.20 mi (8.37 km)—I-95 Extension[1]
  • 148.18 mi (238.47 km)—Total length of Turnpike including extensions
Existed1951–present
Component
highways
NHSEntire route[5]
RestrictionsBuses and commercial vehicles must use outer roadways between exits 6 and 14
Major junctions
South end I-295 / US 40 in Pennsville Township near the Delaware Memorial Bridge
Major intersections I-80 in Teaneck
North end I-95 / US 1-9 / US 46 / US 9W / Route 4 in Fort Lee near the George Washington Bridge
Location
CountryUnited States
StateNew Jersey
CountiesSalem, Gloucester, Camden, Burlington, Mercer, Middlesex, Union, Essex, Hudson, Bergen
Highway system
I-695Route 700 I-895
I-95Route 100 Route 101
I-295Route 300 Route 303

The New Jersey Turnpike (NJTP) is a system of controlled-access highways in the U.S. state of New Jersey. The turnpike is maintained by the New Jersey Turnpike Authority (NJTA).[a] The 117.20-mile (188.62 km) mainline's southern terminus is at Interstate 295 (I-295) and U.S. Route 40 (US 40) in Pennsville Township in Salem County, near the Delaware Memorial Bridge. Its northern terminus is at the approach to the George Washington Bridge in Fort Lee in Bergen County; originally it was at an interchange with I-80 and US 46 in Ridgefield Park. Construction of the mainline from concept to completion took 22 months, from 1950 to 1951. It was opened to traffic on November 5, 1951, between its southern terminus and exit 10.[6]

The turnpike is a major thoroughfare providing access to various localities in New Jersey.[7] The toll road provides a direct bypass southeast of Philadelphia for long-distance travelers between New York City and Washington, D.C. According to the International Bridge, Tunnel and Turnpike Association, the turnpike is the nation's sixth-busiest toll road and one of the most heavily traveled highways in the nation.[8]

The northern part of the mainline turnpike, along with the entirety of its extensions and spurs, is part of the Interstate Highway System, designated as I-95 between exit 6 in Mansfield Township and its northern end. South of exit 6, it has the unsigned Route 700 designation. There are three extensions and two spurs, including the Newark Bay Extension at exit 14, which carries I-78; the Pennsylvania Turnpike Extension, officially known as the Pearl Harbor Memorial Turnpike Extension, at exit 6 which carries I-95 off the mainline turnpike; the Eastern Spur and the Western Spur which split traffic between Newark and Ridgefield; and the I-95 Extension which continues the mainline to the George Washington Bridge in Fort Lee. All segments except for the I-95 Extension are tolled.

The route is divided into four roadways between exit 6 and exit 14. The inner lanes are normally restricted to carrying only cars, with the outer lanes for cars, trucks, and buses. The turnpike has 12-foot-wide (3.7 m) lanes, 10-foot-wide (3.0 m) shoulders and 13 service areas named after notable New Jersey residents. The Interstate Highway System took some of its design guidelines from those for the turnpike.[9] The turnpike has been referenced in music, film, and television.

Route description

File:New Jersey Turnpike time-lapse.webm

Map of the New Jersey Turnpike, including interchange locations and other highways in New Jersey

The mainline of the New Jersey Turnpike splits from I-295 in Pennsville Township and runs along a north-northeast route to I-80 and US 46 in Ridgefield Park, where it continues north as I-95. It is designated Route 700, an unsigned route, from exit 1 (Delaware Memorial Bridge) to exit 6 (Mansfield Township), and as I-95 from exit 6 to exit 18 (SecaucusCarlstadt). The number of lanes ranges from four lanes south of exit 4 (Mount Laurel Township), six lanes between exit 4 and exit 6 (Mansfield Township), 12 lanes between exit 6 and exit 11 (Woodbridge Township), and 14 lanes between exit 11 and exit 14 (Newark).[10] The default speed limit is 65 miles per hour (105 km/h) between the southern terminus and milepost 97, and 55 miles per hour (89 km/h) from there to the northern terminus.[1][2] The Newark Bay Extension carries a 50-mile-per-hour (80 km/h) limit.[4] The turnpike has variable speed limit signs allowing for the limit to be lowered temporarily during unusual road conditions.[11]

Before the advent of the Interstate Highway System, the entire Turnpike was designated by the New Jersey Department of Transportation (NJDOT) as Route 700. The Pearl Harbor Memorial Turnpike Extension was Route 700P, and the Newark Bay Extension was Route 700N. None of these state highway designations have been signed. The entire length of the New Jersey Turnpike is part of the National Highway System,[5] a network of roads important to the country's economy, defense, and mobility.[12]

Pennsville Township to Springfield Township

Signage at the southern end of the turnpike on I-295/US 40 in Pennsville Township

The turnpike's southern terminus lies at the approach to the Delaware Memorial Bridge in Pennsville Township, at I-295 north, US 40 east, Route 140 and County Route 540 (CR 540) along with several local roads. Through this section, the turnpike has three northbound lanes and two southbound lanes. The turnpike loses its third northbound lane, and continues on with two lanes in each direction and a 65 mph (105 km/h) speed limit. After crossing over Game Creek, the turnpike reaches the exit 1 toll plaza, where northbound drivers must obtain a ticket, and southbound drivers must surrender their ticket and pay the proper toll. Two Express E-ZPass lanes are provided in each direction. Paralleling I-295, the turnpike continues east-northeast through rural Salem County with two lanes in each direction. After passing under Route 48, the turnpike enters Oldmans Township, where it has the John Fenwick Service Area northbound and the Clara Barton Service Area southbound. The turnpike then briefly enters Pilesgrove Township before crossing the Oldmans Creek into Woolwich Township.[2][10]

View south along the New Jersey Turnpike in East Greenwich Township

Continuing northeast, the turnpike crosses the SMS Rail Lines' Salem Branch before passing to the south of Swedesboro. After crossing the Raccoon Creek, the highway reaches an interchange for US 322. A maintenance yard is present on the northbound side of the turnpike immediately north of the interchange into Harrison Township. The route heads northeast into East Greenwich Township past farmland before crossing Edwards Creek. Here, the turnpike passes by residential developments and soon crosses the Mantua Creek into West Deptford Township, where it passes through parkland before development near the route increases substantially. After passing under Route 45, the turnpike enters Woodbury Heights, where it passes by homes before crossing Conrail Shared Assets Operations' (CSAO) Vineland Secondary and entering Deptford Township. Here, the turnpike passes under Route 47 before crossing the Big Timber Creek. Immediately northeast of this point, the turnpike passes under the Route 42 freeway and enters the Camden County borough of Bellmawr. After passing to the south of an industrial park, the turnpike enters Runnemede and comes to an exit for Route 168 (Black Horse Pike), serving the city of Camden to the north and providing access to the Atlantic City Expressway to the south. Immediately after the interchange, the turnpike crosses back into Bellmawr before entering Barrington, where it passes under Route 41. The turnpike then passes near packaging plants before entering Lawnside and crossing US 30.[2][10]

Still two lanes in each direction, the turnpike continues northeast past a warehouse and eventually comes within yards of I-295. Upon entering Cherry Hill, the turnpike passes over tracks carrying the PATCO Speedline and NJ Transit's Atlantic City Line before reaching the Walt Whitman Service Area along the southbound lanes. Continuing northeast, the turnpike passes under Route 70 before crossing the Pennsauken Creek into Mount Laurel, Burlington County, where it has an exit for Route 73. North of this point, the turnpike has three lanes in each direction. Still running within close proximity of I-295, the turnpike comes to a New Jersey State Police station and passes under Route 38 before crossing CSAO's Pemberton Industrial Track. After the northbound James Fenimore Cooper Service Area, the road crosses over Rancocas Creek and passes to the northwest of Rancocas State Park. Now in Westampton Township, the distance between I-295 and the turnpike increases, and the turnpike reaches an exit for CR 541 (Burlington-Mount Holly Road). Northeast of this point, the turnpike continues as a six-lane highway into Burlington Township, where it passes by houses and the Burlington Country Club before entering Springfield Township. Here, the turnpike passes by agricultural areas before crossing Assiscunk Creek.[2][10]

Mansfield Township to Newark

New Jersey Turnpike (I-95) northbound at I-195 exit in Robbinsville Township

Now in Mansfield Township, the turnpike splits into a "dual-dual" configuration similar to a local-express configuration. The outer lanes are open to all vehicles and the inner lanes are limited to cars only, unless signed otherwise because of unusual conditions. The turnpike has now has a total of 12 lanes, six in each direction (3-3-3-3). Just north of the split is an interchange with the Pearl Harbor Memorial Turnpike Extension, where the turnpike mainline becomes concurrent with I-95.[2][10] North of this point, the turnpike enters Bordentown Township and has an exit for US 206. Continuing northeast, the turnpike passes by a mix of residential neighborhoods and farmland and enters Chesterfield Township before passing over Crosswicks Creek and entering Hamilton Township in Mercer County. The highway then reaches the Woodrow Wilson and Richard Stockton service areas on the southbound and northbound sides, respectively. After the service areas, the turnpike enters Robbinsville Township and reaches an exit for I-195, an east–west freeway connecting the state capital of Trenton with the Jersey Shore. North of I-195, the turnpike passes to the west of several warehouses and traverses numerous parks and wooded areas. After crossing Assunpink Creek, the turnpike enters East Windsor Township, where the road changes its course to a slightly more northerly path. Near Hightstown is an exit for Route 133, which connects the turnpike with and provides a bypass for Route 33 in the area. North of here, the turnpike crosses the Millstone River into Cranbury Township, Middlesex County, and passes more warehouses on both sides of the road in addition to the southbound Molly Pitcher Service Area. After entering Monroe Township, the turnpike has a modified trumpet interchange with Route 32 serving Jamesburg. The interchange has a ramp for traffic seeking Route 32 eastbound forming an "S" shape, taking traffic to Cranbury South River Road. Upon crossing into South Brunswick, the turnpike crosses CSAO's Amboy Secondary and passes by more industrial parks. The highway then enters East Brunswick, where suburban development along the corridor greatly increases, indicating the entrance to the built-up portion of the New York metropolitan area. Continuing north, the turnpike passes to the east of a golf course and has the northbound Joyce Kilmer Service Area. The route briefly enters Milltown before crossing back into East Brunswick, where it passes by many homes before reaching an exit for Route 18 serving the county seat of New Brunswick. After Route 18, the turnpike enters New Brunswick and crosses over the Raritan River on the Basilone Memorial Bridge into Edison.[1][10] The structure honors John Basilone, a Raritan resident who is the only United States Marine to be honored with the Medal of Honor, the Navy Cross and the Purple Heart. He died in the Battle of Iwo Jima in 1945.[13]

View south along the turnpike from a plane landing at Newark Liberty International Airport

After crossing the Rartian River, the turnpike passes by several warehouses and industrial parks before crossing CSAO's Bonhamtown Industrial Track line and reaching an exit serving I-287 and Route 440. Soon afterwards, the turnpike passes over the Middlesex Greenway and enters Woodbridge Township, where it reaches an exit serving the Garden State Parkway and US 9. North of this interchange is the headquarters of the NJTA. From Woodbridge Township to Newark, high-occupancy vehicle lanes (HOV lanes) exist on the outer roadway, thereby making it seven lanes in each direction (4-3-3-4). The HOV restrictions are in effect on weekdays, from 6:00 a.m. to 9:00 a.m. northbound, and 4:00 p.m. to 7:00 p.m. southbound (at times, the NJTA might suspend the HOV restrictions entirely during peak hours in case of unusual conditions).[14] Continuing northeast, the turnpike passes under Route 35 and crosses NJ Transit's North Jersey Coast Line. Past this point, the turnpike crosses the Woodbridge River and reaches the Grover Cleveland Service Area northbound and the Thomas Edison Service Area southbound. After passing over CSAO's Port Reading Secondary line, the turnpike enters Carteret and begins to run parallel to CSAO's Chemical Coast Secondary line, which is located east of the turnpike. In Carteret, the highway comes to an interchange serving the borough in addition to Rahway. Immediately north of the interchange, the Wallberg-Lovely Memorial Bridge carries the turnpike over the Rahway River. The bridge is dedicated to Private Martin Wallberg from Westfield, and Private Luke Lovely from, South Amboy, the first soldiers from New Jersey to die in World War I.[15] In Linden, the turnpike passes to the east of a large industrial park before reaching an exit for I-278, which traverses the nearby Goethals Bridge. North of this point, the speed limit drops to 55 mph (89 km/h), and the turnpike crosses the Elizabeth River into the city of Elizabeth. After bisecting residential areas, the route comes to an exit for the Route 81 freeway, providing access to Newark Liberty International Airport. While passing to the east of the airport, the turnpike passes to the west of the Elizabeth Center big-box center and the Port Newark–Elizabeth Marine Terminal upon entering Newark.[1][10] A section of the turnpike and the surrounding land in Elizabeth and Newark has been called "the most dangerous two miles in America" by New Jersey Homeland Security officials due to the high volume of traffic and the density of potential terrorist targets in the surrounding area.[16]

Newark to Ridgefield Park

New Jersey Turnpike (I-95) southbound approaching the I-78/US 1–9 interchange in Newark

After reaching the north end of the airport, the HOV lanes end, and the turnpike comes to a junction with I-78, which is also the Newark Bay Extension of the turnpike east of the mainline. North of I-78, the turnpike passes over CSAO's Chemical Coast Secondary, Greenville Running Track, and National Docks Branch at the Oak Island Yard. At this point, the car-truck lane configuration ends, and the turnpike splits into two spurs: the Eastern Spur (the original roadway) and the Western Spur (opened in 1970). Both are signed as I-95. The Western Spur is posted for through traffic on I-95 seeking I-280 and the George Washington Bridge, while traffic seeking US 46, I-80, and the Lincoln Tunnel is routed via the Eastern Spur. NJDOT, which calls every class of highway "Route", calls the Western Spur "Route 95W". The NJTA refers to the complex series of roadways and ramps linking the car–truck lanes, the two spurs, as well as traffic heading to and from I-78 as the "Southern Mixing Bowl".[17] Both spurs have an exit for US 1/9 Truck and pass under the Pulaski Skyway (US 1/9) at this point before crossing over CSAO's Passaic and Harsimus Line,[1][10] and will meet up at US 46 and I-80 to continue to the George Washington Bridge where the Turnpike will eventually end.

Eastern Spur

New Jersey Turnpike (I-95) northbound approaching split into Western Spur and Eastern Spur in Newark

The Eastern Spur crosses the Passaic River on the Chaplain Washington Bridge, which honors Rev. John P. Washington who gave up his life jacket and died as the SS Dorchester sank on February 3, 1943.[18] After crossing over tracks carrying PATH's Newark–World Trade Center line, NJ Transit's Morris & Essex Lines, and Amtrak's Northeast Corridor, the spur surfaces into Kearny, Hudson County, as a six-lane highway, and has a partial junction with I-280, containing only a southbound exit and northbound entrance. Past this point, the spur passes over Route 7 and crosses the Hackensack River on the Lewandowski Hackensack River Bridge. The bridge was named in honor of the three Lewandowski brothers, Army Private Alexander, Marine Sergeant Walter and Air Force Lieutenant William, who were killed in action during World War II within 18 months of each other.[19] The turnpike then enters Secaucus and crosses Norfolk Southern's Boonton Line before passing over NJ Transit's Main Line just north of the Secaucus Junction station serving NJ Transit trains running along the Northeast Corridor and the Main Line. After the southbound lanes have the Alexander Hamilton Service Area, the turnpike reaches the exit 18E toll plaza, serving as the northern end of the ticket system. Immediately afterwards is an interchange with Route 495 and Route 3, providing access to the Lincoln Tunnel. After passing through swampland in the New Jersey Meadowlands, the spur crosses into Ridgefield, Bergen County. Here, the Eastern Spur comes to the northernmost service area on the turnpike, the Vince Lombardi Service Area. After passing over the New York, Susquehanna and Western Railway's New Jersey Subdivision line and CSX's River Subdivision line, the highway merges back together with the Western Spur as it passes east of PSE&G's Bergen Generating Station and crosses Overpeck Creek into Ridgefield Park, where the turnpike comes to its original northern terminus at US 46.[1][10][20]

Western Spur

Sign welcoming drivers to the New Jersey Turnpike under the Edgewood Road Bridge in Leonia

The Harry Laderman Bridge, named after the first turnpike employee killed on the job,[19] carries the Western Spur over the Passaic River and then tracks carrying PATH's Newark–World Trade Center line, NJ Transit's Morris & Essex Lines, and Amtrak's Northeast Corridor. Running north with six lanes, the Western Spur has a full interchange with I-280 before crossing over Route 7 and the Boonton Line. The spur then enters Lyndhurst and crosses NJ Transit's Main Line and Berrys Creek before passing over NJ Transit's Bergen County Line and entering East Rutherford. Here, the Western Spur has a junction with Route 3, where it loses a lane in each direction. The highway reaches the exit 18W toll plaza before passing by the Meadowlands Sports Complex and the American Dream shopping and entertainment complex, which are served by a southbound exit and northbound entrance with connections to Route 120 and CR 503 via Route 3. After crossing the Hackensack River, the Western Spur has access to the Vince Lombardi Service Area before crossing the New York, Susquehanna and Western Railway's New Jersey Subdivision line and CSX's River Subdivision line and merging with the Eastern Spur.[3][21]

Extensions

View south along the Pearl Harbor Memorial Turnpike Extension (I-95) at US 130 in Florence
I-95 southbound at the north end of NJTA jurisdiction in Fort Lee

The turnpike has three extensions; the first, the Newark Bay Extension, at 8.2 miles (13.2 km), opened in 1956,[22] and is part of I-78. It connects Newark with Lower Manhattan via the Holland Tunnel in Jersey City and intersects the mainline near Newark Liberty International Airport. This extension has three exits (exits 14A, 14B, and 14C), and due to its design (four lanes with a shoulderless Jersey barrier divider), has a 50-mile-per-hour (80 km/h) speed limit. The extension traverses the Newark Bay Bridge (officially the Vincent R. Casciano Memorial Bridge), which is a steel cantilever bridge spanning Newark Bay and connecting Newark and Bayonne. Dubbed the "world's most expensive road" by The Jersey Journal, it was completed April 4, 1956, as part of the turnpike's Newark Bay Extension. Casciano was a state assemblyman and a lifetime resident of Bayonne.[23]

The second extension, known as the Pearl Harbor Memorial Turnpike Extension (or Pennsylvania Turnpike Connector), carries I-95 off the mainline of the New Jersey Turnpike at exit 6 and connects to the Pennsylvania Turnpike via the Delaware River–Turnpike Toll Bridge, a continuous truss bridge spanning the Delaware River. This extension, and the Delaware River bridge, were opened to traffic on May 25, 1956.[24] A six-mile-long (9.7 km), six-lane highway, it has an exit, designated as 6A, to US 130 near Florence. The extension was formerly designated as Route 700P, but was officially designated as I-95 after the Somerset Freeway was cancelled, and was signed as such when the first components of the Pennsylvania Turnpike/Interstate 95 Interchange Project were completed on September 22, 2018.[25]

The third extension, the four-mile (6.4 km) stretch of I-95 north of US 46 came under NJTA jurisdiction in 1992, as NJDOT sold the road to balance the state budget, and it is not tolled. This section of the road – known as the I-95 Extension – extends the mainline to travel past the interchange for I-80 in Teaneck where the original terminus was, and through a cut in the Hudson Palisades to the GWB Plaza. Even though it was not constructed when the Turnpike first opened, the I-95 Extension is still considered to be a part of the mainline, not just a spur like the Newark Bay or Pennsylvania Turnpike extensions are, despite it being tolled. Past I-80 to Fort Lee, the Turnpike logo is only signed southbound in this segment, and rarely northbound since it terminates very soon in that direction. The turnpike terminates at US 9W (exit 72), with the final approaches to the George Washington Bridge along I-95 maintained by the Port Authority of New York and New Jersey. Signs saying “Turnpike Entrance” southbound past I-80 mean entering the tolled parts of the Turnpike. Exit numbers along this section follow the mile markers I-95 would have had if the Somerset Freeway was built.[20]

Services

Service areas

Molly Pitcher Service Area
Grover Cleveland Service Area
Signage for the Joyce Kilmer Service Area

The New Jersey Turnpike is noted for naming its service areas after notable people who had a connection to New Jersey.[26]

Service areas, south to north
Service area Direction mi km Nearest exits Location Notes
Clara Barton Southbound 5.4 8.7 1, 2 Oldmans Township
John Fenwick Northbound 5.4 8.7 1, 2 Oldmans Township
Walt Whitman Southbound 30.2 48.6 3, 4 Cherry Hill
James Fenimore Cooper Northbound 39.4 63.4 4, 5 Mount Laurel
Richard Stockton Southbound 58.7 94.5 7, 7A Hamilton Township
Woodrow Wilson Northbound 58.7 94.5 7, 7A Hamilton Township
Molly Pitcher Southbound 71.7 115.4 8, 8A Cranbury
Joyce Kilmer Northbound 78.7 126.7 8A, 9 East Brunswick
Grover Cleveland Northbound 92.9 149.5 11, 12 Woodbridge Township
Thomas Edison Southbound 92.9 149.5 11, 12 Woodbridge Township
Alexander Hamilton Southbound 111.6 179.6 15X, 16E Secaucus Eastern spur only
Vince Lombardi Both 116.0 186.7 17/19W, 68 Ridgefield Eastern and western spurs; Vince Lombardi Park & Ride located at service area
Electric vehicle charging machines at Vince Lombardi Service Area

Turnpike service areas consist mostly of fast-food restaurants operated by Iris Buyer LLC (Applegreen). Each rest area also includes restrooms, water fountains, a Sunoco gas station with a small convenience store, with gas price signs posted about half a mile (0.8 km) before reaching the rest area, and a separate parking area for cars and trucks. Some have a dedicated bus parking area, Wi-Fi, and a gift shop as well.[27]

Before 1982, there was a service area on the northbound side named for Admiral William Halsey.[28] However, in 1982, exit 13A was created, which caused the obscuring of the rest area, as they both overlapped with each other. Anyone who wanted to get to the service area missed exiting at exit 13A, and (northbound) drivers who took that exit missed that service area. The service area closed permanently on June 4, 1994.[29] Today, it can be seen by motorists when exiting 13A from the northbound car lanes, where a temporary concrete barrier obstructs an open asphalt lot.[30]

Two service areas were located on the Newark Bay Extension (one eastbound and one westbound) to the west of exit 14B. These were closed in the early 1970s. The eastbound service area was named for John Stevens, the westbound service area for Peter Stuyvesant.[31]

In late March 2010, it was revealed that the state Transportation Commissioner was considering selling the naming rights of the rest areas to help address a budget shortfall.[32]

The Grover Cleveland Service Area in Woodbridge was temporarily closed because of storm damage from Hurricane Sandy in October 2012, with only fuel available. It was rebuilt and fully reopened on November 23, 2015.[33][34] In 2015, the NJTA installed Tesla Supercharger stations in the Molly Pitcher and Joyce Kilmer service areas to allow Tesla car owners to charge their vehicles. A proposal to offer charging stations for non-Tesla vehicles is also under consideration.[35]

Emergency assistance

The NJTA offers 12-foot-wide (3.7 m) shoulders wherever possible, and disabled vehicle service may be obtained by dialing #95 on a cellular phone. Towing and roadside assistance are provided from authorized garages. The New Jersey State Police is the primary police agency that handles calls for service on the turnpike.[36] New Jersey State Police Troop D serves the New Jersey Turnpike, with stations in Cranbury, Moorestown, and Newark.[37] Other emergency services such as fire and first aid are usually handled by the jurisdictions in which that section of the turnpike passes.[36]

History

Hackensack Run bridge under construction in 1951

Precursors and planning

Route 100

LocationNew BrunswickFort Lee
Existed1938–1953

Route 300

LocationDeepwaterNew Brunswick
Existed1938–1953

Route 100 and Route 300 were two state highways proposed in the 1930s by the New Jersey State Highway Department as precursors to the New Jersey Turnpike.

The road that is now the New Jersey Turnpike was first planned by the State Highway Department as two untolled freeways in 1938. Route 100 was the route from New Brunswick to the George Washington Bridge, plus a spur to the Holland Tunnel, now the Newark Bay Extension of the Turnpike. Route 300 was the southern part of the turnpike from the Delaware Memorial Bridge to New Brunswick. However, the State Highway Department did not have the funds to complete the two freeways, and very little of the road was built under its auspices.[38][39] Instead, in 1948, the NJTA was created to build the road, and the two freeways were built as a single toll road.

Route S100 was a proposed spur of Route 100 in Elizabeth. It was never built, although Route 81 follows a similar alignment.

Construction of the New Jersey Turnpike

According to a letter to the editor written by Kathleen Troast Pitney, the daughter of Paul L. Troast, the first chairman of the NJTA:

Governor Driscoll appointed three men to the turnpike authority in the late 1940s—Maxwell Lester, George Smith and Paul Troast, my father, as chairman. They had no enabling legislation and no funding. They were able to open more than two-thirds of the road in 11 months, completing the whole (project) in less than two years ... When the commissioners broached the subject of landscaping the road ... the governor told them he wanted a road to take the interstate traffic ... off New Jersey's existing roads. Since 85 percent of the traffic at that time was estimated to be from out of state, why spend additional funds on landscaping?[40]

A brochure Interesting Facts about the New Jersey Turnpike, dating from soon after the road's opening, says that when the turnpike's bonds are paid off, "the law provides that the turnpike be turned over to the state for inclusion in the public highway system". Due to new construction, and the expectation that the turnpike pays for policing and maintenance, this has never come to pass.

Construction

New Jersey Turnpike (I-95) northbound in Linden

The project of building the turnpike had its challenges. One major problem was the construction in the city of Elizabeth, where either 450 homes or 32 businesses would be destroyed, depending on the chosen route. The engineers decided to go through the residential area, since they considered it the grittiest and the closest route to both Newark Airport and the Port Newark–Elizabeth Marine Terminal seaport.

When construction finally got to Newark, there was the new challenge of deciding to build either over or under the Pulaski Skyway. If construction went above the skyway, the costs would be much higher. If they went under, the costs would be lower, but the roadway would be very close to the Passaic River, making it harder for ships to pass through. The turnpike was ultimately built to pass under.[41][42] As part of a 2005 seismic retrofit project, the NJTA lowered its roadway to increase vertical clearance and allow for full-width shoulders, which had been constrained by the location of the skyway supports.[43] Engineers replaced the bearings and lowered the bridge by four feet (1.2 m), without shutting down traffic. The work was carried out under a $35 million contract in 2004 by Koch Skanska of Carteret. The project's engineers were from a joint venture of Dewberry Goodkind Inc. and HNTB Corp. Temporary towers supported the bridge while bearings were removed from the 150 piers and the concrete replaced on the pier tops. The lowering process for an 800-foot (240 m) section of the bridge was done over 56 increments, during five weeks of work.[44]

New Jersey Turnpike (I-95) southbound at the Route 33/Route 133 interchange in East Windsor Township

While continuing up to the New Jersey Meadowlands, the crossings were harder because of the fertile marsh land of silt and mud. Near the shallow mud, the mud was filled with crushed stone, and the roadway was built above the water table. In the deeper mud, caissons were sunk down to a firm stratum and filled with sand, then both the caissons and the surrounding areas were covered with blankets of sand. Gradually, the water was brought up, and drained into adjacent meadows. Then, construction of the two major bridges over the Passaic and Hackensack Rivers was completed. The bridges were built to give motorists a clear view of the New York City skyline, but with high retaining walls to create the illusion of not being on a river crossing.[45] The 6,955 ft (2,120 m) Passaic River (Chaplain Washington) Bridge cost $13.7 million to build; the 5,623 ft (1,714 m) Hackensack River Bridge cost $9.5 million.

The entire 118-mile (190 km) length of the New Jersey Turnpike took 25 months to construct, at a total cost of $255 million. The first 44-mile-long (71 km) stretch, from exit 1 in Carneys Point Township north to exit 5 in Westampton Township, opened on November 5, 1951. A second 49-mile-long (79 km) stretch from exit 5 north to exit 11 in Woodbridge opened on November 30, 1951, followed by a third 16-mile-long (26 km) stretch from exit 11 north to exit 15E in Newark on December 20, 1951. The fourth and final nine-mile-long (14 km) stretch, from exit 15E north to exit 18 in Ridgefield, opened on January 15, 1952, completing the turnpike.[45] After the turnpike was competed in 1952, the NJTA and the New York State Thruway Authority (NYSTA) proposed a 13-mile (21 km) extension of the New Jersey Turnpike that would run from its end (at US 46 in Ridgefield Park at the time) up to West Nyack, New York, at I-87 (New York State Thruway). The section through New Jersey was to be constructed and maintained by the NJTA, while the section in New York was to be built and maintained by the NYSTA. The purpose of this extension was to give motorists a "more direct bypass of the New York City area" to New England, by using the Tappan Zee Bridge. The extension was to parallel New York State Route 303 (NY 303) and the present-day CSX River Subdivision, and have limited interchanges. It was to have an interchange with the Palisades Interstate Parkway and at I-87 (New York State Thruway) in West Nyack. This project did not survive; by 1970, it became too expensive to buy right-of-way access, and community opposition was fierce. Therefore, the NJTA and the NYSTA canceled the project.[45] NJDOT did construct a small segment of this extension, the portion between US 46 and I-80, as part of the I-95 Extension. This segment was later transferred to the NJTA.

1950s to 1990s

Approaching the exit 11 tollbooths at night in 1992, prior to the installation of E-ZPass
Typical sign at non-freeway entrances to the turnpike; this one is at exit 3

With the turnpike completed, traffic increased beyond expectations, which prompted planning for two widenings in 1955. the first of these would widen the segment of roadway and from four lanes to an eight-lane, dual-dual setup (2-2-2-2, two express carriageways and two local carriageways in each direction) between exit 10 and exit 14. The second widening would add two lanes from exit 4 to exit 10, making for a total of six lans shared between both directions. In April 1956, the widening between exit 10 and exit 14 was competed, also as part of this project, exit 14 was rebuilt from a standard exit that served US 1-9 into the 8.2-mile-long (13.2 km) Newark Bay Extension.[46] On May 25 of that year, the widening between exit 4 and exit 10 was competed, along with this came the six-mile (9.7 km) Pennsylvania Turnpike Extension and its interchange with the mainline.[47]

In 1958, a part of the turnpike was designated as I-95.[48][49] In addition, part of the southern segment was signed as I-295, and the Newark Bay Extension was signed as I-78.

On May 15, 1962, the authority opened a new exit 12. This full interchange, which replaced the original slip ramps at the location, cost $3,500,000 (equivalent to $27 million in 2023[50]) to construct, and unlike the old ramps, contained a southbound exit and northbound entrance.[51]

On August 7, 1962, a project to improve the road in preparation for the 1964 New York World's Fair started. It involved demolishing parts of four interchanges and upgrading two others into full ones in addition to toll plaza improvements across the entire highway.[52] Exit 17 had its northbound entrance and exits permanently closed on June 16, 1963.[53] A new exit 18 was completed on February 25, 1964, replacing the old exit 18 that had previously existed at the roads northern terminus.[54] On May 29, 1964, the project was competed, this when the new northbound connections at exit 16 were competed,[55]

In 1966, the NJTA began a project to widen the Turnpike between exit 10 and exit 14 under a new expansion plan. This abolished the express-local roadway plan and created the car and truck-bus lane configuration (3-3-3-3). This project also included closing the old exit 10 at Woodbridge and replacing it with a new exit 10 in Edison Township that opened on January 13, 1970;[56] exit 11 was also rebuilt to provide complete access to the Garden State Parkway.[57] The dual-dual setup was opened a day after the Edison interchange opened,[58] and was extended north with the construction of the Western Spur of the turnpike that opened on September 3, 1970,[59] and extended south to exit 9 in East Brunswick Township in 1973 (northbound on November 14,[60] and southbound on January 13, 1974[61]), and again extended further south on October 22, 1990, to exit 8A in Monroe Township.[62]

Within Ridgefield Park, the Bergen-Passaic Expressway was built on the north side of the borough, and left a mile gap to the Turnpike. This gap was closed on October 20, 1971.[63]

Hackensack River Bridge on the Eastern Spur of the turnpike, viewed from Snake Hill

In 1971, the NJTA proposed building the Alfred E. Driscoll Expressway. It was to start at the Garden State Parkway south of exit 80 in Dover Township (now Toms River) and end at the turnpike approximately three miles (4.8 km) north of exit 8A in South Brunswick. As a proposed part of the turnpike system, its seven interchanges would have included toll plazas except at the northern end of the turnpike. By 1972, the proposed road met fierce opposition from Ocean, Monmouth, and Middlesex counties with quality of life being the main concern. The NJTA proceeded anyway and began selling bonds. But by December 1973, Governor-elect Brendan Byrne decided to stop the project altogether. Despite this, the authority continued with its plan. It was not until February 1977 that the authority abandoned its plan to build the road.[64] The rights-of-way were sold in 1979, shelving the project indefinitely.[65]

A series of roadway accidents occurred on the New Jersey Turnpike in the town of Kearny, on October 23 and 24, 1973. The first collision occurred at 11:20 p.m. EDT on the 23rd. Further accidents continued to occur until 2:45 a.m. the next day as cars plowed into the unseen accident ahead of them. Sixty-six vehicles were involved, and nine people died as a result. Thirty-nine suffered non-fatal injuries. The primary cause of the accident was related to a fire consisting of burning garbage, aggravated by foggy conditions.[66] This produced an area of extremely poor visibility.

On May 30, 1974, exit 7A was opened to traffic.[67] The interchange, which connected to I-195, was also constructed to serve the nearby Great Adventure amusement park, which opened later that year.

With the completion of I-78 to the Newark Bay Extension on May 27, 1977,[68] the interchange's toll plaza was replaced with a wider one and ramps replaced, with none of the original 1951 configuration remaining.

On June 10, 1982, exit 13A was opened to traffic.[69] The interchange was constructed in order to provide direct connections to the nearby Newark Liberty International Airport, which had previously required taking convoluted routes via exit 13 or 14.

In 1987, the authority announced a plan a to rebuild the Western Spur. If this were to be competed, it would have added truck lanes, in addition to a new exit 15 W-A, which would have replaced exit 15. However, it was never carried out.[45]

In 1988, a project to reconstruct exit 7 was announced.[70] A new, 12 lane toll plaza and ramp complex located 12 mile (0.80 km) away from the original plaza was to be constructed, and the existing toll plaza was demolished,[45] though the old overpass would be left intact as a U-turn ramp. Construction began almost immediately, and was completed in 1990, and cost $30 million.[45]

New Jersey Turnpike northbound approaching the Route 73 interchange in Mount Laurel

In 1985, the authority announced plans to extend the dual-dual roadway to exits 8A.[71] Groundbreaking for this project began on June 23, 1987.[72] This widening between created some problems in the East Brunswick area. Analysis of noise [73] and air quality impacts were made in a lawsuit decided in New Jersey Superior Court. This case, in the early 1970s, was one of the early examples of environmental scientists playing a role in the design of a major highway in the US. The computer models allowed the court to understand the effects of roadway geometry, in this case width, vehicle speeds, proposed noise barriers, residential setback and pavement types. The outcome was a compromise that involved substantial mitigation of noise pollution and air pollution impacts. The dual-dual roadway setup was extended south in and on October 22, 1990, to exit 8A in Monroe Township.[74] Exit 8A was rebuilt, replacing the T-intersection with a trumpet interchange, this part of the project was completed in May 1991.[75]

In 1992, the turnpike was extended by four miles (6.4 km) from I-95 exits 68 to 72B, NJDOT had sold this segment of roadway to balance the state budget.[76]

In 1996, an HOV lane was opened between exits 11 and exits 14 on the truck lanes. The cost of this project was $361 million. It is reserved for use only during peak hours. By 1997, various improvements had also been made to the 1.5-mile (2.4 km) stretch between exits 14 and exits 15E in Newark. This part of the project cost $148 million.[45] On September 24 of that year, the Pennsylvania Turnpike Extension was officially renamed the Pearl Harbor Memorial Extension, this was done in remembrance of the Americans who died during the Attack on Pearl Harbor.[77]

In May 1998, the speed limit was increased from 55 to 65 miles per hour (89 to 105 km/h) between exits 1 and exits 13. Despite this, no other segment north of it had its speed limit raised.[45]

In the late 1990s, a project to improve exit 13A in Elizabeth was started. It was completed in 1999, at the cost of $140 million. It was funded by the developers of Jersey Gardens outlet mall; its construction was why the upgrade was carried out.[78] Later that year, a bill to rename the mainline road as the New Jersey Veterans Turnpike was proposed by the New Jersey General Assembly. Proposed by Jack Collins, this memorial would have resulted in $500,000 worth of signage replacement. Despite passing the assembly, it was never signed into law.[45]

In October 1997, groundbreaking was held on a project to reconstruct the Pearl Harbor Memorial Extension.[77] As part of this project, a new interchange with US 130 was built that was completed on December 17, 1999, replacing the old slip ramp in the area that fed onto local streets with many potholes.[79] in addition, the toll plaza was replaced with a new wider one that contained E-ZPass lanes; this part of the project was completed in February 2000.[80]

2000s to present

On September 30, 2000, NJTA began using E-ZPass for electronic toll collection.[81] In January 2004, the authority opened the refurbished 18W toll gate in Carlstadt; the refurbishment included two E-ZPass express lanes in both directions. In July 2004, the New Jersey Turnpike Authority opened the new exit 1 toll gate in Carneys Point Township, with 23 lanes, including two E-ZPass express lanes in either direction.[45]

In 2005, the authority opened exit 15X to allow access to the newly built Secaucus Junction train station.[82] The authority lowered the Eastern Spur (between mileposts 107.3 and 107.5 in Newark) in 2005. The lowered spur now consists of a minimum 15-foot (4.6 m) vertical clearance and a 12-foot (3.7 m) horizontal clearance on the shoulders underneath the Pulaski Skyway (US 1/9).[45]

In February 2006, the authority updated exit 8A in Monroe Township. The former exit ramp that allowed traffic onto Route 32 westbound, has been closed off. Instead, a new ramp leads to a traffic light at the intersection of the ramp and CR 535 in South Brunswick Township. CR 535 was expanded between the new ramp intersection and Route 32. The authority planned to build Route 92, an east–west spur from US 1 and Ridge Road in the township of South Brunswick to the mainline of the turnpike at exit 8A in Monroe Township. This proposition was cancelled on December 1, 2006.[83]

New Jersey Turnpike (I-95) northbound in Robbinsville Township

Throughout the first decade of the 21st century, the NJTA made repairs to several bridge decks, including the bridge crossing the Rancocas Creek, which was resurfaced in 2007.[84] The NJTA reconfigured exit 12 in the Borough of Carteret to reduce truck traffic. A new grade separated interchange-ramp was constructed from Roosevelt Avenue east and connects to the toll gate. In addition, the seven-lane toll gate was demolished and replaced with a new 17-lane one. This project was completed in April 2010, five to six months behind schedule.[85] The authority rebuilt exit 16W in the Borough of East Rutherford. Several new ramps were built, and old ones were destroyed. One major modification was destroying the old ramp from the tollgate to Route 3 west and having a new ramp swing around in the opposite direction and merge with Route 3 west, thereby completing the double trumpet-like interchange. This project was completed by March 2010.[86]

The NJTA began accepting E-ZPass on all toll lanes at all turnpike interchanges on March 5, 2011.[87] On April 28, 2011, attempts to privatize toll collection on the New Jersey Turnpike were thwarted as a deal between the New Jersey Turnpike Authority and two unions to reduce toll collector salaries was made instead.[88] The Authority reconstructed the Route 495 westbound overpass across the turnpike at exit 16E in Secaucus. This was finished in the middle of 2011.[89] Safety improvements were made at exit 2 in Woolwich Township, when the NJTA installed a traffic signal at the entrance to the turnpike with US 322, and the intersection was widened with turn lanes on all approaches. Construction was complete in late 2012.[90][91] On March 31, 2014, the NJTA began a new lane control system on the eastbound lanes of the Newark Bay–Hudson County Extension, using the shoulder as a travel lane between exit 14 to 14C.[92] This system was discontinued on May 20, 2019, as part of a bridge redecking project.[93]

On March 24, 2020, the NJTA temporarily suspended cash toll collection due to the COVID-19 pandemic. Drivers without E-ZPass transponders had their license plates photographed at the toll plazas and were sent bills in the mail. Cash collection resumed on May 19 of that year.[94] The NJTA also announced in 2020 that it would build E-ZPass express lanes at exit 18E;[95] the lanes opened in November 2021.[96]

On June 9, 2023, the American Association of State Highway and Transportation Officials approved designating the Eastern Spur of the New Jersey Turnpike as I-695.[97]

Widening between interchanges 6 and 9

Construction of the new lanes as seen in Robbinsville Township in July 2012
Completed 12-lane roadway from same point as above in November 2014
Three proposals for new exit 8 in East Windsor. Alternative 1 was chosen (with a few changes)

In November 2004, Governor Richard Codey advocated a plan to widen the turnpike by extending the dual-dual configuration 20.1 miles (32.3 km) south from exit 8A in Monroe Township to exit 6 in Mansfield Township. This was to be completed by 2014 when Pennsylvania was supposed to finish an interchange, that would connect its turnpike to the existing I-95 in Bristol Township, Pennsylvania. Finances were to be supplied by rerouting money from the planned Route 92 Turnpike extension.[98] As part of this project, the NJTA expanded the turnpike by changing the dual-dual configuration (from 2-3-3-2 to 3-3-3-3) between exit 9 in East Brunswick Township and exit 8A in Monroe Township. Minimal construction was needed since overpasses were already built with future expansion in mind. Only final preparation and paving of an outer lane in the outer roadways were required to accommodate the extra lane. New signage and lighting were installed as part of the widening project. It was thought that some transmission towers that ran near the turnpike would have to be reconfigured to make room for the newly constructed roadways. However, this idea was dismissed because it would have been cost prohibitive, and the towers, in fact, did not need to be relocated.[99] The widened turnpike features six lanes in each direction (3-3-3-3), double the previous capacity.[100][101] The following interchanges were upgraded with this widening project: exit 6 (Mansfield), exit 7 (Bordentown Township), exit 7A (Robbinsville), exit 8 (East Windsor), and exit 8A (Monroe).[102]

On July 2, 2009, a ceremonial groundbreaking took place near exit 8 to initiate the widening of the turnpike.[103] On January 28, 2014, the last two of the project's 31 construction contracts was awarded.[104] On May 17–18, 2014, the NJTA switched traffic from the inner roadway for the new outer roadway to do repairs and resurfacing of the inner roadway.[105] A total of six northbound lanes between exits 6 and 9 opened on October 26, 2014, while the southbound lanes opened a week later on November 3, 2014. The final cost reported to be $2.3 billion.[106][107] The project employed 1,000 workers a day, and at one point was the largest active road construction project in the Western Hemisphere.[108]

In late October 2015, the southbound inner roadway exit ramp at exit 7A was closed to make repairs to the overpass crossing over the truck lanes. Steel plates beneath the deck of the exit ramp overpass "were not built to specification" when it was originally constructed. The ramp was reopened in late November 2015.[109]

Project outline
Exit Interchange/toll gate location Mile Ramp
modifications
Expansion to toll gate Notes Start of construction
6 Mansfield Township 50.9 Build two-lane high-speed ramps to/from inner and outer roadways No Southern end of "dual–dual" setup late 2009
7 Bordentown Township 53.7 Build single lane ramps to/from inner and outer roadways No mid-2009
6N & 6S Hamilton Township 57.8 Build single lane inner and outer roadway exit/entrance ramps Woodrow Wilson Service Area (6N) & Richard Stockton Service Area (6S) late 2009
7A Robbinsville Township 60.5 Build new ramps to inner and outer roadways Yes—add three more lanes to gate Two-lane ramps to be built to enter northbound lanes and exit southbound lanes and single lane ramps to enter southbound lanes and exit northbound lanes mid-2009
8 East Windsor Township 67.6 Build new interchange with single lane ramps to/from inner and outer roadways, and ramp to maintenance shed Yes—new 12-lane toll gate New exit 8 was constructed east of the Turnpike, connecting directly to the Hightstown Bypass and Route 33 mid-2009
7S Cranbury Township 71.5 Build single-lane southbound ramps to/from inner & outer roadways Molly Pitcher Service Area on the southbound side early 2010
8A South Brunswick/Monroe Township 73.9 Build single-lane entrance ramp to southbound inner car lanes No early 2010

On January 1, 2007, the NJTA released its plan for exit 8 in East Windsor Township. The old interchange, located west of the turnpike, was demolished and replaced with a new one located to the east of the turnpike. The new interchange configuration opened in January 2013, featuring a new toll plaza consisting of 10 lanes, with direct access to Route 133 (Hightstown Bypass) without going through any traffic lights, as well as to Route 33 by using a grade-separated interchange.[110] Construction of a realigned Milford Road, near the interchange, was open to traffic in October 2011.[111] Milford Road was converted into an overpass crossing over the new interchange 8 ramp. The junction with the realigned Milford Road, Route 33 and Monmouth Street was also modified.[112]

Other construction

An older variable-message sign displaying a warning about construction ahead. These signs have since been replaced.
A newer variable-message sign displaying a warning about congestion ahead

Due to traffic congestion outside exit 8A, the NJTA plans to improve Route 32 from its intersection at US 130 in South Brunswick to the exit 8A tollgate in Monroe Township. Named the "Interchange 8A to Route 130 Connection", plans and dates have yet to be determined.[113]

To reduce congestion, the NJTA has widened Route 18 and reconstructed all the associated ramps at exit 9 (except the ramp to Route 18 north) in East Brunswick Township. Construction began in late 2012 and was completed in mid-2016.[114][115][116][117]

The authority is planning a 1.1-mile (1.8 km) roadway and bridge, called the "Tremley Point Road Connector", from Industrial Highway in the Borough of Carteret to Tremley Point Road in the City of Linden. The purpose of this project is to increase truck access to the Tremley Point industrial area in Linden while moving trucks off local streets in residential neighborhoods. The authority chose this access road rather than a full interchange with Tremley Point Road from the turnpike mainline because of its proximity to both exits 12 and 13.[118] The estimated completion date of the connector has yet to be determined,[119] but as of October 2019, a construction contract has been awarded.[120]

In conjunction with the Port Authority of New York and New Jersey's replacement of the Goethals Bridge, improvements are being studied at exit 13 in Elizabeth and Linden.[121]

The authority plans to improve exit 14A in Jersey City and connecting roads in Bayonne because the current interchange is in "poor condition" and suffers from chronic congestion. This is part of a bigger project that addresses future congestion along Route 440. Official groundbreaking occurred on March 11, 2015, with an expanded toll plaza and connector bridge targeted for completion in late 2018 with a $310 million budget.[122][123] The newly expanded exit 14A reopened in May 2018 ahead of its anticipated opening later in the year.[124]

All of the turnpike's original variable-message signs (VMS) were replaced from 2010 to 2015, and many new signs were also added. The replacement signs, which feature full graphic color matrix technology, are more up-to-date and feature travel times to major routes when not otherwise in use.[11]

The NJTA plans to add an additional lane in each direction between exits 1 and 4. Construction is planned to begin in 2025 and be completed in 2032.[125] The widening, which has been in the planning stage since 1992, will also involve the replacement or rehabilitation of 55 overpasses, as well as improvements to exits 1 through 4. In addition to this, residents, and congressmen, are lobbying for the authority and New Jersey Department of Transportation to construct a long-anticipated interchange between the turnpike and Route 42. This interchange would relieve tractor-trailer traffic on exit 3 (Route 168), which creates massive backups as it is the only exit to Camden, Philadelphia, and southward. This proposed interchange will finally have a direct connection to the Atlantic City Expressway, I-76, and I-676. It would remove the requirement to travel through long suburban avenues with many traffic signals.[126]

The authority plans to widen the Newark Bay Extension to six lanes. This would involve replacing 29 bridge structures, including the Newark Bay Bridge, as they are in poor condition, functionally obsolete, and unable to be naturally widened. Construction on the first phase of the project is expected to begin in 2026 and to be completed sometime between 2032 and 2034, with the other three phases currently undetermined. There are also currently plans to replace the Delaware River Bridge on the Pearl Harbor Memorial Extension, with construction on this project expected to begin sometime after 2030.[125]

Tolls

A toll ticket received at exit 15W in 2008
New Jersey Turnpike tollgate for Exit 8A in Monroe Township

The New Jersey Turnpike is a closed-system toll road, using a system of long-distance tickets, obtained once by the motorist upon entering and surrendered upon exiting at toll gates. The toll fee depends on the distance traveled—longer distances result in higher tolls. As of January 1, 2023, the automobile toll from exit 1 to exit 18 is $20.05 using cash and $20.01 using E-ZPass electronic toll collection.[127] If the ticket is lost, the driver must pay the highest toll fee upon exiting. In September 2000, the turnpike introduced E-ZPass electronic toll collection.[128] Discounts were available to all users of the E-ZPass system until 2002. The cost to implement the E-ZPass system forced the NJTA to eliminate the discounts during peak hours and instead impose a $1 per month E-ZPass fee to account holders. E-ZPass customers with New Jersey accounts still receive a discount during off-peak hours,[129] when the automobile toll from exit 1 to exit 18 is $14.15. Cash customers do not receive this discount.[130] Four toll plazas on the turnpike have Express E-ZPass lanes, allowing E-ZPass customers to travel through toll areas at highway speeds, thanks to the addition of E-ZPass sensors on an overhead gantry. These high-speed toll gates are located at the northern terminus of the road on both the Western Spur and the Eastern Spur, the southern terminus in Carneys Point, and on the Pennsylvania Turnpike Extension. At each location, traditional E-ZPass and cash lanes are also available.[131] Every toll lane on the turnpike accepts E-ZPass.

The non-tolled I-295, which parallels the turnpike for much of its southern length, is often used as an alternate route for shunpiking by locals and through travelers alike; before the expansion of the exit 1 toll plaza, this route was promoted through signage and radio announcements from the New Jersey State Police as a bypass of summer congestion at the plaza.

The Turnpike and the Garden State Parkway raised tolls in 2020 and 2021 and, in its 2023 budget, called for another toll increase of 7.4% in 2023. The NJTA said the increase was due to "…pressures on discretionary travel and costs due to an inflation rate of 8.3%.…"[132]

Exit list

Mainline and Eastern Spur

CountyLocationmi[1][2]kmExitDestinationsNotes
SalemPennsville Township0.721.16

I-295 south / US 40 west (Delaware Memorial Bridge) – Delaware
Southern terminus of US 40 concurrency; no access to I-295 north
Carneys Point Township1.121.80
US 40 east / Route 140 / CR 540 – Atlantic City, Penns Grove, Deepwater
Northern terminus of US 40 concurrency; signed for US 40 northbound, Route 140/CR 540 southbound; last northbound exit before toll
2.403.86Exit 1 Toll Plaza (southern end of ticket system)
GloucesterWoolwich Township12.8020.602 US 322 (CR 536) – Swedesboro, Glassboro
CamdenRunnemedeBellmawr
borough line
26.1042.003
Route 168 to A.C. Expressway – Camden
BurlingtonMount Laurel Township34.5055.524 Route 73 – Mount Laurel, Camden
Westampton Township44.1070.975Burlington, Mount HollyAccess via CR 541
Mansfield Township48.7078.38Southern terminus of dual-roadway setup (inner roadway for cars only, outer roadway for cars, trucks, and buses)
51.00–
51.60
82.08–
83.04
6





I-95 Toll south / Pearl Harbor Extension west to I-276 Toll west / Penna Turnpike – Philadelphia
Eastern terminus of Pearl Harbor Extension; southern terminus of I-95 concurrency
Bordentown Township53.3085.787 US 206 – Bordentown, Trenton
MercerRobbinsville Township60.5097.377A I-195 – Trenton, Shore Points
East Windsor Township67.50108.638
Route 33 / Route 133 west – Hightstown, Freehold
MiddlesexMonroeSouth Brunswick
township line
73.90118.938A
Route 32 to US 130 – Jamesburg, Cranbury
East Brunswick Township83.40134.229
Route 18 (CR 527) to US 1 – New Brunswick
Raritan River84.22135.54Basilone Memorial Bridge
Edison Township88.10141.7810

I-287 north / Route 440 north (CR 514) – Metuchen, Perth Amboy
Southern termini of I-287 and Route 440;[b] former exit 9A[133]
Woodbridge Township91.00146.4511
G.S. Parkway / US 9 – Woodbridge
Carteret95.90154.3412Carteret, RahwayAccess via CR 602
UnionElizabeth99.40159.9713 I-278 – Elizabeth, Staten Island
101.60163.5113A Newark Airport, Elizabeth SeaportAccess via Route 81 north
EssexNewark104.70168.5014–14C
I-78 Toll / Newark Bay Extension east / US 1-9 – Newark Airport, Holland Tunnel
Signed as exits 14 (west) and 14A-C (east); western terminus of Newark Bay Extension
105.60169.95



I-95 north / N.J. Turnpike north (Western Spur) to I-280 / Route 3 – George Washington Bridge, Sports Complex
Southern terminus of the Western Spur
106.90172.0415E

US 1-9 / US 1-9 Truck north – Newark, Jersey City
Signed for US 1-9 southbound, US 1-9 Truck northbound
HudsonKearny108.50–
108.80
174.61–
175.10
15W
I-280 west – Newark, Kearny
Southbound exit and northbound entrance; eastern terminus of I-280
Secaucus110.80178.3215XSecaucusTo Secaucus Junction
112.30180.7316E
Route 495 east – Lincoln Tunnel
Western terminus of Route 495; northbound exit and southbound entrance
Exit 18E Toll Plaza (northern end of ticket system)
112.70181.3717
Route 3 / Route 495 east – Lincoln Tunnel, Secaucus
Tolled southbound exit; no northbound access to Route 495; exit number not signed northbound
BergenRidgefield Park116.80187.97


I-95 south / N.J. Turnpike south (Western Spur) to Route 3 – Sports Complex
Northern terminus of the Western Spur
117.20188.6268 US 46 – The Ridgefields, Palisades ParkNo northbound entrance; last southbound exit before toll; exit number not signed northbound



I-95 north to I-80 west – George Washington Bridge, New York City
Continuation north as I-95 Extension
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Pearl Harbor Memorial Turnpike Extension

The entire route is in Burlington County.

Locationmi[1][2]kmExitDestinationsNotes
Delaware River0.000.00






I-95 Toll south to I-276 Toll west / Penna Turnpike west – Philadelphia, Harrisburg
Continuation into Pennsylvania; western terminus of I-95 concurrency
Delaware River–Turnpike Toll Bridge (westbound toll in Pennsylvania)
Florence Township2.604.186A US 130 – Florence, BurlingtonTolled westbound entrance; exit number not signed
Exit 6 Toll Plaza (western end of ticket system)
Mansfield Township6.5510.546


I-95 Toll north / N.J. Turnpike – New York City, Camden, Wilmington
Eastern terminus of I-95 concurrency; exit number not signed eastbound
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Newark Bay Extension

CountyLocationmi[1][2]kmExitDestinationsNotes
EssexNewark0.000.00


I-78 west / US 1-9 to US 22 west – Newark, Newark Airport, Clinton
Western terminus of I-78 concurrency
Exit 14 Toll Plaza (western end of ticket system)

I-95 Toll / N.J. Turnpike – New York, Trenton
Exit 14 on I-95/Turnpike
HudsonJersey City3.505.6314A Route 440 – Bayonne, Bayonne Bridge
5.508.8514BJersey City, Liberty State ParkAccess via Bayview Avenue
5.909.50Exit 14C Toll Plaza (eastern end of ticket system)

I-78 east – Holland Tunnel, Liberty Science Center, Light Rail Park-Ride
Eastern terminus of I-78 concurrency
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Western Spur

CountyLocationmi[1][2]kmExitDestinationsNotes
EssexNewark105.60169.95






I-95 Toll south / N.J. Turnpike south to I-78 / US 1-9 / US 22
Southern terminus of the Western Spur; toll road continues south
106.90172.0415E US 1-9 – Newark, Jersey CitySouthbound exit and northbound entrance
HudsonKearny108.50–
108.80
174.61–
175.10
15W
I-280 west – Newark, Kearny, The Oranges
Eastern terminus of I-280
BergenEast Rutherford112.70181.3716W Route 3 – Secaucus, Rutherford
Carlstadt113.80183.14Exit 18W Toll Plaza (northern end of ticket system)
114.07–
114.55
183.58–
184.35
19WMeadowlands Complex, American DreamNo northbound exit; E-ZPass only toll for southbound exit and northbound entrance
Ridgefield Park116.80187.97




I-95 north / N.J. Turnpike north to I-80 west / US 46 – George Washington Bridge, New York City
Northern terminus of the Western Spur
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

I-95 Extension

The entire route is in Bergen County.

Locationmi[1][2]kmExitDestinationsNotes
Ridgefield Park117.80189.58



I-95 Toll south / N.J. Turnpike south – Newark
Continuation south as Turnpike mainline
68Challenger RoadNorthbound exit only
Southern end of express (Upper Level) lanes and local (Lower Level) lanes
Teaneck Township119.00191.5169

I-80 west to G.S. Parkway – Hackensack, Paterson
Eastern terminus of I-80; exit number not signed northbound
119.40192.1670Leonia, TeaneckSigned as exits 70A (Leonia) and 70B (Teaneck) northbound; access via CR 56
Englewood120.90194.5771EnglewoodNorthbound exit and southbound entrance; access via Broad Avenue
Fort Lee121.50–
122.40
195.54–
196.98
72

US 9W north to Palisades Parkway – Fort Lee
No southbound exit; southern terminus of US 9W
72A
Route 4 west – Paramus
Southbound exit and northbound entrance; eastern terminus of Route 4
72B

US 1-9 south / US 46 west – Palisades Park
South end of US 1-9 / US 46 overlap; southbound exit and northbound entrance




I-95 north / US 1-9 north / US 46 east (George Washington Bridge) to I-87 – New York City
Continuation beyond Fort Lee Interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

In popular culture

21st century

  • Somerdale-based Flying Fish Brewing currently makes the "Exit Series" of beers, which are named in honor of various New Jersey Turnpike exits, with each beer intended to be reflective of the communities in or near where the relevant exit is located.[134]
  • In 2015, lyrics on Passenger's song "Riding to New York" on the Whispers album describe a man riding a bike from Minnesota to New York City: "And fly through Pennsylvania and the Jersey Turnpike tolls."[135]
  • From 2009 to 2012, "Jersey Turnpike" was the name of a dance move created by Deena Nicole Cortese of Jersey Shore, which aired on MTV.[136]
  • From 1999 to 2007, the opening credits of every episode of The Sopranos, which aired on HBO, features shots of the New Jersey Turnpike, including Exits 12, 13, 14-14C, and 15W.[137]
  • In 2001, the video game Need for Speed: The Run, a racing event starts on the Newark Bay Extension at Exit 14B before entering Jersey City and Liberty State Park and ending in the Holland Tunnel as the driver, who is the player of the game, is chased by police while driving into New York City.[138]
  • In 2001, the song "Where I Come From" by country singer Alan Jackson begins with the lyrics: "Well I was rollin' wheels and shiftin' gears 'round that Jersey Turnpike."

20th century

  • In 1999, on The West Wing episode "The State Dinner", character Leo McGarry responds to a truckers union representative who uses inappropriate language: "This is the White House. It's not the Jersey Turnpike."[139]
  • In 1999, in the film Being John Malkovich, characters are transported into John Malkovich's mind and then are suddenly dropped in a ditch beside the New Jersey Turnpike.[140]
  • In 1988, one of the promotional taglines in the film Moving is: "On the New Jersey Turnpike, no one can hear you scream."
  • In 1986, The Dead Milkmen's album Eat Your Paisley! includes the song "Vince Lombardi Service Center", the name of a New Jersey Turnpike service center in Ridgefield, New Jersey, as a CD bonus track.[141]
  • In 1982, the Bruce Springsteen song, "State Trooper" on the Nebraska album, mentions the New Jersey Turnpike in its opening lyric: "New Jersey Turnpike, riding on a wet night. 'Neath the refinery's glow, out where the great black rivers flow."[142]
  • In 1981, the character "Paulie Herman" on Saturday Night Live, played by Joe Piscopo, was known for an ongoing show segment in which he says: "Are you from Jersey? I'm from Jersey. What exit?", referring to New Jersey Turnpike and Garden State Parkway exits.[143][144]
  • In 1975, the Bruce Springsteen song "Jungleland" on the Born to Run album mentions the New Jersey Turnpike in its lyrics: "Man, there's an opera out on the Turnpike. There's a ballet being fought out in the alley. Until the local cops, cherry tops, rips this holy night."
  • In 1972, Simon & Garfunkel's song "America" includes the lyric: "Counting the cars on the New Jersey Turnpike".[7]
  • In 1966, the autobiographical Mamas & Papas song "Creeque Alley" includes the lines: "Standing on the turnpike, thumb out to hitchhike/Take her to New York right away", referring to a broke Mama Cass Elliot hitching a ride from Maryland back to New York City via the New Jersey Turnpike.
  • In 1956, Chuck Berry's song "You Can't Catch Me" includes the lyrics: "New Jersey Turnpike in the/wee wee hours I was/rolling slowly 'cause of/drizzlin' showers."

See also

Notes

  1. ^ The Garden State Parkway, although maintained by NJTA, is not considered part of the turnpike.
  2. ^ Exit 10 was originally built to connect with the Garden State Parkway, and Exit 11 was built to service US 9. Both interchanges opened on November 30, 1951, and were reconfigured to their current patterns by 1966.

References

  1. ^ a b c d e f g h i j k l m New Jersey Department of Transportation. "Route 95 Straight Line Diagram" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on March 4, 2016. Retrieved March 17, 2020.
  2. ^ a b c d e f g h i j k New Jersey Department of Transportation. "Route 700 Straight Line Diagram" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on March 4, 2016. Retrieved March 17, 2020.
  3. ^ a b New Jersey Department of Transportation. "Route 95W Straight Line Diagram" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on January 13, 2016. Retrieved March 17, 2020.
  4. ^ a b New Jersey Department of Transportation. "Route 78 Straight Line Diagram" (PDF). New Jersey Department of Transportation. Archived (PDF) from the original on March 4, 2016. Retrieved March 17, 2020.
  5. ^ a b National Highway System: New Jersey (PDF) (Map). Federal Highway Administration. Retrieved August 29, 2019.
  6. ^ Blackwell, Jon. "1949: Highway of dreams". The Trentonian. Archived from the original on October 15, 2011. Retrieved November 19, 2011.
  7. ^ a b Frassinelli, Mike (October 2, 2011). "Making unexpected stops along the N.J. Turnpike". The Star-Ledger. Newark, NJ. Archived from the original on November 12, 2011. Retrieved November 19, 2011.
  8. ^ Cauchon, Dennis (January 27, 2008). "Drivers to see major toll hikes". USA Today. Archived from the original on May 28, 2010. Retrieved June 2, 2009.
  9. ^ South Brunswick Township. "1940s–1950s Moving and Building". South Brunswick Township. Archived from the original on March 16, 2012. Retrieved October 16, 2011.
  10. ^ a b c d e f g h i Google (March 28, 2019). "Overview Map of New Jersey Turnpike" (Map). Google Maps. Google. Retrieved March 28, 2019.
  11. ^ a b "New Jersey Turnpike and Garden State Parkway to get new VMS". Archived from the original on April 1, 2012. Retrieved October 16, 2011.
  12. ^ Natzke, Stefan; Neathery, Mike & Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Federal Highway Administration. Archived from the original on September 24, 2012. Retrieved July 1, 2012.
  13. ^ "Raritan to honor its fallen son with 33rd Annual John Basilone Memorial Parade". nj.com. September 16, 2014. Archived from the original on October 24, 2018. Retrieved October 24, 2018.
  14. ^ "Hybrid vehicle use in N.J. Turnpike High Occupancy Vehicle lanes to take effect Monday" (Press release). New Jersey Department of Transportation. May 14, 2006. Archived from the original on June 3, 2013. Retrieved November 19, 2011.
  15. ^ "Wallberg-Lovely Memorial Bridge". legion.org. Archived from the original on October 24, 2018. Retrieved October 24, 2018.
  16. ^ Cooper, Anderson (August 15, 2006). "The most dangerous two miles in America". CNN. Archived from the original on June 27, 2011. Retrieved March 27, 2007.
  17. ^ "Manual for Traffic Control in Work Zones" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on June 3, 2013. Retrieved June 11, 2012.
  18. ^ "The Four Chaplins". davchapter16greenburghny.org. Archived from the original on September 1, 2018. Retrieved October 24, 2018.
  19. ^ a b "Hidden New Jersey". hiddennj.com. Archived from the original on September 23, 2017. Retrieved October 24, 2018.
  20. ^ a b New Jersey Department of Transportation. "Interstate 95 straight line diagram" (PDF). Trenton: New Jersey Department of Transportation. Archived (PDF) from the original on March 4, 2016. Retrieved November 17, 2017.
  21. ^ Google (December 22, 2019). "Overview Map of Western Spur of New Jersey Turnpike" (Map). Google Maps. Google. Retrieved December 22, 2019.
  22. ^ "'World's most expensive road' opened in N.J. in 1956". nj.com. April 24, 2017. Archived from the original on September 19, 2017. Retrieved May 2, 2018.
  23. ^ "'World's most expensive road' opened in N.J. in 1956". nj.com. April 24, 2017. Archived from the original on July 23, 2018. Retrieved October 24, 2018.
  24. ^ "Bridge Will Link Turnpikes Today". the New York Times. May 25, 1956. p. 25. Retrieved January 15, 2022.
  25. ^ "PA Turnpike / I-95 Interchange Project". Pennsylvania Turnpike Commission. Archived from the original on April 15, 2012. Retrieved May 1, 2012.
  26. ^ Knackmuhs, Ginny (February 22, 2004). "SOAPBOX; The Rest (Stop) Is History". The New York Times. Retrieved November 26, 2018.
  27. ^ "New Jersey Rest Areas and Service Plazas". i95exitguide.com. Archived from the original on October 25, 2018. Retrieved October 24, 2018.
  28. ^ "Jersey: How to Get More Mileage Out of Name Recognition". The New York Times. December 7, 1997. Archived from the original on December 16, 2014. Retrieved December 12, 2014.
  29. ^ "Part of Ark Road to Be Closed for Repairs". Courier-Post. May 8, 1994. p. 27. Archived from the original on September 15, 2017. Retrieved September 14, 2017 – via Newspapers.com.
  30. ^ Google (October 16, 2011). "Interstate 95 and New Jersey Route 81" (Map). Google Maps. Google. Retrieved October 16, 2011.
  31. ^ New Jersey Turnpike Authority. Lane Closure Request Form. New Jersey Turnpike Authority.
  32. ^ "New Jersey transportation commissioner considers selling naming rights to NJ Turnpike rest stops". Daily News. New York. Associated Press. March 28, 2010. Archived from the original on August 15, 2011. Retrieved July 7, 2011.
  33. ^ "Travel Resources: Interchanges, Service Areas & Commuter Lots". New Jersey Turnpike Authority. Archived from the original on December 13, 2007. Retrieved March 21, 2015.
  34. ^ "Turnpike service area in Woodbridge reopens". MyCentralJersey.com. Associated Press. November 23, 2015. Retrieved November 23, 2015.
  35. ^ "Tesla charging stations to be installed on N.J. Turnpike starting next week". NJ.com. Advance Media. February 18, 2015. Archived from the original on July 29, 2016. Retrieved August 2, 2016.
  36. ^ a b "Roadside Assistance". New Jersey Turnpike Authority. Retrieved May 20, 2024.
  37. ^ "Troop D Road Stations". New Jersey State Police. Retrieved May 20, 2024.
  38. ^ "Model of Route 100". New Jersey Department of Transportation. Retrieved September 23, 2009.[permanent dead link]
  39. ^ "Route 100 under construction". New Jersey Department of Transportation. Retrieved September 22, 2009.[permanent dead link]
  40. ^ Troast Pitney, Kathleen (November 2, 2001). "Love/hate letters" (Letter to the Editor). The Star-Ledger. Newark, NJ. Archived from the original on March 3, 2016. Retrieved July 7, 2011.
  41. ^ Schwab, Armand Jr. (January 20, 1952). "City Linked to Super-Highway". The New York Times. p. X17. Archived from the original on October 1, 2012. Retrieved September 25, 2010.
  42. ^ Hart, pp. 173–174.[full citation needed]
  43. ^ American Council of Engineering Companies of New Jersey (March 6, 2006). "35th Annual Engineering Excellence Awards Dinner program" (PDF). American Council of Engineering Companies of New Jersey. Archived from the original (PDF) on March 4, 2009. Retrieved October 27, 2007.
  44. ^ Cho, Aileen (November 29, 2004). "Busy New Jersey Span Gets New Bearings, and Shorter Too". Engineering News-Record.
  45. ^ a b c d e f g h i j k Anderson, Steve. "New Jersey Turnpike (I-95)". Eastern Roads. Self-published. Archived from the original on July 9, 2011. Retrieved July 7, 2011.
  46. ^ "'World's most expensive road' opened in N.J. in 1956". nj.com. April 24, 2017. Archived from the original on September 19, 2017. Retrieved May 2, 2018.
  47. ^ State of New Jersey, Laws of 1927, Chapter 319.[full citation needed]
  48. ^ Williams, Jimmy & Williams, Sharon. "1927 New Jersey Road Map". 1920s New Jersey Highways. Archived from the original on October 31, 2007. Retrieved October 8, 2008.
  49. ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  50. ^ "Interchange 12, May 16, 1962". The Daily Register. May 16, 1962. p. 15.
  51. ^ Haff, Joseph O. (August 8, 1962). "Jersey Turnpike Starts Elimination Of 3 Interchanges". The New York Times. ISSN 0362-4331. Retrieved July 22, 2024.
  52. ^ "Rt. 3 Turnpike Exit to Close". The Herald-News. June 20, 1963. p. 1. Retrieved January 25, 2024.
  53. ^ 1964 annual report[full citation needed]
  54. ^ "Holiday Exodus Starts; Traffic Jam on Route 3". The Herald-News. May 29, 1964. p. 1. Retrieved January 25, 2024.
  55. ^ "Edison Interchange Opens". The Central New Jersey Home News. January 13, 1970. p. 1. Retrieved January 16, 2024.
  56. ^ "Program Starts To Widen Pike". The Morning Call. November 16, 1966. p. 6. Retrieved January 16, 2024.
  57. ^ "Pike's Outer Lanes Finally Opened". The Central New Jersey Home News. January 14, 1970. p. 1. Retrieved January 16, 2024.
  58. ^ "Pike Opens Meadowlands Section". The Central New Jersey Home News. September 4, 1970. p. 20. Retrieved January 16, 2024.
  59. ^ "3 northbound lanes open on New Jersey Turnpike". The Herald-News. November 15, 1973. p. 5. Retrieved January 16, 2024.
  60. ^ "Turnpike 12-Lane Strip At E. Brunswick Opens". The Sunday News. January 13, 1974. p. 63. Retrieved January 16, 2024.
  61. ^ "Turnpike opens renovated lanes". The Record. October 23, 1990. p. 4. Retrieved January 16, 2024.
  62. ^ "Turnpikes Link to I-80 Open Today". The Jersey Journal. October 20, 1971. p. 44. Retrieved January 16, 2024.
  63. ^ Sullivan, Ronald (February 20, 1977). "Turnpike Drops Cross-State Road". The New York Times. p. 341. Archived from the original on February 3, 2014. Retrieved March 4, 2013.
  64. ^ Bennett, Don (January 22, 2011). "Driscoll Expressway ended up the Road to Nowhere". Lacey Patch. Archived from the original on April 25, 2012. Retrieved November 19, 2011.
  65. ^ Highway accident report : series of multivehicle collisions and fires under limited visibility conditions: New Jersey Turnpike, Gate 15 and U.S. Route 46, Oct. 23 and 24, 1973. National Transportation Safety Board. 1975. Retrieved April 11, 2011. The National Transportation Safety Board determines that the probable cause of this series of multivehicle collisions was the penetration of vehicles into areas of severely reduced visibility due to fog and smoke, the latter occasioned by fires adjacent to the turnpike which had not been promptly extinguished. The delay in closing the affected roadways by the New Jersey State Police contributed to the number of accidents.
  66. ^ 1974 annual report[full citation needed]
  67. ^ "New Access Road Opens to Airport". Asbury Park Press. 1977-05-29. p. 2. Retrieved 2024-01-21.
  68. ^ "New turnpike interchange, highway open". Courier-Post. June 11, 1982. p. 17. Retrieved July 22, 2024.
  69. ^ Salgado, Robert J. (July 3, 1988). "Turnpike to Expand Interchange 7". The New York Times. ISSN 0362-4331. Retrieved July 22, 2024.
  70. ^ 1985 annual report[full citation needed]
  71. ^ New Jersey Turnpike Authority (1987). New Jersey Turnpike 1987 Annual Report (Report). New Brunswick: New Jersey Turnpike Authority.[page needed]
  72. ^ Shadely, 1973[full citation needed]
  73. ^ "Turnpike opens renovated lanes". The Record. October 23, 1990. p. 4. Retrieved January 16, 2024.
  74. ^ https://ghcci.com/projects/nj-turnpike-interchange-8a-contract-w-4503/[bare URL]
  75. ^ Gray, Jerry (January 27, 1992). "Fight Over Florio Budget Plan Heating Up in Hostile Trenton". The New York Times. Retrieved January 29, 2010.
  76. ^ a b 1997 annual report[full citation needed]
  77. ^ Holusha, John (August 29, 1999). "Commercial Property/Jersey Gardens: Outlet Mall Near Newark Airport Prepares to Open". The New York Times. ISSN 0362-4331. Retrieved November 26, 2022.
  78. ^ "New Jersey Turnpike—Pennsylvania Extension". Philly Roads. Retrieved August 10, 2024.
  79. ^ 2000 annual report[full citation needed]
  80. ^ "E-ZPass Unveiled on New Jersey Turnpike". The New York Times. October 1, 2000. ISSN 0362-4331. Retrieved July 9, 2021.
  81. ^ Mansnerus, Laura (February 5, 2006). "A Billion-Dollar Bet". The New York Times. Archived from the original on March 30, 2016. Retrieved November 22, 2011.
  82. ^ "Route 92-turnpike connection project off the table—for now: Official says expansion of turnpike between exits 6 and 9 is the top priority". Daily Record. Morristown, NJ. December 2, 2006.
  83. ^ Kolluri, Kris. 2007 Annual Report (PDF) (Report). New Jersey Turnpike Authority. Archived from the original (PDF) on February 2, 2012. Retrieved March 4, 2012.
  84. ^ Rommel, Leo D. (May 17, 2009). "Construction on Turnpike Exit 12 nearly complete". MyCentralJersey. Gannett. Archived from the original on July 19, 2011. Retrieved July 7, 2011.
  85. ^ Tomer, Richard L. (March 5, 2009). "Public Notice: NAN-2006-3095-WCA" (PDF). US Army Corps of Engineers. Archived from the original (PDF) on July 22, 2011. Retrieved July 7, 2011.
  86. ^ "E-ZPass soon to be accepted at all lanes on New Jersey Turnpike" (PDF) (Press release). New Jersey Turnpike Authority. March 11, 2011. Archived from the original (PDF) on June 28, 2011. Retrieved July 7, 2011.
  87. ^ Higgs, Larry (April 28, 2011). "Toll privatization off the table as unions agree to cut salaries". Asbury Park Press. Retrieved May 3, 2011.
  88. ^ "New Jersey Turnpike Authority Construction Contract Awards" (PDF). New Jersey Turnpike Authority. 2009. Archived from the original (PDF) on October 19, 2012. Retrieved July 7, 2011.
  89. ^ "New traffic signal activated at Route 322 intersection with NJ Turnpike Interchange 2 toll plaza in Woolwich" (Press release). New Jersey Department of Transportation. July 24, 2012. Archived from the original on August 31, 2012. Retrieved October 7, 2012.
  90. ^ McCormick Taylor, Inc. "Final Design and Environmental Permitting for Improvements at Interchange 2" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on February 1, 2012.
  91. ^ "Shoulder Open as a Travel Lane on the NJ Turnpike Newark Bay–Hudson County Extension Eastbound Between Interchange 14 to 14C" (PDF). New Jersey Turnpike Authority. 2014. Archived from the original (PDF) on May 16, 2014. Retrieved March 29, 2014.
  92. ^ Journal, Jersey (May 4, 2019). "Farewell, extra Extension lane, we hardly knew ye | Jersey Journal editorial". nj.com. Retrieved May 17, 2019.
  93. ^ "Coronavirus News: Cash Tolls Returning to NJ Turnpike and Garden State Parkway". WABC. May 16, 2020. Archived from the original on January 14, 2021. Retrieved December 21, 2020.
  94. ^ Higgs, Larry (January 28, 2020). "One of the Turnpike's busiest toll plazas is getting express lanes". nj. Retrieved November 26, 2022.
  95. ^ New Jersey Turnpike [@njturnpike] (November 21, 2021). "The new express E-ZPass lanes at Interchange 18E are open to traffic" (Tweet). Retrieved November 26, 2022 – via Twitter.
  96. ^ Special Committee on U.S. Route Numbering (June 9, 2023). "2023 Spring Meeting Report to the Council on Highways and Streets" (PDF) (Report). Washington, DC: American Association of State Highway and Transportation Officials. Retrieved October 22, 2023.
  97. ^ Smothers, Ronald (December 1, 2004). "New Jersey Set to Expand Turnpike". The New York Times. Archived from the original on April 24, 2009. Retrieved July 7, 2011.
  98. ^ "Executive Order No. 215 Environmental Impact Statement" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on August 24, 2009. Retrieved January 16, 2012.
  99. ^ "Turnpike authority to hold public information centers regarding widening project" (PDF) (Press release). New Jersey Turnpike Authority. November 20, 2006. Archived from the original (PDF) on March 27, 2009. Retrieved July 7, 2011.
  100. ^ "Gov. Christie, NJDOT Commissioner FoxPraise $2.3 Billion NJ Turnpike Infrastructure Investment Project" (PDF) (Press release). New Jersey Turnpike Authority. Archived from the original (PDF) on November 3, 2014. Retrieved November 3, 2014. The Widening Program created a three-lane Outer Roadway in each direction over the 25 miles between Interchange 6 in Mansfield Township, Burlington County, and Interchange 8A in Monroe Township, Middlesex County.
  101. ^ Giambusso, David (July 2, 2009). "$2.7B N.J. Turnpike widening project begins". The Star-Ledger. Newark, NJ. Archived from the original on August 16, 2011. Retrieved March 31, 2012.
  102. ^ Duffy, Erin (July 2, 2009). "$2.7 billion Turnpike Widening Under Way". The Trenton Times. Archived from the original on June 5, 2011. Retrieved July 7, 2011.
  103. ^ "Proceedings of the New Jersey Turnpike Authority" (PDF). New Jersey Turnpike Authority. January 29, 2014. Archived from the original (PDF) on November 29, 2014. Retrieved November 15, 2014.
  104. ^ "Timeline Photos". New Jersey Turnpike Authority. Archived from the original on May 2, 2018. Retrieved October 4, 2014 – via Facebook.
  105. ^ Schaefer, Mari A. (October 27, 2014). "Expanded lanes open on New Jersey Turnpike". The Philadelphia Inquirer. Archived from the original on March 4, 2016. Retrieved November 3, 2014.
  106. ^ Higgs, Larry (November 3, 2014). "New southbound Turnpike lanes open". The Star-Ledger. Newark, New Jersey. Archived from the original on November 6, 2014. Retrieved November 3, 2014.
  107. ^ "Interchange 6 to 9 Widening Program Website". Archived from the original on July 8, 2007. Retrieved January 16, 2012.
  108. ^ "NJTA to Close Exit from Southbound Turnpike Car Lanes to Interchange 7A for Bridge Repairs" (PDF) (Press release). New Jersey Turnpike Authority. October 15, 2015. Archived from the original (PDF) on November 6, 2015. Retrieved October 24, 2015.
  109. ^ Mease, Alyssa. "Part of New NJ Turnpike toll plaza opens at Interchange 8 in East Windsor". The Times of Trenton. Archived from the original on January 26, 2013. Retrieved March 6, 2013.
  110. ^ "Construction Updates: NJ Turnpike Interchange 6 to 9 Widening Program". New Jersey Turnpike Authority. Archived from the original on February 27, 2012. Retrieved March 31, 2012.
  111. ^ Persico, Joyce J.; Kitchenman, Andrew (January 1, 2007). "Pike plan raises concern". The Trenton Times. Archived from the original on January 3, 2007. Retrieved July 7, 2011.
  112. ^ New Jersey Turnpike Authority (January 8, 2009). "Local CMAQ Mobility Initiatives" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on September 27, 2011. Retrieved July 7, 2011.
  113. ^ Higgs, Larry (October 15, 2015). "What project is backing up Route 18? Ask @CommutingLarry". NJ.com. Archived from the original on July 21, 2018. Retrieved July 21, 2018.
  114. ^ Saccenti, John (March 18, 2011). "Turnpike Authority to Widen Route 18 at Exit 9". East Brunswick Patch. Archived from the original on June 2, 2011. Retrieved July 7, 2011.
  115. ^ "Interchange 9 Improvement Project" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on February 1, 2012. Retrieved January 15, 2012.
  116. ^ Loyer, Susan (February 24, 2014). "Two road projects to address traffic woes on Route 18 in East Brunswick". MyCentralJersey.com. Archived from the original on October 15, 2014. Retrieved October 9, 2014.
  117. ^ New Jersey Turnpike Authority (January 24, 2009). "1.0 Summary of the Project (TPRC)". Tremley Point Connector Road Project Environmental Assessment. New Jersey Turnpike Authority. Archived from the original (PDF) on January 14, 2009. Retrieved July 7, 2011.
  118. ^ New Jersey Turnpike Authority (January 24, 2009). "Tremley Point Connector Road Project". New Jersey Turnpike Authority. Archived from the original on January 14, 2009. Retrieved July 7, 2011.
  119. ^ "AGENDA Board Meeting" (PDF). New Jersey Turnpike Authority. October 22, 2019. p. 5.
  120. ^ Louis Berger Group; Parsons Brinckerhoff. "Goethals Bridge Modernization Project". United States Coast Guard and the Port Authority of New York and New Jersey. Archived from the original on January 24, 2013. Retrieved May 3, 2010.
  121. ^ Gannett Fleming, Inc. (November 2012). "Preliminary Engineering & Environmental Studies For Improvements at Interchange 14A: Public Hearing Report" (PDF). New Jersey Turnpike Authority. Archived from the original (PDF) on September 16, 2013. Retrieved March 12, 2015.
  122. ^ Lin, Jonathan (March 11, 2015). "Hudson County pols, Turnpike Authority break ground on Exit 14A project". The Jersey Journal. Archived from the original on March 15, 2015. Retrieved March 12, 2015.
  123. ^ "14A toll plaza in Bayonne reopens after $286M makeover". The Jersey Journal. May 21, 2018. Archived from the original on May 28, 2018. Retrieved May 30, 2018.
  124. ^ a b "Capital Projects". NJTA. Retrieved August 21, 2022.
  125. ^ Matthews, Mark (January 26, 2023). "$2 Billion NJ Turnpike Widening for Exits 1-4, and Local Officials Want a Route 42 Connector". 42 Freeway. Retrieved July 25, 2024.
  126. ^ "2023 Toll Rates New Jersey Turnpike - Class 1 Passenger Cars (2 Axles)" (PDF). New Jersey Turnpike Authority. Retrieved April 3, 2023.
  127. ^ Ozbay, Kaan; Yanmaz, Ozlem; Holguin-Veras, Jose (April 11–13, 2005). "The New Jersey Turnpike Road Pricing Initiative: Analysis Traffic Impact" (PDF). PIARC Seminar on Road Pricing with Emphasis on Financing, Regulation and Equity. Cancun, Mexico: World Road Association (PIARC). Archived from the original (PDF) on September 19, 2011. Retrieved July 6, 2011.
  128. ^ New Jersey Turnpike Authority. "Traffic Resources: Toll Rates". New Jersey Turnpike Authority. Archived from the original on April 6, 2012. Retrieved March 6, 2012.
  129. ^ New Jersey Turnpike Authority. "NJTA- Toll Rate Calculator". New Jersey Turnpike Authority. Archived from the original on October 20, 2007. Retrieved October 22, 2007.
  130. ^ "The New Jersey Turnpike Authority". New Jersey Turnpike and Garden State Parkway. March 26, 2017. Retrieved April 11, 2023.
  131. ^ Higgs, Larry (October 25, 2022). "New Jersey Turnpike, Parkway tolls are going up for the 3rd year". pennlive. Retrieved October 28, 2022.
  132. ^ "Agree on Toms River Spur Connection with Turnpike". The Daily Home News. New Brunswick, New Jersey. April 27, 1966. p. 9. Retrieved October 15, 2019 – via Newspapers.com.
  133. ^ "Exit Series". Flying Fish Brewing. Archived from the original on March 7, 2016. Retrieved March 9, 2016.
  134. ^ "Riding to New York". Genius.com. Retrieved September 21, 2020.
  135. ^ "What is the New Jersey Turnpike Dance?". Archived from the original on March 21, 2020. Retrieved March 21, 2020.
  136. ^ Abdeljabbar, Falasten M. (August 16, 2001). "Jersey loves 'The Sopranos' best". The Jersey Journal. Archived from the original on October 23, 2013. Retrieved November 19, 2011.
  137. ^ Need for Speed The Run: Walkthrough Part 47 (Hard) Stage 10: New Jersey Turnpike. SwissGameGuides. YouTube. November 19, 2011. Archived from the original on July 7, 2015. Retrieved November 5, 2013.
  138. ^ Sorkin, Aaron; Redford, Paul (November 10, 1999). "The State Dinner". The West Wing. Season 1. Episode 7. Event occurs at 8:40. NBC.
  139. ^ Bernard, Jami (October 29, 1999). "Batty, Brilliant 'John Malkovich' Kafka Meets N.j. Turnpike In The Ultimate Head Trip". The New York Times. Retrieved November 19, 2011.
  140. ^ "The Dead Milkmen; Eat Your Paisley". All Music Guide. Archived from the original on December 1, 2013. Retrieved October 22, 2013.
  141. ^ "State Trooper by Bruce Springsteen". brucespringsteen.net. Archived from the original on November 27, 2011. Retrieved November 19, 2011.
  142. ^ Santora, Marc (November 11, 2014). "'What Exit?' For Some in New Jersey, the Answer Has Changed". The New York Times. Archived from the original on January 31, 2018.
  143. ^ Rose, Lisa (January 20, 2014). "Joe Piscopo looks back on the origins of the immortal Jersey joke, 'What exit?'". Newark Star-Ledger. Archived from the original on January 31, 2018.

Further reading

External links