National Highway 13 (Nepal)

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

National Highway 13

राष्ट्रिय राजमार्ग १३ (Nepali)
BP Highway
BP Highway in red
BP highway Roshi river.jpg
Route information
Maintained by MoPIT (Department of Roads)
Length158 km (98 mi)
Major junctions
FromDhulikhel
ToBardibas
Location
CountryNepal
Primary
destinations
Banepa, Dhulikhel, Dumja, Mangaltar, Sindhuli, Bardibas
Highway system
NH05 NH07
BP Highway
Selfie Danda, BP Highway, Sindhuli

The BP Highway or NH6 (previously: H06) is a highway in eastern Nepal that links Kathmandu Valley with the Eastern Terai region. It is named after the former leader of Nepal, BP Koirala. This highway is the shortest link between Kathmandu valley and the Terai region in Nepal. Construction of the highway began in 1996 and after encountering different issues with materials, manpower and budget, the road was finally completed and handed over to the Nepalese government on 3 July 2015.[1][2]

History

The construction of Banepa Sindhuli Bardibas Road started in November 1996 with a grant assistance of Government of Japan. The highway was handed over by Japanese ambassador to Nepal Mr. Masashi Ogawa to the then Prime Minister of Nepal Mr. Sushil Koirala. Koirala inaugurated the highway during a ceremony held at Dhulikhel, Kavre.[3]

Project Cost

The total cost of the project from start to completion was NPR. 21.5 billion (¥ 26 billion).[4]

Project Phases

• Section I Bardibas- Sindhulibazar section (37 km)

• Section II Sindhulibazar- Khurkot section (39 km)

• Section III Khurkot - Nepalthok section (32 km)

• Section IV Nepalthok-Dhulikhel section (50 km)

Early Development Plans

Out of these sections, construction of Bardibas - Sindhuli Bazar section started in November 1996 and was completed in March 1998. The construction of this section included 9 bridges and 17 causeways over the 37 km of road, which was constructed in 1987. This section has been opened to traffic since its completion in 1998.

The construction of Nepalthok-Dhulikhel section started in April 1998 and is under construction. This section includes construction of 50 km of road with 5 bridges and 6 causeways. Out of 50 km, 34 km has been completed and is already open to public traffic while rest of the road was expected to be complete by March 2003.

The construction of Sindhulibazar-Khurkot section was slated to start in January 2001, this section includes construction of 39 km of road with a bridge and 3 causeways. Earthwork over 12.5 km of this road section was completed in the previous phase. This section was expected to be complete by 2007.[5]

Environmental Issues

After the promulgation of Environmental Protection Act (EPA) for the first time during the basic design of section II Sindhulibazar Khurkot section, a Complete Environmental Impact Assessment was conducted. Extensive discussion on various aspects on environmental issues was discussed with the local people and their concerns are properly addressed. Furthermore, various slope stabilization techniques has been adopted, this includes use of retaining and breast walls, crib works, gabion works, geotextiles and most interesting being the bio-engineering works which includes the locally available techniques like plantation of trees, shrubs including turfing and the soil seeding method imported from Japan. Though initially this technique has been found little expensive because most of the materials used in this method being imported from Japan and for making this method economical effort has been made to use the locally available materials so that this method could be extensively used in Nepal.

Other Issues

In order to effectively address the most common local issues related to local drinking water supply and irrigation channels to the local fields. This project has taken this challenge to properly relocate the existing drinking water supply line and the irrigation channels so that the effect from these could be minimized. Extensive discussion with the locals regarding the environmental issues has been very useful for the project, however the late realization and awareness in these issues is still a challenge to the project to address issues to be faced in later stages of the project execution.

Technologies Used

During the construction of the project different innovative technologies have been implemented. Specially Shotcrete has been implemented throughout the highway in order to control landslides.[5] Geotech has been used in order to stabilise the soil in various sections of the highway. It's the first time such technologies have been used in Nepal for constructing highway.[6]

Route

This route is vitally important in that it is the only major eastbound exit from highly populated and quake-prone Kathmandu Valley; it is critical to be completed for emergency evacuation and relief purposes.[7] Currently, Kathmandu relies solely upon one congested westward "highway" for its road links to the south: India, the Terai region, and Bangladesh. The capital region has no rail or navigable river links. Despite this, the highway criss-crosses through mountain regions with hairpin turns of widths of one bus wide in numerous areas.

The entire highway from Kathmandu to Bardibas via Dhulikhel had a project completion date of 2011, for a total of 158 km.[needs update][8] It now is projected to be finished in March 2015[9] The reasons for the delay include Japanese contractors lack of security for explosives, thus the road was created with manual labor, which later there was an admission that this was a mistake.,[10] as well as parliament gridlock. This alternate route will reduce the journey from Kathmandu to Bardibas and other cities east of Bardibas by at least 200 km.

The highway has existed in stages for decades, with large unimproved portions. The 37 km section of the lowlands between Bardibas and Sindhuli has been in operation for many years, the 50 km section between Banepa and Nepalthok of Bagmati region was completed in 2005 with Japanese grant money.[7] However, a major part linking the two improved regions was only completed in February 2009, funded with Japanese loans and contractors.

Gallery

References

  1. ^ "BP Highway handed over". Kathmandu Post. Retrieved 27 November 2015.
  2. ^ Bhandari, Anil. "Transport operators block vehicles on BP Highway". My Republica. Retrieved 16 May 2019.
  3. ^ "BP Highway handed over". kathmandupost.ekantipur.com. Retrieved 27 November 2015.
  4. ^ "BP highway officially handed over to Nepal". kathmandupost.ekantipur.com. Retrieved 27 November 2015.
  5. ^ Jump up to: a b "::..DoR || Road Projects ..::". dor.gov.np. Archived from the original on 22 December 2015. Retrieved 17 December 2015.
  6. ^ "BP Highway construction 'complete' after 20 years". kathmandupost.ekantipur.com. Retrieved 27 November 2015.
  7. ^ Jump up to: a b "Embassy of Japan in Nepal". www.np.emb-japan.go.jp. Retrieved 16 May 2019.
  8. ^ Gorkhapatra Archived 14 March 2014 at the Wayback Machine
  9. ^ "Archived copy". Archived from the original on 24 February 2014. Retrieved 14 March 2014.{{cite web}}: CS1 maint: archived copy as title (link)
  10. ^ "THT 10 years ago: Kathmandu-Terai link road on schedule - Search Results - The Himalayan Times". www.thehimalayantimes.com. Retrieved 16 May 2019.

External links