Jakarta-Cikampek II South Toll Road
Jump to navigation
Jump to search
Route information | |
---|---|
Part of AH 2 | |
Maintained by PT Jasamarga Japek Selatan (PT Jasa Marga Tbk and PT Wira Nusantara Bumi} | |
Length | 62 km (39 mi) |
Major junctions | |
West end | Jatiasih |
East end | Sadang Interchange |
Location | |
Country | Indonesia |
Provinces | West Java |
Major cities | |
Highway system | |
Jakarta-Cikampek II South Toll Road is an under-construction toll road which connects Jakarta Outer Ring Road at Jatiasih and Purbaleunyi Toll Road at Sadang in Java, Indonesia.[1] The goal of constructing this toll road is to reduce frequent congestion in Jakarta-Cikampek Toll Road, which will also serve as an alternative route from Jakarta to Bandung and vice versa. The toll road is 62 kilometers (39 mi) long, and will have gates at Jatiasih, Bantar Gebang, Setu, Tunggilis, Sukaragam, Taman Mekar, Kutanegara, and Sadang.[2] The toll road is a complementary road for Trans-Java Toll Road, and is expected to be operational by 2024.[3]
Sections
The toll road has three sections,[4]
- Section 1: Jati Asih - Setu, 9.3 km (5.8 mi)
- Section 2: Setu - Taman Mekar, 24.85 km (15.44 mi)
- Section 3: Taman Mekar - Sadang, 27.85 km (17.31 mi)
See also
References
- ^ "Jakarta-Cikampek II Toll Road Targeted to Operate in 2020". Tempo. Retrieved 20 July 2019.
- ^ Hutauruk, Dina Mirayanti (6 January 2019). Rahmawati, Wahyu T. (ed.). "Pembebasan lahan Tol Japek II Selatan akan dikebut". Kontan (in Indonesian). Jakarta. Retrieved 20 July 2019.
- ^ Putra, Idris Rusadi (22 September 2022). "Jalan Tol Jakarta-Cikampek II Selatan Rampung 2024, Begini Jalurnya" [South Jakarta-Cikampek II Toll Road to be Completed in 2024, Here's the Route]. Merdeka.com (in Indonesian). Merdeka. Retrieved 1 October 2022.
- ^ "Konstruksi Tol Jakarta-Cikampek II Selatan Sudah Dimulai". Kompas. Retrieved 20 July 2019.