Illinois Route 255

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Illinois Route 255

Alton Bypass
IL 255 highlighted in red
Route information
Maintained by IDOT
Length23.3 mi[1] (37.5 km)
ExistedOctober 1998[2]–present
Major junctions
South end I-255 / I-270 in Pontoon Beach
North end US 67 in Godfrey
Location
CountryUnited States
StateIllinois
CountiesMadison
Highway system
I-255 IL 267

Illinois Route 255 (IL 255), also referred to as the Alton Bypass, is a northwesterly extension of Interstate 255 (I-255) in southwestern Illinois in the St. Louis metropolitan area. IL 255 starts at I-270 in Pontoon Beach and ends at U.S. Route 67 (US 67) in Godfrey, at a total length of approximately 23.3 miles (37.5 km). It was constructed in four segments opening from 1998 to 2012 at a total cost of $165.2 million.

Route description

IL 255 is a four-lane, limited-access freeway for its entire length. It serves as an important circumferential artery for the northeastern portion of the St. Louis metropolitan area. The final segment—4.3 miles (6.9 km) from Seminary Road to US 67 in Godfrey, just north of the intersection of US 67 and Montclaire Avenue (IL 267/IL 111)—was opened on November 23, 2012. The highway passes just to the west of the St. Louis Regional Airport and Southern Illinois University Edwardsville.

Although IL 255 was designed to federal Interstate Highway standards, it was built by the Illinois Department of Transportation (IDOT) using state-provided funds.

History

Described as "the Road to Prosperity" by business leaders and government officials who initially proposed it in the late 1970s, IL 255 was part of a region-wide effort to create a high-speed alternative to US 67 over the Clark Bridge through the city-center of Alton, and to two congested local routes (IL 3 and IL 111) that roughly parallel the IL 255 corridor. Although it was part of the much larger Corridor 413 plan,[3] the local politicians focused mostly on the segment from I-270 to what was then IL 267 north of the Godfrey "Y" intersection. At that time, the Berm Highway, the Beltline extension, and the Madison Avenue connector were not built and both IL 3 and IL 111 were over capacity between Alton and I-270. In 1975, a six-month detour related with the closing of the Old Clark Bridge exposed the need for the Alton Bypass along with the other three routes. However, until 1985, the Alton Bypass was a low priority,[4] as other local road projects in the area were considered more important.

The roadway was constructed in four segments opening from 1998 to 2012 at a total cost of $165.2 million. The first 6.5-mile (10.5 km) segment, from I-270 to IL 143, was completed in October 1998 at the cost of $40 million (excluding land acquisition).[5] The second segment, a 7.2-mile (11.6 km) extension from IL 143 to Fosterburg Road was constructed for $78.1 million and opened on October 20, 2006, approximately one year behind schedule, owing to the 2005 collapse of the Wisconsin-based construction company that held the contracts for that portion of the roadway.[6] The $25.1 million third segment opened on August 22, 2008 and extended the road from Fosterburg Road to Seminary Road.[7] The fourth and final segment opened on November 23, 2012 and extended the road 4.3 miles (6.9 km) from Seminary Road to US 67 in Godfrey, just north of the intersection of US 67 and Montclaire Avenue (IL 267/IL 111) at a cost of $22 million.[8][9]

Exit list

The entire route is in Madison County.

Locationmi[1]kmExitDestinationsNotes
Pontoon Beach0.000.0030 I-270 – Kansas City, Indianapolis

I-255 south – Memphis
Southern terminus; exit number based on I-255 mileage; I-270 west exit 7B, east exit 7; roadway continues as I-255
Edwardsville1.101.772Gateway Commerce Center Drive
2.984.803New Poag RoadServes Southern Illinois University Edwardsville
Roxana5.238.425Madison Avenue – South Roxana
6.5010.466 IL 143 – Edwardsville, Wood River
Wood River8.0412.948 IL 111 – Wood River, Bethalto
Bethalto10.3116.5910 IL 111 / IL 140 – Alton, BethaltoSPUI interchange
13.4921.7113Fosterburg Road
16.4126.4116Seminary Road
Godfrey19Humbert Road
20 IL 111 / IL 267 – Godfrey
23.337.5
US 67 north – Jacksonville
Northern terminus; northbound exit and southbound entrance; no access to southbound US 67 or from northbound US 67
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Pictures

References

  1. ^ a b Illinois Technology Transfer Center (2006). "T2 GIS Data". Illinois Department of Transportation. Retrieved November 8, 2007.
  2. ^ Carlson, Rich. "Routes 203 and up". Illinois Highways Page. Retrieved October 26, 2008.
  3. ^ Dees, Dan C. (November 1, 1974). "Federal-Aid Freeway System: Supplemental Freeways" (PDF). Letter to District engineers. Illinois Department of Transportation. Retrieved February 16, 2015 – via MidwestRoads.com.
  4. ^ "Alton Interstate Tie-In Revived". Alton Telegraph. February 7, 1985. p. A1.
  5. ^ Harvey, Kim (October 14, 1998). "Illinois 255: The Alton Bypass". St. Louis Highway Page. Retrieved June 2, 2006.
  6. ^ Schmidt, Sanford J. (October 21, 2006). "New Stretch of Illinois 255 Opens". The Telegraph. Alton, IL. Retrieved October 25, 2008.[permanent dead link]
  7. ^ "Alton Bypass" (PDF) (Press release). Illinois Department of Transportation. August 22, 2008. Archived from the original (PDF) on May 29, 2010. Retrieved October 25, 2008.
  8. ^ Leiser, Ken (November 23, 2012). "Final Stretch of Highway 255 Now Open". St. Louis Post-Dispatch. Retrieved November 24, 2012.
  9. ^ Hillig, Terry (July 11, 2012). "Remaining sections of Illinois 255 freeway expected to open in October". St. Louis Post Dipatch. Archived from the original on August 23, 2018. Retrieved 2018-11-26.

External links