Cibitung–Cilincing Toll Road
Cibitung-Cilincing Toll Road | |
---|---|
Route information | |
Maintained by PT Cibitung Tanjung Priok Port Tollways (CTP) | |
Length | 34 km (21 mi) |
Existed | 2021–present |
Major junctions | |
Southeast end | Cibitung |
Northwest end | Cilincing |
Location | |
Country | Indonesia |
Provinces | |
Major cities | |
Highway system | |
Cibitung-Cilincing Toll Road is a 34-kilometer-long (21 mi) toll road which extends from Cibitung, West Java, to Cilincing, Jakarta in Indonesia. This is one of the toll roads which are part of the Jakarta Outer Ring Road 2.[1] This toll road is expected to reduce the burden of freight and vehicle transportation on the Jakarta–Cikampek Toll Road that crosses the Cawang area.[2][3]
History
The toll road consists of four sections. Construction of this toll road has been delayed by eight years due to land acquisition problems. The toll road was expected to be operational by 2019.[4][5] The first section of the toll road has been operating since 31 July 2021,[6] followed by the inaugurations of sections 2 and 3 on 20 September 2022.[7]
Sections
Section |
Route |
Length |
Inauguration Date |
---|---|---|---|
Section 1 | Cibitung–Telaga Asih | 2.96 km (1.84 mi) | 31 July 2021 |
Section 2 | Telaga Asih–Tambelang | 9.41 km (5.85 mi) | 20 September 2022 |
Section 3 | Tambelang–Mekarjaya | 13.09 km (8.13 mi) | |
Section 4 | Mekarjaya–Cilincing | 8.56 km (5.32 mi) | 1 April 2023 |
Exits
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
West Java | West Cikarang, Bekasi Regency | 76 | 47 | Cimanggis–Cibitung Toll Road (Under construction) | |||
76 | 47 | 76 | Cibitung Interchange | ||||
79 | 49 | 79 | Telaga Asih Toll Gate |
| |||
North Tambun, Bekasi Regency | 89 | 55 | 89 | Gabus Toll Gate |
| Small vehicles only | |
Tarumajaya, Bekasi Regency | 103 | 64 | 103 | Tarumajaya Toll Gate |
| ||
105 | 65 | Marunda Toll Gate | |||||
DKI Jakarta | Cilincing, North Jakarta | 110 | 68 | 110 | Semper Interchange |
| |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ "Waskita Pastikan Tol Cibitung-Cilincing Beroperasi Tahun Depan". Kompas. Retrieved October 2, 2018.
- ^ "Economy in brief: Cibitung-Cilincing toll-road project to start 2016". The Jakarta Post. Retrieved October 2, 2018.
- ^ "Pelindo II to Buy 45% of Cibitung-Cilincing Toll Road". Jakarta Globe. Retrieved October 2, 2018.
- ^ "Waskita Karya Kempit 55% Saham Jalan Tol Cibitung-Cilincing". CNN Indonesia. Retrieved October 2, 2018.
- ^ "Agar Arus Logistik Lancar, Truk Butuh jalan Tol Baru". Industri.Bisnis.Com. Retrieved October 2, 2018.
- ^ "BEROPERASI & BELUM BERTARIF, SEKSI 1 TOL CIBITUNG - CILINCING RUAS CIBITUNG - TELAGA ASIH". bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 31 July 2022. Retrieved 13 October 2022.
- ^ "Tingkatkan Mobilitas Logistik, Presiden Jokowi Resmikan Jalan Tol Cibitung-Cilincing dan Tol Serpong-Balaraja Seksi 1" [Improving Logistics Mobility, President Jokowi Inaugurates Cibitung-Cilincing Toll Road and Serpong-Balaraja Toll Road Section 1]. bpjt.pu.go.id (in Indonesian). Badan Pengatur Jalan Tol. 21 September 2022. Retrieved 28 September 2022.