Cimanggis–Cibitung Toll Road

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Cimanggis-Cibitung Toll Road

Jalan Tol Cimanggis–Cibitung (Indonesian)
Cimaci Toll Road
Route information
Maintained by PT Cimanggis Cibitung Tollways (CCT)
Length26 km (16 mi)
Existed2020–present
Major junctions
Southwest endCimanggis Interchange
Major intersections
Northeast endCibitung Interchange
Location
CountryIndonesia
ProvincesWest Java
Major cities
Highway system

Cimanggis–Cibitung Toll Road is a 25.39 kilometers long toll road which extends from Cimanggis to Cibitung in West Java, Indonesia. This is one of the toll roads which are part of the Jakarta Outer Ring Road 2.[1] The toll road is expected to be able to break traffic density of two other toll roads of Greater Jakarta area, namely the Jakarta-Cikampek Toll Road and Jagorawi Toll Road.

Sections

The toll road has 4 sections:

  • Section 1 & 2 (Junction Cimanggis – Trans Yogie IC – Narogong IC), 8,75 Km.
  • Section 3 & 4 (Narogong IC – Setu – Cibitung Junction).

Construction of this toll road was stalled since 2006, then started again in 2016.[2] Section 1 of the toll road, which extends from Cimanggis to Transyogi has been operating since 2020,[3] whereas the 2nd sections of the toll road has been operated 16 April 2023 and 10 July 2024.[4]

Exits

ProvinceLocationkmmiExitNameDestinationsNotes
West JavaCimanggis, Depok49.430.7ID Rambu petunjuk 4a.svg Cinere–Jagorawi Toll Road
Tapos, Depok50.431.350Cimanggis Interchange
Jatisampurna, Bekasi52.532.652Jatikarya Toll Gate
Northeastbound exit & Southwestbound entry only
Gunung Putri, Bogor Regency56.134.956Nagrak Toll Gate
  • Nagrak
  • Kota Wisata
  • Transyogi Road
  • Cibubur
Cileungsi, Bogor Regency59.336.859Narogong Toll Gate
Setu, Bekasi RegencyBurangkeng InterchangeUnder construction as of March 2024
65.840.965Setu Selatan Toll Gate
West Cikarang, Bekasi Regency72.945.372Setu Utara Toll Gate
Cibitung Interchange
ID Rambu petunjuk 4a.svg Cibitung–Cilincing Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Route transition
  •       Unopened

See also

References

  1. ^ Hutapea, Edwin (14 July 2018). Alexander, Hilda B. (ed.). "Telan Rp 3,5 Triliun, Tol Cimanggis-Cibitung Seksi I Rampung 2019". Kompas.com (in Indonesian). Retrieved 1 October 2018.
  2. ^ "Govt takes over grappled Cimanggis-Cibitung toll road". The Jakarta Post. Retrieved October 2, 2018.
  3. ^ Daelami, Muawman (10 November 2020). "Ruas Tol Cimanggis-Cibitung Seksi 1 Resmi Beroperasi" [Cimanggis-Cibitung Section I is Officially Inaugurated]. beritasatu.com (in Indonesian). Berita Satu. Retrieved 8 August 2022.
  4. ^ Yanwardhana, Emir (3 March 2023). "Bisa Sat Set! Ini Tol-tol Baru yang Beroperasi Tahun Ini". CNBC Indonesia (in Indonesian). Jakarta. Retrieved 24 April 2023.