Tennessee State Route 365
Jump to navigation
Jump to search
Route information | ||||
---|---|---|---|---|
Maintained by TDOT | ||||
Length | 3.7 mi (6.0 km) | |||
Existed | July 1, 1983[1]–present | |||
Major junctions | ||||
South end | US 45 in Henderson | |||
SR 200 in Henderson | ||||
North end | US 45 in Henderson | |||
Location | ||||
Country | United States | |||
State | Tennessee | |||
Counties | Chester | |||
Highway system | ||||
|
State Route 365 (SR 365) is a secondary north–south state highway located in Henderson, Chester County, Tennessee.
Route description
SR 365 begins at US 45 and SR 5. It then continues east through downtown Henderson as Main Street for approximately 0.8 miles (1.3 km) and turns in front of Freed-Hardeman University[2] onto White Avenue and continues for approximately 2.5 miles (4.0 km) ending between mile markers 7 and 8 of US 45.
History
Main Street at one time was part of SR 100 until the Noah Weaver Bypass was constructed which bypassed the downtown area. White Avenue was also once known as US 45 Business.[3]
Major intersections
The entire route is in Henderson, Chester County.
mi | km | Destinations | Notes | ||
---|---|---|---|---|---|
0.0 | 0.0 | US 45 (SR 5) to SR 100 – Selmer, Bethel Springs, Jackson | Southern terminus | ||
1.3 | 2.1 | SR 200 north (Steed Street) – Lexington | Southern terminus of SR 200 | ||
3.7 | 6.0 | US 45 (SR 5) – Selmer, Bethel Springs, Jackson | Northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
- ^ "The Road To 100 Years" (PDF). Tennessee Road Builder. Vol. 17, no. 5. September 2014. p. 22. Retrieved April 6, 2019.
- ^ "About".
- ^ "1952 TORNADO in CHESTER COUNTY TENNESSEE". www.rootsweb.ancestry.com. Archived from the original on 2014-04-15.
External links
- Official Tennessee Transportation Map (PDT) (Map). Tennessee Department of Transportation. 2014.