Tennessee State Route 319
Route information | ||||
---|---|---|---|---|
Maintained by TDOT | ||||
Length | 22.2 mi (35.7 km) | |||
Existed | July 1, 1983[1]–present | |||
Major junctions | ||||
South end | SR 153 / SR 58 at Chattanooga | |||
SR 58 in Chattanooga | ||||
North end | US 27 at Soddy-Daisy | |||
Location | ||||
Country | United States | |||
State | Tennessee | |||
Counties | Hamilton | |||
Highway system | ||||
|
State Route 319 (SR 319) is a state highway in southeast Tennessee, starting at the intersection of SR 153 in Chattanooga, traveling to the area of Soddy-Daisy where it intersects with US 27, and the route comes to an end.
Route description
SR 319 begins on the northeast side of Chattanooga at SR 153 and SR 58. SR 319 has a short 1.8 mile concurrency/overlap with SR 58, to where SR 58 heads southwest and SR 319 turns north to have an interchange with Access Road and Hixson Pike after this intersection it enters Chattanooga's Hixson neighborhood. SR 319 then turns east and Junctions with SR 153 and turns north back along SR 153 and begins a very short 0.7 mile-long concurrency to an interchange where SR 153 heads northwest and SR 319 turns northeast and leaves Chattanooga/Hixson 3.7 miles from SR 153. It then enters the community of Middle Valley and then after 3.3 miles it leaves Middle Valley corporate limits and enters the city of Lakesite and in this area it turns back and forth from east to north. After it leaves Lakesite it passes the Sequoyah Nuclear Plant and turns northwest and enters Soddy-Daisy city limits to end at US 27/SR 29.
Junction list
This section contains a table that is missing mileposts for one or more junctions. |
The entire route is in Hamilton County.
Location | mi | km | Destinations | Notes | |
---|---|---|---|---|---|
Chattanooga | SR 153 / SR 58 north to I-75 – Chattanooga Metropolitan Airport, Harrison | Southern terminus; southern end of overlap with SR 58; SR 153 Exit 6 | |||
SR 58 south (Amnicola Highway) – Downtown Chattanooga | Northern end overlap with SR 58; interchange; southern end of freeway (DuPont Parkway) | ||||
Tennessee River | C.B. Robinson Bridge (DuPont Bridge) | ||||
Chattanooga | Access Road; Hixson Pike | Interchange | |||
SR 153 south to I-75 – Chattanooga Metropolitan Airport, Chickamauga Dam | Southern end of overlap with SR 153; partial interchange; northern end of freeway (DuPont Parkway) | ||||
SR 153 north – Falling Water, Soddy-Daisy | Northern end of overlap with SR 153 | ||||
Soddy-Daisy | US 27 (SR 29) – Chattanooga, Dayton | Northern terminus; interchange | |||
Dayton Pike – Soddy-Daisy | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ^ "The Road To 100 Years" (PDF). Tennessee Road Builder. Vol. 17, no. 5. September 2014. p. 22. Retrieved April 6, 2019.