Tennessee State Route 194

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

State Route 194

Map
TN 194 in red
Route information
Maintained by TDOT
Length23.5 mi (37.8 km)
ExistedJuly 1, 1983[1]–present
Major junctions
South end SR 57 in Rossville
Major intersections
North end SR 59 near Braden
Location
CountryUnited States
StateTennessee
CountiesFayette
Highway system
SR 193 SR 195

State Route 194 (SR 194) is a 23.5-mile-long (37.8 km) north–south state highway in Fayette County, Tennessee, connecting Rossville with Braden via Macon and Oakland.

Route description

SR 194 begins in Rossville at an intersection with SR 57. It heads north to pass through downtown along Church Street before leaving Rossville and crossing the Wolf River. The highway then travels northeast through farmland and rural areas as Rossville Road to pass through Macon, where it has a short concurrency with SR 193 (Macon Road). SR 194 then heads north as Oakland Road to enter Oakland, where it passes through subdivisions and downtown as Church Street to come to an intersection with U.S. Route 64 (US 64; in an unsigned concurrency with SR 15). It then passes through more subdivisions before leaving Oakland to cross the Loosahatchie River. The highway then comes to an end shortly thereafter at an intersection with SR 59, approximately halfway between Braden and Somerville. The entire route of SR 194 is a two-lane highway.[2][3]

Future

An extension of SR 194 is planned to serve Ford Motor Company's Blue Oval City manufacturing facility to the north, which will begin operation in 2025. The northern terminus will be with US 70 in Tipton County, and a new interchange on Interstate 40 will be constructed with the extension, numbered exit 39.[4]

Major intersections

The entire current route is in Fayette County.

CountyLocationmikmDestinationsNotes
FayetteRossville0.00.0
SR 57 to I-269 – Collierville, Piperton, Moscow
Southern terminus
0.8–
1.0
1.3–
1.6
Bridge over the Wolf River
Macon9.014.5
SR 193 east (Macon Road) – Williston
Southern end of SR 193 concurrency
9.415.1
SR 193 west (Macon Road) – Fisherville
Northern end of SR 193 concurrency
Oakland15.224.5 US 64 (SR 15) – Bartlett, Somerville
20.0–
20.1
32.2–
32.3
Bridge over the Loosahatchie River
23.537.8
SR 59 to I-40 – Braden, Somerville
Northern terminus
I-40Future interchange; I-40 exit 39
Tipton US 70Future northern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ "The Road To 100 Years" (PDF). Tennessee Road Builder. Vol. 17, no. 5. September 2014. p. 22. Retrieved April 6, 2019.
  2. ^ Google (September 7, 2019). "State Route 194" (Map). Google Maps. Google. Retrieved September 7, 2019.
  3. ^ Long Range Planning Division Office of Data Visualization (n.d.). Fayette County (PDF) (Map). Scale not given. Nashville: Tennessee Department of Transportation. Retrieved September 7, 2019.
  4. ^ Wooten, Rya (July 7, 2022). "TDOT set to preview I-40 extension plans for newly coming Blue Oval City Ford plant". WATN-TV. Memphis. Retrieved July 7, 2022.