A14 (Romania)

From the AARoads Wiki: Read about the road before you go
(Redirected from Suceava–Oar Motorway)
Jump to navigation Jump to search

Autostrada A14

Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length335 km (208 mi)
(estimated length)
Major junctions
From A 7 near Suceava
To M49 at Oar (border with Hungary)
Location
CountryRomania
Highway system
A 13 A 0

The Suceava–Oar Motorway (Romanian: Autostrada Suceava–Oar), also known as the North Motorway (Romanian: Autostrada Nordului),[1] labelled A14,[2] is a planned motorway in the northern part of Romania that upon completion will link Southern Bukovina to Maramureș and further to the Central and Western Europe countries. It will begin in Suceava (at the junction with the A7 motorway) and pass through Vatra Dornei, Bistrița, Dej, Baia Mare and Satu Mare, connecting with Hungary's also-planned M49 expressway near Oar.[1][3][4] It will be 335 km long.[5]

As of 2021, the segment between Satu Mare and Oar (14 km) is in the project phase.[4]

See also

References

  1. ^ a b "Autostrada Nordului a primit aprobare, iar lucrările de construcție încep de la 1 ianuarie 2021". Digi24 (in Romanian).
  2. ^ "Vești despre Autostrada Nordului. Ce a anunțat ministrul Transporturilor". timponline.ro (in Romanian).
  3. ^ "Autostrada Nordului va fi gata până în 2025. Ce orașe din România leagă". Impact (in Romanian).
  4. ^ a b "VESTE BUNĂ. Proiectul tehnic al drumului expres Varianta Ocolire Satu Mare – Oar – Ungaria avansează". Gazeta de Nord-Vest (in Romanian).
  5. ^ "DE LA PROIECT, LA LEGE – Deputatul Adrian Todoran, contribuție decisivă pentru realizarea Autostrăzii Nordului". 2mnews.ro (in Romanian).