Roads in Bosnia and Herzegovina
Roads in Bosnia and Herzegovina are the most important traffic branch in Bosnia and Herzegovina and an important part of the European road network. Roads are built, maintained and supervised by companies run by the Federation of Bosnia and Herzegovina and the Republika Srpska. The total length of roads in the country as of 2020 is 9,110 km (5,660 mi), and they are categorized as motorways (total length of 218 km (135 mi)), main (total length of 4,237 km (2,633 mi)) and regional (total length of 4,655 km (2,892 mi)).[1]
Motorways
The primary high-speed motorways are called autoceste or autoputevi/аутопутеви, public road specially built and intended exclusively for motor vehicle traffic, which is marked as a motorway with a prescribed traffic sign, has two physically separated lanes for traffic from opposite directions with at least two lanes and a lane for forced stopping of vehicles, without intersection with transverse roads and railways or tramways at the same level and in whose traffic it can be included or excluded only by a certain and specially built connecting public road to the appropriate lane of the motorway. They are marked with a special road sign, similar to the road sign depicting a motorway/autoroute/autobahn in other parts of Europe. Motorways in Bosnia and Herzegovina are defined by the Ministry of Traffic and Communications of Federation of Bosnia and Herzegovina and Ministry of Transport and Communications of Republika Srpska.[2][3]
The Bosnian-Herzegovinian motorway network is 233.4 km (145.0 mi) long as of 2022.
Motorways and sections
Motorway | Route | Length (in 2023) |
Description | Notes |
---|---|---|---|---|
A1 | Croatian border - Odžak - Doboj - Zenica - Sarajevo - Mostar - Croatian border | 127.5 km (79.2 mi) | The A1 starts on border of Croatia near Svilaj and runs south to Odžak where it ends right next to the entity border. The only part of the highway that passes through Republika Srpska starts at the Johovac junction, with a crossing towards the Banja Luka - Doboj Highway, and ends at the Rudanka junction. The motorway continues north of Zenica, which also serves as a bypass, and passes west of Sarajevo, with which the bypass is directly connected. The end of the middle part is in Bradina. South part starts at Međugorje and ends on border with Croatia near Bijača. The motorway follows the Vc corridor along the entire route.[4][5] | Several sections are under constructions or planned to connect four separate parts. |
Autoput Gradiška - Banja Luka | Gradiška - Laktaši - Banja Luka | 33.7 km (20.9 mi) | The Motorway Gradiška - Banja Luka starts on border of Croatia near Gradiška and follows a route of E661. The highway passes through the Laktaši interchange with the highway towards Doboj, after which it ends north of Banja Luka.[6] | |
Autoput Banja Luka - Doboj | Laktaši - Prnjavor - Doboj | 72.2 km (44.9 mi) | The route of Motorway Banja Luka - Doboj starts at Laktaši interchange after which goes beside Prnjavor and ends in Johovac junction connecting A1. Also known as: Motorway of January 9th.[7] |
Motorway sections under construction
Motorway | Entity | Length[8][9] | Section | Description | Scheduled completion |
---|---|---|---|---|---|
A1 | FBiH | 8.5 km (5.3 mi) | Putnikovo brdo - Medakovo | Six bridges, one cut&cover tunnel, five underpasses, one overpass, seven hydrotechnical facilities, two interchanges and a center for maintenance and traffic control on the highway.[10] | End of 2025[11] |
21.3 km (13.2 mi) | Medakovo - Ozimica | One interchange, two double-sided rest stops, eight bridges and viaducts, two overpasses, fifteen underpasses and the 2.200-kilometer long Crni vrh tunnel.[12] | February 2026[13] | ||
5.5 km (3.4 mi) | Poprikuše - Nemila | The 3.659-kilometer long Golubinja tunnel, two bridges, two viaducts, the Poprikuša interchange and the Traffic Control Center will be built.[14] The section will be open with neighboring sections.[15] | End of 2025[16] | ||
5.7 km (3.5 mi) | Nemila - Vranduk | Viaduct, underpasses under the highway, relocation of the main road M-17 in the length of 3.6 km and regulation of the riverbed of the river Bosna in the length of 3 km. The section will be open with neighboring sections.[15] | |||
5.3 km (3.3 mi) | Vranduk - Ponirak | One tunnel, two bridges, three viaducts.[17] The section will be open with neighboring sections.[15] | March 2026[18] | ||
3.5 km (2.2 mi) | Ponirak - Vraca | The 2.475-kilometer Zenica tunnel.[19] The section will be open with neighboring sections.[15] | End of 2025[16] | ||
7.2 km (4.5 mi) | Buna - Počitelj | The section is completed but it will be open with section Počitelj - Zvirovići. | Mid-2021[2] | ||
11.1 km (6.9 mi) | Počitelj - Zvirovići | One bridge.[20] | August 2024[21] | ||
RS | 5.3 km (3.3 mi) | Rudanka - Putnikovo brdo 2 | Two tunnels and one bridge.[22] | End of 2025[23] | |
Autoput Banja Luka - Novi Grad | 18.7 km (11.6 mi) | Banja Luka - Prijedor | 23 overpasses, ten underpasses, nine bridges.[24] | Spring 2026[24][25] | |
Autoput Vukosavlje - Rača |
20.0 km (12.4 mi) | Bijeljina - Rača | September 2025[26] | ||
RS Brčko |
33.0 km (20.5 mi) | Vukosavlje - Brčko | August 2025[27] |
Planned motorway sections
Motorway | Entity | Length | Section | Notes[8][9][28] |
---|---|---|---|---|
Jadransko–jonska autocesta | FBiH | 23.3 km (14.5 mi) | Počitelj - Stolac | Project in public exhibition[29] |
A2 | 30.3 km (18.8 mi) | Orašje - Brčko - Maoča | Concept project completed[30] | |
23.3 km (14.5 mi) | Maoča - Tuzla | The conceptual project is being developed[31] | ||
A3 | 55.4 km (34.4 mi) | Tuzla - Žepče | Concept project completed[30] | |
A1 | 12.8 km (8.0 mi) | Ozimica - Poprikuše | Tender procedure in progress[32] | |
10.7 km (6.6 mi) | Ivan - Ovčari | Preparatory activities for construction in progress | ||
10.1 km (6.3 mi) | Ovčari - Konjic - Prenj tunnel | Preparatory activities for construction in progress | ||
12.4 km (7.7 mi) | Prenj tunnel | Tender procedure in progress; Construction start in mid-2023[33] | ||
12.4 km (7.7 mi) | Prenj - Mostar north | Preparatory activities for construction in progress | ||
14.2 km (8.8 mi) | Mostar north - Mostar south | Tender procedure in progress; Construction start in mid-2023[33] | ||
9.2 km (5.7 mi) | Mostar south - Kvanj tunnel | Tender procedure in progress; Construction start in the first half of 2024[34] | ||
5.2 km (3.2 mi) | Kvanj tunnel - Buna | Tender procedure in progress | ||
RS | 35.2 km (21.9 mi) | Johovac - Orašje | Tender procedure in progress[35] | |
Autoput Banja Luka - Novi Grad | 23.5 km (14.6 mi) | Prijedor - Novi Grad | The preparation of the general project for the selection of the route is underway[25] | |
Autoput Banja Luka - Mliništa | 95.0 km (59.0 mi) | Banja Luka - Mlinište | There are no detailed plans, just an announcement | |
Autoput Vukosavlje - Rača | Brčko RS |
17.0 km (10.6 mi) | Brčko - Bijeljina | Construction contract signed[36] |
Expressways
Currently there is no expressways in use, but several are under construction and most of them are being designed.
List of planned expressways:[8][37][30][38]
Entity | Route | Total length | Section | Length | Note |
---|---|---|---|---|---|
FBiH | Prača - Goražde | 18.4 km (11.4 mi) | M5 - Hranjen tunnel | 2.7 km (1.7 mi) | Main project completed |
Hranjen tunnel | 5.8 km (3.6 mi) | Under construction | |||
Hranjen tunnel - Pobjeda | 5.3 km (3.3 mi) | Main project completed | |||
Pobjeda - Sopotnica | 4.6 km (2.9 mi) | Main project completed | |||
Bihać - Cazin - Velika Kladuša - border crossing (Croatia) | 45.4 km (28.2 mi) | Bihać - Ćoralići | 18.0 km (11.2 mi) | The tender procedure for the preparation of the main Project is underway | |
Ćoralići - border crossing | 27.4 km (17.0 mi) | The conceptual project is being developed | |||
Izačić - Bihać - Ključ | 106.4 km (66.1 mi) | Izačić - Gorjevac | TBD | The conceptual project has been completed | |
Gorjevac - Bravsko | |||||
Bravsko - Ključ | |||||
Mostar north - Široki Brijeg - border crossing (Croatia) | 60.7 km (37.7 mi) | Mostar north - Vihovići | 11.6 km (7.2 mi) | The conceptual project is being developed | |
Vihovići - Polog | 8.7 km (5.4 mi) | ||||
Polog - Polugno | 15.8 km (9.8 mi) | Main project completed and the expropriation procedure is in progress.[39] | |||
Polugno - border crossing | 24.6 km (15.3 mi) | ||||
Lašva - Travnik - Jajce | 67.2 km (41.8 mi) | Lašva - Kaonik | 5.83 km (3.62 mi) | The main project needs to be revised | |
Kaonik - Selište | 4.4 km (2.7 mi) | ||||
Selište - interchange Vitez | 3.78 km (2.35 mi) | ||||
interchange Vitez - exit from business zone Vitez | 5.0 km (3.1 mi) | The conceptual project is being developed | |||
exit from business zone Vitez - Nević Polje | 4.8 km (3.0 mi) | Under construction | |||
Nević Polje - Turbe | 10.8 km (6.7 mi) | The development of the main project is underway | |||
Turbe - Jajce | 30.6 km (19.0 mi) | The conceptual project is being developed | |||
Sarajevo bypass | 1.44 km (0.89 mi) | Lot 3B | 1.44 km (0.89 mi) | Construction suspended[40] | |
Turbe - Bugojno - Kupres - Livno - border crossing (Croatia) | 135.0 km (83.9 mi) | ||||
Doboj - Šićki Brod | 45.0 km (28.0 mi) | In 2024, it is planned to produce study project documentation up to the conceptual design level. | |||
Šićki Brod - Kalesija | 35.0 km (21.7 mi) | A tender for conceptual solutions has been announced[41] | |||
RS | Prijedor - Kozarska Dubica | — | |||
Kotor Varoš - Čelinac - Banja Luka | |||||
Sarajevo - Sokolac - Višegrad | |||||
Stolac - Ljubinje - Trebinje - border crossing (Montenegro) | |||||
Bijeljina - Zvornik - Foča - Trebinje |
See also
References
- ^ "3. Cestovni saobraćaj" [3 Road traffic] (PDF). Saobraćaj 2021 (in Bosnian). Sarajevo: Agencija za statistiku Bosne i Hercegovina. 61: 21. 2022. ISSN 1840-104X.
- ^ a b "Zakon o cestama Federacije Bosne i Hercegovine" [Law on Roads of the Federation of Bosnia and Herzegovina] (PDF). Advokat Prnjavorac (in Bosnian and Croatian). Retrieved 24 April 2022.
- ^ "Zakon o javnim putevima" [Law on Public Roads] (PDF). Advokat Prnjavorac (in Serbian). 3 October 2013. Retrieved 24 April 2022.
- ^ "Autocesta A1" [Motorway A1]. JP Autoceste FBiH (in Bosnian). Retrieved 26 April 2022.
- ^ "Кoridor Vc u Republici Srpskoj" [Corridor Vc in Republic of Srpska]. Autoputevi RS (in Serbian). Retrieved 31 August 2022.
- ^ "Gradiška - Banja Luka" [Gradiška - Banja Luka]. Autoputevi RS (in Serbian). Retrieved 26 April 2022.
- ^ "Autoput "9. januar", Banja Luka - Doboj" [Motorway "January 9th", Banja Luka - Doboj]. Autoputevi RS (in Serbian). Retrieved 26 April 2022.
- ^ a b c "Plan gradnje" [Construction plan]. JP Autoceste FBiH (in Bosnian). Retrieved 7 February 2023.
- ^ a b "Projekti" [Projects]. Autoputevi RS (in Serbian). Retrieved 26 April 2022.
- ^ "BiH za dvije godine dobija novih 23 kilometara autoputa na Koridoru 5C" [Bosnia and Herzegovina will get a new 23 kilometers of highway on Corridor 5C in two years]. Klix.ba (in Bosnian). 11 November 2022. Retrieved 11 November 2022.
- ^ "Konačno je: Kreće izgradnja autoputa kroz Tešanj, radove izvodi bh. gigant" [It's finally here: The construction of the highway through Tešanj is underway, the work is being carried out by the BiH giant]. Biznis Info (in Bosnian). 12 December 2022. Retrieved 12 December 2022.
- ^ "Pogledajte kako će izgledati dionica Medakovo – Ozimice" [See how the section Medakovo - Ozimice will look like]. JP Autoceste FBiH (in Bosnian). 17 April 2023. Retrieved 29 October 2023.
- ^ "Pripremni radovi na dionici Medakovo - Ozimice na Koridoru 5c" [Preparatory works on the section Medakovo - Ozimice on Corridor 5c]. BHRT (in Bosnian). 27 August 2023. Retrieved 29 October 2023.
- ^ "Pogledajte kako će izgledati: Počinje izgradnja dionice Poprikuše - Nemila" [See what it will look like: Construction of the Poprikuša - Nemila section is starting]. Faktor (in Bosnian). 14 November 2020. Retrieved 26 April 2022.
- ^ a b c d "U toku asfaltiranje najdužeg tunela u BiH na trasi autoputa kod Zenice" [Asphalting of the longest tunnel in BiH on the highway route near Zenica is underway]. klix (in Bosnian). 6 June 2023. Retrieved 6 June 2023.
- ^ a b "Završetak autoceste od Zenice do Žepča očekuje se krajem 2025. godine" [The completion of the highway from Zenica to Žepče is expected at the end of 2025]. JP Autoceste FBiH (in Bosnian). 21 July 2023. Retrieved 23 July 2023.
- ^ "Mostovi, tunel i tri vijadukta: Počela priprema za gradnju dionice Vranduk - Ponirak" [Bridges, tunnel and three viaducts: Preparations for the construction of the Vranduk - Ponirak section have begun]. Faktor (in Bosnian). 30 September 2019. Retrieved 26 April 2022.
- ^ "Mašine ponovo na terenu: Nastavlja se graditi dionica autoputa Vranduk - Ponirak" [Machines on the ground again: Construction of the section of the Vranduk - Ponirak highway continues]. klix.ba (in Bosnian). 8 March 2024. Retrieved 8 March 2024.
- ^ "Kreće izgradnja još jedne dionice Koridora 5C" [The construction of another section of Corridor 5C is underway]. Biznisinfo (in Bosnian). 31 July 2019. Retrieved 26 April 2022.
- ^ "Završetak radova na poddionici Počitelj - Zvirovići se očekuje sljedeće godine" [Completion of works on the subsection Počitelj - Zvirovići is expected next year]. ljubuski.info (in Croatian). 5 April 2021. Retrieved 26 April 2022.
- ^ Jazvić, Dejan (26 May 2024). "Katić: Inicirat ćemo promjenu zakona jer se proces javnih nabavki zloupotrebljava i usporava cestogradnju" [Katić: We will initiate a change in the law because the public procurement process is being abused and is slowing down road construction]. Fena (in Croatian). Retrieved 26 May 2024.
- ^ "Puštanje u saobraćaj trase Rudanka-Tovira sredinom 2022. - Uskoro tender za izgradnju treće dionice Koridora 5C kroz RS" [Commissioning of the Rudanka-Tovira route in mid-2022 - Tender for the construction of the third section of Corridor 5C through RS soon]. eKapija (in Bosnian). 31 January 2022. Retrieved 26 April 2022.
- ^ Šajinović, Dejan (8 May 2024). "Dobojska obilaznica na koridoru 5c biće gotova krajem 2025" [The Doboj bypass on corridor 5c will be completed at the end of 2025.]. Nezavisne novine (in Serbian). Retrieved 8 May 2024.
- ^ a b "Uvezivanje ekonomije i privlačenje investitora: Šta nam donosi budući autoput Banja Luka-Prijedor?" [Connecting the economy and attracting investors: What does the future Banja Luka-Prijedor highway bring us?]. ATV (in Serbian). 22 December 2021. Retrieved 26 April 2022.
- ^ a b "Čubrilović: Po planu teče izgradnja auto-puta Banjaluka-Prijedor" [Čubrilović: Construction of the Banjaluka-Prijedor highway is proceeding according to plan]. ATV (in Serbian). 18 October 2023. Retrieved 19 October 2023.
- ^ "Počela gradnja dionice auto-puta Rača-Bijeljina" [Construction of the Rača-Bijeljina highway section has begun]. RTRS (in Serbian). 15 September 2022. Retrieved 15 September 2022.
- ^ "Spajanje Banjaluke i Beograda - počela izgradnja auto-puta Vukosavlje - Brčko" [Connecting Banja Luka and Belgrade - the construction of the Vukosavlje - Brčko highway has begun]. RTRS (in Serbian). 31 August 2022. Retrieved 31 August 2022.
- ^ "Izgradnja Jadransko Jonske autoceste - dionica Počitelj - Stolac stavljena na javni uvid" [The construction of the Adriatic Ionian Highway - section Počitelj - Stolac was put up for public inspection]. akta (in Bosnian). 3 February 2023. Retrieved 3 February 2023.
- ^ "Izgradnja Jadransko Jonske autoceste – dionica Počitelj – Stolac stavljena na javni uvid" [The construction of the Adriatic Ionian Highway - Počitelj - Stolac section was put up for public exhibition]. Čapljinski portal (in Croatian). 10 February 2023. Retrieved 21 March 2023.
- ^ a b c "Aktivnosti na projektovanju i izgradnji autocesta izvan koridora 5C i brzih cesta u FBiH" [Activities on the design and construction of highways outside corridor 5C and expressways in FBiH] (PDF). JP Autoceste FBiH (in Bosnian). 3 March 2024. Retrieved 3 March 2024.
- ^ "U toku izrada glavnog projekta za autocestu od Tuzle do Orašja, najavljena eksproprijacija zemljišta" [While the main project for the highway from Tuzla to Orašje is being developed, land expropriation has been announced]. klix (in Bosnian). 21 March 2024. Retrieved 21 March 2024.
- ^ "Raspisan tender vrijedan 300 miliona eura za posljednju dionicu Koridora Vc" [A tender worth EUR 300 million has been announced for the last section of Corridor Vc]. akta (in Bosnian). 12 April 2023. Retrieved 12 April 2023.
- ^ a b Kukić, A. (27 February 2023). "Iz "Autocesta FBiH" za "Avaz": Počinje izgradnja novih 75 kilometara autoputa" [From "Autocesta FBiH" to "Avaz": The construction of a new 75 kilometer highway begins]. Dnevni Avaz (in Bosnian). Retrieved 27 February 2023.
- ^ Medić Bošnjak, Marija (28 October 2023). "Trenutačno se gradi 61, do kraja godine FBiH će dobiti još 21 km autoceste" [Currently, 61 km of highway are being built, by the end of the year FBiH will get another 21 km of highway]. Večernji list (in Croatian). Retrieved 29 October 2023.
- ^ "Koridor 5C u punom zamahu i u Republici Srpskoj, za autoput do Odžaka trebat će četiri godine" [Corridor 5C in full swing and in the Republic of Srpska, the highway to Odžak will take four years]. klix (in Bosnian). 14 May 2023. Retrieved 14 May 2023.
- ^ "Potpisan ugovor za auto-put Brčko-Bijeljina" [Signed contract for Brčko-Bijeljina highway]. Info Bijeljina (in Serbian). 23 February 2023. Retrieved 27 March 2023.
- ^ "Izvještaj o realizaciji projekta: Izgradnja brzih cesta i autocesta izvan koridora Vc u Federaciji BiH zaključno sa 30.09.2023 godine" [Report on the implementation of the project: Construction of expressways and highways outside the Vc corridor in the Federation of BiH, to date September 30, 2023] (PDF). JP Autoceste FBiH (in Bosnian). Sarajevo. October 2023. Retrieved 23 January 2024.
- ^ "Karta autoputeva, magistralnih i regionalnih puteva Republike Srpske" [Map of motorways, highways and regional roads of the Republic of Srpska] (PDF). Autoputevi RS (in Serbian). Retrieved 26 April 2022.
- ^ "Sprema se gradnja ceste koja će promijeniti saobraćajnu sliku juga BiH" [The construction of a road is being prepared, which will change the traffic picture of the south of BiH]. biznisinfo (in Bosnian). 14 March 2024. Retrieved 14 March 2024.
- ^ "Izgradnja Sarajevske zaobilaznice kroz Vlakovo stala je prije 3 godine, evo kada bi trebala biti završena" [The construction of the Sarajevo bypass through Vlakovo stopped 3 years ago, this is when it should be completed]. klix (in Bosnian). 7 June 2024. Retrieved 7 June 2024.
- ^ "Traži se firma koja će raditi idejno rješenje brze ceste Šićki Brod – Dubrave – Kalesija" [We are looking for a company that will design the expressway Šićki Brod - Dubrave - Kalesija]. akta.ba (in Bosnian). 8 March 2024. Retrieved 8 March 2024.