North-Western Chord
Jump to navigation
Jump to search
You can help expand this article with text translated from North-Western Chord in Russian. (October 2023) Click [show] for important translation instructions.
|
North-Western Chord | |
---|---|
Route information | |
Length | 30 km (19 mi) |
Location | |
Country | Russia |
Highway system | |
The North-Western Chord is an arterial road in Moscow which is a part of Moscow Chord Ring. Its length is about 30 km.[1] It was fully opened on 29 November 2019, along with the opening of the New Karamyshevsky Bridge.[2]
Gallery
The New Karamyshevsky Bridge was the last unfinished section of the North-Western Chord and was opened in 2019.
Moscow's first double-deck tunnel was opened in 2016 as part of the built section of the North-Western Chord.[3]
An interchange of Krasnopresnensky Prospekt and the North-Western Chord (passes through a tunnel).
See also
References
- ^ "Когда поедет Северо-Западная хорда". moslenta.ru (in Russian). Retrieved 11 May 2020.
- ^ "Сергей Собянин открыл балочный мост через канал имени Москвы". Vechernyaya Moskva. Retrieved 11 May 2020.
- ^ "Moscow's first double-decker tunnel opens to traffic". Mos.ru. 14 September 2016. Retrieved 14 May 2020.