Nairobi Northern Bypass Highway
Nairobi Northern Bypass Highway | |
---|---|
Route information | |
Length | 13 mi (21 km) |
History | Designated in 2009 Completion in 2014 |
Major junctions | |
Southwest end | Ruaka |
Runda Thindigua Mirema Kahawa | |
Northeast end | Ruiru |
Location | |
Country | Kenya |
Highway system | |
Nairobi Northern Bypass Highway is a road in Kenya, the largest economy in the East African Community. It connects the neighbourhood of Ruaka to the neighborhood of Ruiru, both in Kiambu County.[1]
Location
This road starts in the Ruaka neighbourhood, approximately 16 kilometers (10 mi), north-west of the central business district of Nairobi, the capital and largest city of Kenya.[2] From Ruaka, the road travels in a general easterly direction through Runda. It briefly crosses into Kiambu County, passes above Kiambu Road, re-enters Nairobi County and continues to Marurui in Kasarani. At Marurui, the road takes a north-easterly direction, crosses Kamiti Road, then passes through Kahawa West and the Kenyatta University Hospital and re-enters Kiambu County at the Kamiti River bridge near Membley Estate and Kiwanja (Nairobi County) neighbourhoods. It ends at the intersection with the Nairobi Eastern Bypass Highway in Ruiru OJ neighbourhood.[3] The highway measures approximately 21 kilometers (13 mi), from end to end.[4]
Overview
This road is one of the four bypass highways built to direct motorized traffic away from the central business district of the city of Nairobi, to alleviate the perennial traffic jams on the city streets. The bypass highways include (a) Nairobi Western Bypass Highway (b) Nairobi Eastern Bypass Highway (c) Nairobi Southern Bypass Highway and (d) Nairobi Northern Bypass Highway. It is one of these four bypass roads that form a 96.7 kilometers (60 mi) ring-road around the city.[5]
Construction
The highway was constructed between 2009,[6] and 2014,[7] as a two-lane, single carriageway road. The work was performed by China Road and Bridge Corporation. Work on this road together with the 32 kilometers (20 mi) Nairobi Eastern Bypass Highway, was budgeted at KSh8.5 billion (US$85 million). The funding for both these roads was as illustrated in the table below.[1]
Rank | Name of Development Partner | Funding in US$ | Percentage | Notes |
---|---|---|---|---|
1 | Exim Bank of China | 72.25 |
85.0 | Loan |
2 | Government of Kenya | 12.75 |
15.0 | Equity |
Total | 85.0 |
100.0 | Total length 33 miles (53 km) |
Expansion
In 2018, the Kenyan government contracted Sinohydro Limited to convert the Nairobi Northern Bypass Highway to a four-lane dual carriageway with culverts, drainage channels and walkways on both sides. It is estimated that dualling the Northern and Eastern Bypass Highways will cost anywhere from KSh30 billion to KSh40 billion (US$300 million to US$400 million).[8] The process is on-going, as of March 2019.[9]
See also
References
- ^ a b Muhoro, Maina (18 August 2010). "Northern Bypass Nairobi". Nairobi: Constructionkenya.com. Retrieved 6 March 2019.
- ^ Globefeed.com (6 March 2019). "Distance between Central Nairobi, Kenya and Ruaka, Kenya". Globefeed.com. Retrieved 6 March 2019.
- ^ Google (6 March 2019). "Location of Nairobi Northern Bypass Highway" (Map). Google Maps. Google. Retrieved 6 March 2019.
- ^ Globefeed.com (6 March 2019). "Distance between Equity Bank Ruaka, Kenya and Ruiru Progressive Primary School, C63, Ruiru, Kenya". Globefeed.com. Retrieved 6 March 2019.
- ^ Patrick Lang'at (17 September 2018). "New road project to decongest Nairobi City". Daily Nation. Nairobi. Retrieved 5 March 2019.
- ^ Daily Nation News (8 February 2009). "Bypass construction starts without approval from environmental body". Daily Nation. Nairobi. Retrieved 6 March 2019.
- ^ Obwocha, Beatrice (13 December 2015). "New bypasses jerk up road crashes". Daily Nation. Nairobi. Retrieved 6 March 2019.
- ^ Peter Mwangi (31 January 2018). "Chinese firm wins Nairobi's Northern Bypass dualling tender". Nairobi: Constructionkenya.com. Retrieved 6 March 2019.
- ^ Constant Munda (4 November 2018). "NLC starts process to buy land for city road dualling". Business Daily Africa. Nairobi. Retrieved 6 March 2019.
External links
- Why you will soon be paying on the spot to use major roads As of 16 June 2018.