Mombasa–Nairobi Expressway
Mombasa–Nairobi Expressway | |
---|---|
Route information | |
Length | 326 mi (525 km) |
History | Designated in 2019 Expected completion in 2026 |
Major junctions | |
West end | Nairobi |
Voi | |
East end | Mombasa |
Location | |
Country | Kenya |
Highway system | |
The Mombasa–Nairobi Expressway or Nairobi–Mombasa Expressway, also known as the Nairobi–Mombasa Highway, is a proposed four-lane toll highway in Kenya. The highway will link Nairobi, the capital and largest city of Kenya to Mombasa, the largest seaport of the country. The new highway is expected to cut travel times between the two cities from the current 6 to 10 hours to approximately four hours.[1][2]
Location
The road starts at Gitaru along the Nairobi–Nakuru Highway, approximately 20 kilometers (12 mi), northwest of Nairobi City centre.[3] It continues in a general southeasterly direction, through Ngong, Ongata Rongai, Kisaju and Isinya to rejoin the existing Nairobi–Mombasa Road, just north of Konza. The highway passes through nine Kenya counties to end in the city of Mombasa at the Changamwe Roundabout, a total distance of about 525 kilometers (326 mi).[4] The coordinates of this road at Kibwezi are: 02°25'04.0"S, 37°57'39.0"E (Latitude:-2.417778; Longitude:37.960833).[5]
Overview
The planned expressway is a dual-carriage motorway with initially four lanes, expandable to six lanes in the future. The road will be capable of supporting sustained traffic speeds of up to 120 kilometers (75 mi) per hour and will have controlled access.[2]
The expressway is intended to serve as "a central part of the national and regional transport system, helping promote trade and development in Kenya" and the regional neighbors of Uganda, Rwanda and the Democratic Republic of the Congo,[2] Burundi and South Sudan.[6]
The expressway is expected to improve roadway safety between the two cities. It is also expected to reduce logistics costs along the Mombasa-Nairobi transportation corridor. The construction phase is expected to create an estimated 500 construction jobs.[7]
History
In February 2015, the Kenyan government hired PwC to conduct a feasibility study on the commercial and technical viability of the Nairobi–Mombasa Expressway. The PwC report indicated the highway was viable if the highway operator collected a toll that would be used to retire the private capital used to develop the expressway.[2][6] Starting about that time as well, the government of Kenya, through the Kenya National Highways Authority (KeNHA), began detailed talks with Bechtel International on a public-private partnership (PPP) to design, fund, construct and operate the highway.[8][9]
Construction costs
The cost of constructing this expressway is budgeted at US$2.1 billion.[8] Part of the funding is expected from the Export–Import Bank of the United States and the US-based Overseas Private Investment Corporation.[10]
Timetable
In August 2017, KeNHA signed a binding agreement with Betchel International, an American civil engineering and construction company to design, construct, and operate the proposed expressway.[2] The expressway will be developed in 10 sections and is designed to have 19 interchanges. Construction was expected to start in July 2018.[11] Completion of the first section was expected in October 2019, and the entire expressway was expected to open in 2024.[2] In April 2019, the Business Daily newspaper reported that construction was expected to start in the second half of calendar year 2019.[2]
Developments
In May 2024, president William Ruto, while on a state visit to the United States, witnessed the signing of an agreement between Kenya National Highways Authority (KeNHA) and Everstrong Capital the "United States infrastructure investment manager", to build this 440 kilometers (273 mi) expressway at a budgeted price of US$3.6 billion. Funding is expected to be sourced from "pension funds, international investors, development agencies and Kenyan private investors".[12]
See also
References
- ^ Marete, Gitonga (14 August 2017). "Mombasa-Nairobi expressway to be complete within six years". Business Daily Africa. Nairobi. Retrieved 10 August 2017.
- ^ a b c d e f g Amadala, Victor (9 August 2017). "Nairobi-Mombasa expressway work starts in January – KeNHA". The Star. Nairobi. Retrieved 10 September 2017.
- ^ Google (24 May 2024). "Distance Between Central Nairobi, Kenya and Gitaru, Kiambu County, Kenya" (Map). Google Maps. Google. Retrieved 24 May 2024.
- ^ Edwin Okoth. "Sh300 Billion Mombasa Mega Highway To Bypass Nairobi". Business Daily Africa. Nairobi, Kenya. Retrieved 5 April 2019.
- ^ Google (5 April 2019). "The Nairobi–Mombasa Expressway at Kibwezi, Kenya" (Map). Google Maps. Google. Retrieved 5 April 2019.
- ^ a b Njoroge, Kiarie (22 September 2016). "State invites bids for expansion of Nairobi-Mombasa highway". Daily Nation. Nairobi. Retrieved 10 September 2017.
- ^ Roadtraffic Technology (January 2021). "Nairobi-Mombasa Highway Expansion Project". London, United Kingdom: Roadtraffic-Technology.com. Retrieved 15 February 2021.
- ^ a b Muchira, Njiraini (7 September 2017). "Kenya sets the stage for expressway". The EastAfrican. Nairobi. Retrieved 10 September 2017.
- ^ Munda, Constant (4 July 2018). "Kenya, US firm to hold talks on Sh300 billion road". Business Daily Africa. Nairobi. Retrieved 5 July 2018.
- ^ Macharia, Ken (7 August 2017). "Construction of Nairobi-Mombasa high-speed express way to start in 2018". Nairobi: 98.4 Capital FM. Retrieved 10 September 2017.
- ^ Neville Otuki (20 March 2018). "US company lobbies Kenya for Sh300 billion road contract". Business Daily Africa. Nairobi, Kenya. Retrieved 20 March 2018.
- ^ "Kenya, US investment manager sign $3.6bn highway deal" (The EastAfrican Quoting Reuters). The EastAfrican. Nairobi, Kenya. 23 May 2024. Retrieved 24 May 2024.
Further reading
- Dahir, Abdi Latif (November 8, 2020). "A Famed Fig Tree's Days Are Numbered as a New Highway Plows Through". The New York Times. ISSN 0362-4331.