Kitgum–Kidepo Road
Kitgum–Kidepo Road | |
---|---|
Route information | |
Length | 72 mi (116 km) |
History | Designated in 2024 Completion in 2028 (Expected) |
Major junctions | |
West end | Kitgum |
Karenga | |
East end | Kidepo |
Location | |
Country | Uganda |
Highway system | |
Kitgum–Kidepo Road is a road in the Northern Region of Uganda, connecting the town of Kitgum in Kitgum District and the town of Apoka, in Kaabong District, inside Kidepo Valley National Park.[1]
Location
The Kitgum–Kidepo Road starts at Kitgum and continues in a general northeasterly direction, through Naam Okoro, Orom, Lobarangit and Karenga, before ending at the western edge of Kidepo Valley National Park, a total distance of approximately 116 kilometers (72 mi).[1][2]
Overview
Before 2024, the Kitgum–Kidepo Road was a marram-surfaced, two-lane road. It is a major route of transportation between central Northern Uganda and the Karamoja sub-region. It is a major surface transport corridor for tourists transferring between Murchison Falls National Park and Kidepo Valley National Park. It is very dusty during the dry season and very muddy during the rainy season.[3]
Upgrade to class II bitumen standard
In 2024, the government of Uganda requested parliamentary approval to borrow USh450 billion (€110.54 million or US$121 million) to upgrade this road to class II bitumen standard, with culverts, shoulders and drainage channels. The loan request was approved on 30 April 2024.[1]
The Environment and Social Impact Assessment (ESIA) and the Resettlement Action Plan (RAP), were carried out by Environmental Solutions Africa (ESA) working together with Tenvicon. The Engineering, procurement and construction (EPC) contract was awarded to a joint venture between ASGC Limited of the United Kingdom and Dott Services Limited of Uganda.[4]
Related considerations
Besides improving Uganda's tourism sector, this road is intended to support Uganda's mineral development, now that gold, marble, limestone, uranium, graphite and other minerals have been discovered in the Karamoja sub-region.[5]
Long range plans include the construction of Kidepo International Airport, which will provide increased connectivity to the region and provide employment opportunities to the local and national residents.[5][6]
See also
References
- ^ a b c Apollo Mubiru (1 May 2024). "Parliament Approves Sh450 Billion Loan For Kitgum-Kidepo Road". New Vision. Kampala, Uganda. Retrieved 18 May 2024.
- ^ Google (18 May 2024). "Road Distance Between Kitgum And Kidepo Valley National Park" (Map). Google Maps. Google. Retrieved 18 May 2024.
- ^ Mzee Asingwire (19 April 2024). "Uganda Seeks $117 Million Loan For Kitgum-Kidepo Road To Boost Northern Tourism". Pulse Uganda. Kampala, Uganda. Retrieved 18 May 2024.
- ^ Tenvicon (2023). "ESIA and RAP for Upgrading Kitgum-Kidepo Road (115.8km)". Tenvicon.com. Najjera, Kira Town Council, Uganda. Retrieved 18 May 2024.
- ^ a b BTU (2 May 2024). "Kitgum-Kidepo Road, -Kidepo Airport To Boost Trade Tourism In Karamoja". Business Times Uganda (BTU). Kampala, Uganda. Retrieved 18 May 2024.
- ^ New Vision (8 November 2023). "Museveni Okays Construction Of First Airport In Kidepo Valley National Park". New Vision. Kampala, Uganda. Retrieved 19 May 2024.