Kisumu–Chemelil–Muhoroni Road

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Kisumu–Chemelil–Muhoroni Road

Route information
Length31 mi (50 km)
HistoryDesignated in 2020
Completed in 2024 (Anticipated)
Major junctions
West endKisumu
Major intersectionsMiwani
Kibigori
Chemelil
East endMuhoroni
Location
CountryKenya
Highway system

The Kisumu–Chemelil–Muhoroni Road, is a road in Kenya, that links the city of Kisumu, to the towns of Miwani, Kibigori, Chemelil, all in Kisumu County, to the town of Muhoroni, also in Kisumu County. The road is sometimes referred to as the Nyanza Sugar Belt Road.[1]

Location

The road starts at the neighborhood within Kisumu, known as Mamboleo, along the Kisumu–Kakamega–Webuye–Kitale Road. From there, this road travels eastwards, through Miwani, Kibigori, Chemelil, to end in Muhoroni, approximately 50 kilometers (31 mi), from Mamboleo.[2] For the most part, the road is within Kisumu County. Between the towns of Miwani and Kibigori, the road forms the border between Kisumu County to the south and Nandi County to the north. It travels through Nandi County for a short distance, between Kibigori and Chemelil.[3]

Overview

This road was constructed in the 1960s, by the government of Kenya. Due to neglect, over the past two decades, the road deteriorated, developing potholes and gulleys. Public service vehicles abandoned the dilapidated road and instead used the 63 kilometers (39 mi) Kisumu–Ahero–Awasi–Muhoroni Road, that is better maintained.[4]

The road is of economic importance to Kenya, because along this road lie at least three large sugar plantations and factories. Miwani Sugar Factory,[5] Chemelil Sugar Factory and Muhoroni Sugar Company, all lie along this road.[1] When upgraded, the road will ease the transportation of raw cane to the factories and of crystalline sugar to markets. The road is designated as a Class C road, (named C4 on map),[3] and is under the jurisdiction of Kenya National Highway Authority (KeNHA).[1][4]

Upgrading and widening

In 2020, the Government of Kenya, through its parastatal KeNHA allocated funds for the rehabilitation of this road. Tendering was done in March 2020.[1]

In August 2020, the government allocated KES:4.9 billion (approximately US$45.6 million) towards the resurfacing of this road to class II bitumen standard. Other improvements include widening the road to 11 meters (36 ft), with shoulders, culverts, drainage channels, passing lanes, bus stops and access roads in urban centers. In some sections the road will be widened to dual carriage.[6][7]

Note: US$1.00 = KSh107.43 on 17 September 2020

See also

References

  1. ^ a b c d Edwin Okoth (8 March 2020). "Nyanza sugar belt road to be rehabilitated after two decades of neglect". Daily Nation. Nairobi. Retrieved 16 September 2020.
  2. ^ Dominic Mandela (13 March 2020). "Kenya to rehabilitate Muhoroni-Miwani–Kisumu road". Nairobi: Construction Review Online. Retrieved 16 September 2020.
  3. ^ a b Google (16 September 2020). "Location of Kisumu–Chemelil–Muhoroni Road" (Map). Google Maps. Google. Retrieved 16 September 2020.
  4. ^ a b Edwin Okoth (16 September 2020). "Construction of 63km sugar belt road to start October". Business Daily Africa. Nairobi. Retrieved 17 September 2020.
  5. ^ Business Daily Africa (20 September 2016). "Miwani: The abandoned giant miller that pioneered Kenya's sugar industry". The EastAfrican. Nairobi. {{cite web}}: |author= has generic name (help)
  6. ^ Faith Matete (9 August 2020). "State approves Sh4.9bn to build Mamboleo-Muhoroni road". The Star (Kenya). Nairobi. Retrieved 17 September 2020.
  7. ^ Washington Onyango (9 August 2020). "Hope for Nyanza Sugar belt as Treasury approves Sh4.9b 63-kilometer Mamboleo-Muhoroni road". The Standard (Kenya). Nairobi. Retrieved 17 September 2020.