Kakira–Kisumu Expressway
Kakira–Kisumu Expressway | |
---|---|
Route information | |
Length | 163 mi (262 km) |
History | Designated in 2026 (Expected) Completion in 2030 (Expected) |
Major junctions | |
West end | Kakira |
Busitema Malaba Kisian | |
East end | Kisumu |
Location | |
Highway system |
The Kakira–Kisumu Expressway, also Kenya–Uganda Highway, is a road in Uganda and Kenya, connecting the cities of Kakira and Iganga in Uganda to Busia, Malaba and Kisumu in Kenya.[1]
Location
The road starts at Kakira, Uganda and makes its way eastwards through Iganga, Bugiri and Busitema. At Busitema the road takes a right turn and travels southeastwards through Busia and enters Kenya. The road then continues southeast through Matayos and Kisian to end in Kisumu.[2] The road distance between Kakira, Uganda and Kisumu, Kenya is approximately 221 kilometers (137 mi).[3]
A second leg of this road branches off at Busitema and continues eastwards to the Kenyan border at Malaba, a distance of about 42 kilometers (26 mi).[4] The total distance within Uganda is approximately 143 kilometers (89 mi), while that in Kenya is about 120 kilometers (75 mi), for a total road distance of about 263 kilometers (163 mi).[1][2]
Upgrade to double carriageway
As a preliminary to the rehabilitation and expansion of this single carriageway road to class II bitumen and widening to double carriageway, feasibility studies funded by the African Development Bank are underway.[1][2][5]
The contract for the feasibility studies was awarded to GOPA Infra Gmbh of Germany and ITEC Limited of Kenya, at a contract price of US$1,499,587.00. The studies are expected to last 18 months starting in May 2024.[1][2][5]
The entire length of the road will be improved to class II bitumen standard, with culverts and drainage channels. The section of this road between Busia, Kenya and Kisian, Kenya measuring 104 kilometers (65 mi) will be expanded to dual carriageway (two lanes in each direction). The road improvement project is being undertaken by the East African Community, as part of decongesting the Northern Corridor.[1][2][5] The work includes the improvement of the Malaba and Busia "One Stop Border Point"s (OSBP)s and the conversion of Lwakhakha to an OSBP.[6][7][8]
See also
- List of roads in Kenya
- List of roads in Uganda
- Kapchorwa–Suam Road
- Suam–Endebess–Kitale–Eldoret Road
- East African Community
References
- ^ a b c d e EAC (24 April 2024). "EAC Multinational Road of Kenya/Uganda: Kisumu - Busia/Kakira - Malaba Expressway set to boost intra-regional trade in the Northern Corridor". East African Community (EAC). Arusha, Tanzania. Retrieved 6 May 2024.
- ^ a b c d e The Independent Uganda (25 April 2024). "EAC Shifts Focus On Uganda-Kenya Expressway". The Independent (Uganda). Kampala, Uganda. Retrieved 6 May 2024.
- ^ Google (6 May 2024). "Road Distance Between Kakira, Uganda And Kisumu, Kenya" (Map). Google Maps. Google. Retrieved 6 May 2024.
- ^ Google (6 May 2024). "Road Distance Between Busitema, Uganda And Malaba, Kenya" (Map). Google Maps. Google. Retrieved 6 May 2024.
- ^ a b c UgaGovInfra (29 April 2024). "The Kisumu-Jinja Expressway to Increase Commerce". Uganda Government Infrastructure (UgaGovInfra). Kampala, Uganda. Retrieved 6 May 2024.
- ^ Apollo Mubiru (29 April 2024). "EAC Road: Kisumu-Jinja Expressway To Boost Trade". New Vision. Kampala, Uganda. Retrieved 6 May 2024.
- ^ Luke Amani (28 July 2024). "Kenya, Uganda eye Lwakhakha border post upgrade". The East African. Nairobi, Kenya. Retrieved 29 July 2024.
- ^ Simon Peter Owaka (19 July 2024). "EAC Embarks on the Upgrade of the Lwakhakha Border to One-Stop Border Post to Decongest the Busia and Malaba Border Posts". East African Community. Arusha, Tanzania. Retrieved 29 July 2024.
External links
- Kisumu-Uganda expressway feasibility assessment kicks off As At 30 April 2024.
- Northern Corridor Advances Toward Dual Carriageway with $1.4M As At 29 April 2024.