Great St. Bernard Tunnel

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search
Great St Bernard Tunnel
Tunnel St. Bernard Italy - Kopie.JPG
Italian side of the tunnel
Overview
LocationItaly/Switzerland
StatusOpen
Route E 27/ T 2/ H21
CrossesGreat St Bernard Pass
StartItaly Saint-Rhémy-en-Bosses, Aosta Valley
EndSwitzerland Bourg-Saint-Pierre, Valais
Operation
Work begun1958
Opened19 March 1964
OperatorSISEX S.A.
TrafficAutomotive
TollSee list
Technical
Length5,798 m (6,341 yd)
No. of lanes2 (one per direction)
Operating speed80km/h (50mph)
Highest elevation1,918 m (6,293 ft)
Lowest elevation1,875 m (6,152 ft)
Location

The Great St Bernard Tunnel (French: Tunnel du Grand Saint-Bernard, Italian: Traforo del Gran San Bernardo, German: Grosser-Sankt-Bernhard-Tunnel) is a road tunnel complementing the Great St Bernard Pass, linking Martigny (in the Swiss canton of Valais) with Saint-Rhémy-en-Bosses (in the Aosta Valley, in north western Italy).

Description

There is a toll to use the tunnel, payable in full even for drivers who already display on their vehicles a Swiss motorway vignette. The tunnel comprises a section of the E27 route linking Belfort with Aosta.

For most of its 5,798-meter (6,341 yd) length the tunnel runs in a straight line, but incorporating a gentle slope. The northern end is 1,918 m (6,293 ft) above sea level while the southern end is only 1,875 m (6,152 ft) above sea level. At both ends, the approach road to the tunnel is covered by a gallery / avalanche shelter in order to minimize the risk of access to the tunnel being temporarily blocked during bad weather. Any frontier formalities are handled at the tunnel's north end, although the actual national frontier is around 4,100 m (4,500 yd) from the Swiss tunnel entrance and 1,700 m (1,900 yd) from the Italian entrance. Note that the Swiss manage 2,938 m (3,213 yd) of tunnel, while Italians 2,860 m (3,130 yd), so the border between the two operating entities does not lie at the state border, but around one kilometre on the Swiss side.

The name of the tunnel comes directly from that of the Grand St Bernard Pass, and thereby indirectly from the saint who in AD 1049 founded the hospice high above the tunnel, that also bears his name. Tourists on the Swiss side additionally find themselves reminded by road side billboards of the saint's association with St Bernard dogs.

The Rhône Pipeline has carried oil through the tunnel since 1966.

Toll charges

As of 1 August 2020[1]
Vehicle class One way Return[a] 10 crossings[b] 20 crossings[c]
A1[d] €16.50
CHF 17.50
€22.10
CHF 23.50
€112
CHF 118.50
€150
CHF 159
A2[e] €27.80
CHF 29.50
€44.60
CHF 47.30
B1[f] €43.40
CHF 46
€69.30
CHF 73.50
€260.50
CHF 276
€346
CHF 367
B2[g] €75.50
CHF 80
€122
CHF 129.50
€563
CHF 597
€981
CHF 1,040
B3[h]
3A[i] €110
CHF 116.50
€176
CHF 186.50
€825
CHF 874
€1,424
CHF 1,510
3B[j]
4[k] €167
CHF 177
€266
CHF 282
€1,257
CHF 1,333
€2,153
CHF 2,282

History

Before the tunnel was constructed, the frontier was passable here only using the Great St Bernard Pass, which took its name from the Great St Bernard Hospice, a monastery, and ultimately from the monastery's founder Bernard of Menthon.

The pass remains an option in summer, but is normally closed by snow between October and May, and sometimes for longer. The tunnel, on the other hand, is intended to be usable uninterruptedly for 365 days throughout the year.

Construction of the tunnel began in 1958 and it was opened to traffic on 19 March 1964, when it was the longest road tunnel in the world, surpassing the Vielha tunnel in the Pyrenees in Spain which was opened in 1948.

The approach roads have been progressively improved, and most recently the avalanche covers have been extended on the southern side. The Mont Blanc tunnel tragedy of 1999 prompted a major review of road tunnel safety in several countries including Switzerland, and significant safety upgrades are planned for the Grand St Bernard Tunnel. A speed limit of 80 km/h (50 mph) is already in force inside the tunnel.

Access and popularity

The tunnel and most of the connecting road between Aosta and Martigny are only single carriageway roads, and for most relevant city destinations in Switzerland and Italy the toll free St Gotthard Tunnel and Simplon Pass offer more direct or at least faster routes. This and the toll ensure that the Grand San Bernard Tunnel rarely suffers from the levels of holiday season congestion that plague the more popular Alpine crossing routes.

Notes

  1. ^ Within 30 days
  2. ^ Two years validity
  3. ^ Two years validity
  4. ^ Motorcycle, motorcycle with sidecar, motorcycle with trailer
  5. ^ Vehicles with 2 or more axles, height measured from front axle of less than 1.3m and total height not exceeding 2m
  6. ^ Vehicles with 2 or more axles, total height exceeding 2m and equal to/less than 3m
  7. ^ 2-axle goods vehicle with total height exceeding 3m
  8. ^ 2-axle passenger vehicle with total height exceeding 3m
  9. ^ 3-axle goods vehicle with total height exceeding 3m
  10. ^ 3-axle passenger vehicle with total height exceeding 3m
  11. ^ Vehicles with 4 or more axles and total height exceeding 3m

References

  1. ^ "TOLLS AND SPECIAL OFFERS". www.letunnel.com. SISEX SA. Archived from the original on 30 May 2022. Retrieved 4 November 2020.

External links