Durg–Raipur–Arang Expressway

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Durg–Raipur–Arang Expressway is a planned 92 km (57 mi) long, six-lane, access-controlled greenfield expressway in the state of Chhattisgarh, India. The expressway is a part of Bharatmala Pariyojana, and will pass from Durg through Anjora, Patora, Supkona, Abhanpur and Naya Raipur before terminating at Arang.[1][2]

Durg-Raipur-Arang Expressway

Durg–Raipur–Arang Expressway in red
Route information
Length92 km (57 mi)
Major junctions
FromTendesara, Rajnandgaon
ToMahanadi Bridge, Arang
Location
CountryIndia
Highway system

Status updates

  • Aug 2020: The target date for completion of proposed expressway is set as March 2024.[3]
  • Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 km[citation needed]

See also

References

  1. ^ "दुर्ग-रायपुर एक्सप्रेस कॉरिडोर, मुआवजे के इंतजार में बैठे तीन जिले के 2330 किसानों के लिए राहत की खबर". Patrika News.
  2. ^ "इस नए एक्सप्रेस-वे से मात्र 20 मिनट में तय होगी दुर्ग से रायपुर की दूरी, 26 गांवों से गुजरेगी विकास की रफ्तार". Patrika News.
  3. ^ "23 new expressways and highways coming up in next 5 years | India News–Times of India". The Times of India.