D126 (Croatia)

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

D 126

Route information
Length8.3 km (5.2 mi)
Major junctions
FromDržavna cesta D315.svg D315 in Trogir
ToSlatine
Location
CountryCroatia
CountiesSplit-Dalmatia
Highway system
Trogir, at the northern terminus of the D126 road, the Čiovo Bridge is visible
Slatine, at the southern terminus of the D126 road

D315 is a state road branching off from D409 state road connecting it to Trogir. The road is 8.3 km (5.2 mi) long.[1]

In Trogir, the road crosses from the mainland to Čiovo Island via a movable bridge. A new movable bridge is planned to be completed outside the city centre, and at such time, the D126 route is expected to be relocated as well.[2][3][4] The construction appears to be delayed though.

The road, as well as all other state roads in Croatia, is managed and maintained by Hrvatske ceste, a state-owned company.[5]

Road junctions

D126 junctions
Type Slip roads/Notes
Sinnbild Innerorts.svg Trogir
Državna cesta D315.svg D315 to Pantana and Split and to Ž6133 and Ž6134 county roads to D8 state road.
Ž6134 to Okrug Gornji.
The northern terminus of the road.
Sinnbild Innerorts.svg Mastrinka
Sinnbild Autokreuzung.svg Ž6135 to Žedno.
Sinnbild Innerorts.svg Arbanija
Sinnbild Innerorts.svg Slatine
The southern terminus of the road.

Sources

  1. ^ "Decision on categorization of public roads as state roads, county roads and local roads". Narodne novine (in Croatian). February 17, 2010.
  2. ^ Marko Biočina (18 February 2008). "Novi most Trogir - Čiovo" [New Trogir-Čiovo Bridge]. Nacional (in Croatian). Archived from the original on 6 April 2012. Retrieved 22 July 2012.
  3. ^ "Trogir-Čiovo Bridge construction starts in 2009". Slobodna Dalmacija (in Croatian). November 11, 2008.
  4. ^ "Čiovo Bridge construction starts in a year". Jutarnji list (in Croatian). June 26, 2008. Archived from the original on 2012-10-11.
  5. ^ "Public Roads Act". Narodne novine (in Croatian). December 14, 2004.