Cengkareng–Batu Ceper–Kunciran Toll Road
Cengkareng-Batu Ceper-Kunciran Toll Road | |
---|---|
Route information | |
Maintained by PT Jasamarga Kunciran Cengkareng (JKC) | |
Length | 14.19 km (8.82 mi) |
Existed | 1 April 2021–present |
Major junctions | |
North end | Benda Interchange |
South end | Kunciran Interchange |
Location | |
Country | Indonesia |
Provinces | Banten |
Major cities | Tangerang |
Highway system | |
Cengkareng-Batu Ceper-Kunciran Toll Road is a toll road, which runs from Cengkareng to Kunciran in Greater Jakarta, Indonesia. This toll road is part of the Jakarta Outer Ring Road 2 network that will connect Soekarno-Hatta International Airport to Cilincing. The toll road will be connected to the Jakarta-Tangerang Toll Road, Kunciran-Serpong Toll Road, as well as Prof. Dr. Ir. Soedijatmo Toll Road.[1][2]
History
Cengkareng-Batu Ceper-Kunciran is 14.19 kilometers long, consisting of 4 work sections.[3][4] The four sections are, section 1 Kunciran – IC of Sultan Ageng Tirtayasa for 2.04 km, section 2 IC of Sultan Ageng Tirtayasa – on / off ramp of Benteng Betawi along 3.50 km. Then section 3 is the on / off ramp of Benteng Betawi – IC Husein Sastranegara along 6.50 km, and section 4 IC Husein Sastranegara – Benda Junction along 2.15 km. The toll road was expected to be operational by 2019.[5] The toll road was inaugurated in 1 April 2021 along with the first section of Serpong–Cinere Toll Road.[6]
Toll gates
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Banten | Benda, Tangerang | 0.0 | 0.0 | 0 | Benda Interchange | Northern terminus | |
2.1 | 1.3 | 2 | Benda Ramp |
| North-bound exit & South-bound entry only | ||
2.2 | 1.4 | Benda Utama Toll Gate | |||||
Tangerang, Tangerang | 7.6 | 4.7 | 7 | Tanah Tinggi Toll Gate | South-bound exit & North-bound entry only | ||
9.5 | 5.9 | 9 | Buaran Indah Toll Gate | South-bound entry & North-bound exit only | |||
Pinang, Tangerang | 11.8 | 7.3 | 11 | Pinang Toll Gate |
| ||
13.4 | 8.3 | 13 | Kunciran Interchange | Southern terminus | |||
14.6 | 9.1 | Kunciran–Serpong Toll Road | |||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ^ "Pembangunan JORR 2 Terus Bergerak". Kompas. Retrieved 29 September 2018.
- ^ "Proyek Tol Kunciran-Bandara Soetta Ditargetkan Selesai Pertengahan 2018". Kompas. Retrieved 29 September 2018.
- ^ "Jalan Tol Baru Bakal Ditambah di Jabodetabek, Ini Perkembangannya".
- ^ "Tol Akses Bandara: Pemerintah Percepat Evaluasi Usulan Penambahan Ruas". Archived from the original on 2018-09-28. Retrieved 2018-09-28.
- ^ "Tol Cengkareng-Kunciran Bakal Beroperasi pada 2019". Liputan 6. Retrieved 29 September 2018.
- ^ "DIRESMIKAN PRESIDEN JOKOWI, 2 RUAS TOL JORR 2 JALAN TOL CENGKARENG - BATUCEPER - KUNCIRAN DAN TOL SERPONG CINERE SEKSI I" [Inaugurated by President Jokowi, 2 toll roads Cengkareng-Batuceper-Kunciran and Serpong-Cinere section 1] (in Indonesian). Badan Pengatur Jalan Tol. 1 April 2021. Retrieved 3 November 2022.