T3 road (Tanzania)
Lua error in Module:Infobox_road/route at line 107: bad argument #1 to 'wikitext' (string or number expected, got boolean). | ||||
---|---|---|---|---|
Route information | ||||
Maintained by TANROADS | ||||
Major junctions | ||||
East end | Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Morogoro | |||
Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Dodoma Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Manyoni Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Mkiwa Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Singida Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Singida Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Nzega Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Nyakanazi Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). & Lua error in Module:Jct at line 204: attempt to concatenate local 'link' (a boolean value). in Kasulo | ||||
West end | NR4 at the Rwandan border at Rusumo | |||
Location | ||||
Country | Tanzania | |||
Regions | Morogoro, Dodoma, Singida, Tabora, Shinyanga, Geita, Kagera | |||
Major cities | Morogoro, Dodoma, Manyoni, Singida, Nzega, Kahama | |||
Highway system | ||||
|
The T3 is a Trunk road in Tanzania. The road runs from the center of Morogoro where the Trunk Road T1 and T3 intersect all the way to Rwandan border at Rusumo. The road is the longest trunk road in the Tanzanian road system and it is approximately 1,097 km (682 mi). The road is a major road connecting the coast to the Tanzanian Capital Dodoma along with Rwanda. The road is entirely paved.[1] The trunk road forms the only major land link to East African Community member Rwanda.[2]
Route
Morogoro
Between 1959 and 2022, the Wami bridge was a single lane bridge between the towns of Wami and Dakawa. In 2022 the New Wami Bridge was opened after the Tanzanian government spent TZS 75 Billion to upgrade the bridge and increase safety.[3]
Tabora
Between the 42 km (26 mi) streach from Nzega to Tinde, the T3 trunk road shares its designation with T8 trunk road.
Kagera
Between the 15 km (9.3 mi) streach from Nyakanazi to Lusahunga, the T3 trunk road shares its designation with the T9 trunk road.
See also
References
- ^ "TANROADS Trunk and Regional Road Map" (PDF). TANROADS. November 2021. Retrieved October 16, 2023.
- ^ topschoolsintheusa. "Tanzania Road Network – Top Schools in the USA". Retrieved 2023-10-17.
- ^ "Tanzania to build new Wami Bridge at US $30m". buildmartafrica.COM. Retrieved 2023-10-17.