M35 (Hungary)
You can help expand this article with text translated from M35 (Hungary) in Hungarian. Click [show] for important translation instructions.
|
M35-ös autópálya (Hungarian) | |
Part of Via Carpathia | |
Route information | |
Part of E 79 / E 573 | |
Length | 68.8 km (42.8 mi) |
Existed | 2003–present |
History | Completed: 2018 |
Major junctions | |
From | M3 near Görbeháza |
To | M4 near Berettyóújfalu |
Location | |
Country | Hungary |
Counties | Hajdú-Bihar |
Major cities | Hajdúböszörmény, Debrecen, Berettyóújfalu |
Highway system | |
|
The M35 motorway (Hungarian: M35-ös autópálya) is a 68.8 km (42.8 mi) motorway in eastern Hungary which connects the M3 motorway with the city of Debrecen, providing it with a direct motorway link to the capital, Budapest.
The section bypassing Debrecen was completed in April 2006, and the whole stretch of road was opened to the public on 15 December 2006. The new road reduced driving time between Debrecen and the capital to under 2 hours. The further stretch from Debrecen to M4 motorway was inaugurated on December 20, 2018.[1]
Timeline
Section | Length | Opened | Notes |
---|---|---|---|
Görbeháza (M3) – Debrecen dél | 44.0 km (27.34 mi) | 15 December 2006 | Built between 2003 – 2006, with Debrecen western bypass. |
Debrecen dél – Mikepércs | 5.43 km (3.37 mi) | 13 December 2017 | Built between 2015 – 2017. |
Mikepércs – Berettyóújfalu (M4) | 18.7 km (11.62 mi) | 20 December 2018 | Built between 2015 – 2018. |
Route description
- The route is full length motorway. The maximum speed limit is 130km/h, with (2x2 lane road with stop lane).
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. |
County | km | Type | Destination | Notes | |
---|---|---|---|---|---|
Hajdú-Bihar |
0 | M3 / E 79 – Budapest, Miskolc (M30)
M3 / E 579 – Nyíregyháza |
The northern terminus of the motorway, E79 route, and Via Carpathia.
Kilometrage starting point | ||
7 | Pródi pihenőhely | parking, and WC
pihenőhely means Rest area | |||
12 | Eastern Main Channel híd | híd means Bridge | |||
14 | Hajdúnánás / Balmazújváros | ||||
19 | Böszörményi pihenőhely | parking, and WC | |||
24 | Hajdúböszörmény / Balmazújváros | Connection to the highway engineers | |||
31 | Józsai pihenőhely | parking, petrol station (Mobil Petrol), café and restaurant | |||
33 | BMW factory, Gate 1. and 6. / Debrecen-Józsa | exit under construction | |||
38 | BMW factory, Gate 2. / 354 / E 573 – Debrecen észak, towards to Main road 4 → Nyíregyháza |
Northern end of concurrency with european route E573, and Debrecen bypass.
észak means North | |||
Main road 33 – Debrecen Centrum / Hortobágy | Centrum means center | ||||
40 | Debrecen nyugat, Debrecen-Ondód, Ipari park | nyugat means West
Ipari park means Industrial area | |||
44 | Main road 4 – Debrecen dél 4 / E 573 – Hajdúszoboszló, Szolnok |
Southern end of concurrency with european route E573.
dél means South | |||
49 | Main road 481 – Mikepércs, Industrial area | Southern end of Debrecen bypass.
Connection to Debrecen International Airport | |||
53 | Mikepércsi pihenőhely | parking, and WC | |||
60 | Derecske / Hajdúszovát | ||||
63 | Derecskei pihenőhely | parking, and WC (petrol station in the future) | |||
68 | M4 / E 60 – Budapest, Szolnok
|
The southern terminus of the motorway, E79 route, and Via Carpathia.
Incomplete junction: junction only from/to → Nagykereki (Romanian border) | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Maintenance
The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer.
- near Hajdúböszörmény, kilometre trench 22
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica);
- Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.[2]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette Available section Hajdú-Bihar full length (0 km – 68 km)
European Route(s)
Name | Route | |
68 km | junction (0) – junction (68) | |
17 km | Debrecen-dél (44) – Debrecen-észak (37) |
See also
References
External links
- Exit list of M35
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- National Infrastructure Developer Ltd.