M2 (Hungary)

From the AARoads Wiki: Read about the road before you go
(Redirected from M2 expressway (Hungary))
Jump to navigation Jump to search

M2

Map key - blue in use Map key - green planned Map key - grey other highways
M2 autópálya.jpg
M2 near Budapest
Route information
Part of E 77
Length30 km (19 mi)
71 km (44 mi) planned
Existed1996–present
HistoryExpansion: 2017–19
Major junctions
From M0 near Budapest
Major intersections
  • 12 near Vác
  • 22 near Rétság (planned)
ToParassapuszta (Hont) (planned)
R3 border with  Slovakia
Location
CountryHungary
CountiesPest, Nógrád
Major citiesBudapest, Dunakeszi, Vác
Highway system
  • Roads in Hungary

The M2 expressway (Hungarian: M2-es autóút) is a toll highway in northern Hungary, connecting Budapest to Vác and Banská Bystrica. The first section of the highway opened in 1996. It follows the route of the old Route 2 one-lane highway. The total length of the motorway now is 30 km.

Timeline

Section Length Opened Notes
Budapest (M0) – Vác észak 30.0 km (18.64 mi) Single carriageway: 1998
Second carriageway: 1 October 2019
Built between 1996 – 1998.
Originally the name of the route was 2A, and 2B.
Both carriageways were fully built between 2017 – 2019 until Vác dél junction.
Vác észak – Hont-Parassapuszta (border) 41 km (25.48 mi) Planned

Route description

  • The route is expressway. The maximum speed limit is 110km/h, with 2 active lanes no emergency.svg (2x2 lane road) until Vác dél junction.

Maintenance

The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by this highway engineer.

Payment

Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica)1, time-based fee vignettes (E-matrica);

  • Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024.[1]

2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:

Type of county vignette Available section
Pest full length (17 km – 48 km)

European Route(s)

Name Route
E77-HUN.svg 71 km Slovakia Rýchlostná cesta R3.svg Rýchlostná cesta R3M0 (Hu) Otszogletu kek tabla.svg junction AB-Kreuz-blau.svg (16)

See also

References

  1. ^ "National Toll Payment Services PLC - E-vignette rates from 1 January 2024". toll-charge.hu.

External links