Schuylkill Expressway
Route information | ||||
---|---|---|---|---|
Maintained by PennDOT and DRPA | ||||
Length | 25.2 mi[1] (40.6 km) | |||
Existed | 1951–present | |||
Component highways |
| |||
NHS | Entire route | |||
Major junctions | ||||
West end | I-76 Toll / I-276 Toll / Penna Turnpike in King of Prussia | |||
| ||||
East end | I-76 on the Walt Whitman Bridge at the New Jersey state line in Philadelphia | |||
Location | ||||
Country | United States | |||
State | Pennsylvania | |||
Counties | Montgomery, Philadelphia | |||
Highway system | ||||
|
The Schuylkill Expressway /ˈskuːkəl/,[2] locally known as "the Schuylkill", is a freeway through southern Montgomery County and the city of Philadelphia. It is the easternmost segment of Interstate 76 (I-76) in the U.S. state of Pennsylvania. It extends from the Valley Forge interchange of the Pennsylvania Turnpike in King of Prussia, paralleling its namesake Schuylkill River for most of the route, southeast to the Walt Whitman Bridge over the Delaware River in South Philadelphia. It serves as the primary corridor into Philadelphia from points west. Maintenance and planning for most of the highway are administered through Pennsylvania Department of Transportation (PennDOT) District 6, with the Delaware River Port Authority (DRPA) maintaining the approach to the Walt Whitman Bridge.
Constructed over a period of 10 years from 1949 to 1959, a large portion of the expressway predates the 1956 introduction of Interstate Highway System; many of these portions were not built to contemporary standards.[3] The rugged terrain, limited riverfront space covered by the route and narrow spans of bridges passing over the highway have largely stymied later attempts to upgrade or widen the highway. With the road being highly over capacity, it has become notorious for its chronic congestion.[4] An average of 163,000 vehicles use the road daily in Philadelphia County,[5] and an average of 109,000 use the highway in Montgomery County,[6] making it the busiest road in Pennsylvania.[7] Its narrow lane and left shoulder configuration, left lane entrances and exits (nicknamed "merge or die"), common construction activity, and generally congested conditions have led to many accidents, critical injuries, and fatalities, leading to the highway's humorous nickname of the "Surekill Expressway" or, in further embellishment, the "Surekill Distressway" or the “Surekill Crawlway".[8][9]
Route description
Montgomery County
The Schuylkill Expressway begins at the Valley Forge interchange of the Pennsylvania Turnpike in the community of King of Prussia in Upper Merion Township, Montgomery County. The I-76 designation continues west on the Pennsylvania Turnpike from this point, while the Pennsylvania Turnpike from this point east is designated I-276. The road heads southeast from the trumpet interchange as a nine-lane freeway carrying four westbound lanes and five eastbound lanes that is designated as part of I-76, passing through the Valley Forge Interchange toll plaza. Past the toll plaza, the Schuylkill Expressway narrows to four lanes, with two lanes in each direction, and comes to an eastbound exit and entrance with North Gulph Road, providing access to Valley Forge National Historical Park and the Village at Valley Forge residential and retail development, the latter of which contains the King of Prussia Town Center lifestyle center, and a westbound exit and entrance with Mall Boulevard, providing access to the King of Prussia shopping mall to the northeast of the road. There is also a westbound entrance from Pulaski Drive just east of the toll plaza. The freeway passes businesses and comes to an interchange with U.S. Route 202 (US 202), the eastern terminus of US 422, and Swedesford Road that serves King of Prussia. A westbound collector–distributor road carrying two lanes provides access to the US 202/US 422/Swedesford Road and Mall Boulevard interchanges. I-76 passes under Chester Valley Trail and Norfolk Southern's Dale Secondary railroad line and continues east-southeast as a six-lane road between residential areas to the southwest and commercial areas to the northeast, eventually narrowing to four lanes. The freeway heads east and comes to a westbound exit and entrance with South Gulph and South Henderson roads. The Schuylkill Expressway curves southeast near wooded areas of homes before coming to an interchange with Pennsylvania Route 320 (PA 320) in the community of Gulph Mills. This interchange has an eastbound exit and entrance and a westbound exit. Within this interchange, the highway passes over SEPTA's Norristown High Speed Line and crosses Gulph Creek. Past the PA 320 interchange, I-76 continues east-southeast through woodland near residential development, heading into Lower Merion Township. The freeway enters the borough of West Conshohocken and comes to an interchange with I-476 that also has ramps providing access to PA 23 and serving the boroughs of West Conshohocken and Conshohocken.[10][11]
Past the I-476 interchange, the Schuylkill Expressway heads east and comes to a westbound exit and eastbound entrance providing access to PA 23 and Conshohocken, passing near residential and commercial development. The freeway passes over PA 23 and leaves West Conshohocken for Lower Merion Township, where it heads through wooded areas and runs on top of a cliff, with Norfolk Southern's Harrisburg Line and the Schuylkill River parallel to the north below the cliff and another cliff rising above the highway to the south.[10][11] East of Conshohocken at about milemarker 331, it curves sharply southeast in a 90-degree turn locally known as the "Conshohocken Curve" or "Conshy Curve", which has a history of traffic congestion and dangerous conditions.[12][13][14][15] I-76 continues southeast through wooded areas, with the railroad tracks and the river parallel to the northeast. Farther southeast, the Schuylkill Expressway crosses Mill Creek and comes to a westbound exit and eastbound entrance with Hollow Road that provides access to the community of Gladwyne. The freeway passes over the Flat Rock Tunnel carrying Norfolk Southern's Harrisburg Line and continues to the southeast with the Schuylkill River to the northeast and the railroad tracks to the southwest. I-76 comes to a diamond interchange with Belmont Avenue and Green Lane, with Belmont Avenue heading south through the community of Bala Cynwyd in Lower Merion Township, and Green Lane crossing the river into the neighborhood of Manayunk in the city of Philadelphia. Following this interchange, the freeway passes under the Manayunk Bridge that carries an extension of the Cynwyd Heritage Trail across the Schuylkill River. The Schuylkill Expressway passes over Norfolk Southern's Harrisburg Line and runs southeast between the West Laurel Hill Cemetery to the southwest and an industrial area to the northeast that is sandwiched between the railroad tracks and the river. I-76 comes to an interchange with City Avenue on the border of Lower Merion Township and the city of Philadelphia in Philadelphia County; City Avenue heads southwest as US 1 and northeast across the Schuylkill River on the City Avenue Bridges to an interchange with Ridge Avenue, Lincoln Drive, and Kelly Drive.[10][11]
Philadelphia County
Past the City Avenue interchange, I-76 enters the city of Philadelphia and becomes concurrent with US 1, with the Schuylkill Expressway widening to eight lanes and running between the West Falls Yard on Norfolk Southern's Harrisburg Line and the river to the north and wooded areas of Fairmount Park to the south. US 1 splits from I-76 by heading northeast on the Roosevelt Expressway, while I-76 continues south on the Schuylkill Expressway, heading through Fairmount Park and running parallel to CSX's Trenton Subdivision railroad line, Martin Luther King Jr. Drive, the Schuylkill River Trail, and the Schuylkill River to the east. The freeway curves to the southwest, with CSX's Trenton Subdivision heading east away from the road and CSX's Harrisburg Subdivision railroad line beginning to run parallel. I-76 comes to a diamond interchange with Montgomery Drive that provides access to Fairmount Park and serves the Mann Center for the Performing Arts. Following this, the Schuylkill Expressway narrows to six lanes and turns to the southeast, running through more of the park with the railroad tracks, Martin Luther King Jr. Drive, the Schuylkill River Trail, and the Schuylkill River parallel to the northeast. The freeway passes under CSX's Harrisburg Subdivision and comes to an interchange with US 13 and US 30 at Girard Avenue. Within this interchange, the highway passes under the Pennsylvania Railroad, Connecting Railway Bridge that carries Amtrak's Northeast Corridor railroad line across the Schuylkill River before heading under the Girard Avenue Bridge that carries US 13 (Girard Avenue) across the river. US 30 becomes concurrent with I-76 on the Schuylkill Expressway at this point and the road heads south, with the Philadelphia Zoo to the west and Martin Luther King Jr. Drive, the Schuylkill River Trail, and the Schuylkill River still parallel to the east. The freeway turns southeast and runs between Amtrak's Northeast Corridor to the southwest and the river drive, trail, and river to the northeast, with Boathouse Row on the opposite bank of the river. The Schuylkill Expressway comes to an eastbound exit and westbound entrance with Spring Garden Street, which heads east across the Schuylkill River toward the Philadelphia Museum of Art. The freeway continues south, heading east of Amtrak's Penn Coach Yard, and comes to an interchange with the western terminus of I-676, which heads east along with US 30 on the Vine Street Expressway into Center City.[10][16]
Following this, I-76 narrows to four lanes and heads south between the Amtrak yard to the west and the Schuylkill River to the east. The road comes to an interchange with Market Street (PA 3) and 30th Street that provides access to 30th Street Station that serves Amtrak, SEPTA Regional Rail, and NJ Transit's Atlantic City Line along with the Cira Centre and University City. At this point, the Schuylkill Expressway dips below street level and runs in a tunnel sandwiched between 30th Street Station and the city's former main Post Office facility to the west and the river to the east, with Schuylkill Avenue running at street level above the tunnel and intersecting John F. Kennedy Boulevard (PA 3 west), Market Street (PA 3 east), Chestnut Street, and Walnut Street. Past the interchange, the freeway returns to ground level and runs southwest between Amtrak's Northeast Corridor to the northwest and the Schuylkill River to the southeast, coming to an interchange with South Street that has left exits and entrances. I-76 continues southwest alongside the river, with athletic fields belonging to the University of Pennsylvania to the northwest of the road. The Schuylkill Expressway passes under the Schuylkill Arsenal Railroad Bridge that carries CSX's Harrisburg Subdivision across the river before coming to an eastbound exit and westbound entrance providing access to University Avenue.[10][16]
Following this, the freeway passes over the Schuylkill River on the Schuylkill Expressway Bridge and heads into South Philadelphia. The highway passes over CSX's Philadelphia Subdivision railroad line and heads south-southwest near urban residential and commercial areas, reaching a westbound exit and eastbound entrance with 34th Street just south of Wharton Street that provides access to Grays Ferry Avenue. I-76 widens to six lanes and continues south near urban development, curving southeast and running between the former Philadelphia Energy Solutions oil refinery and Philadelphia Gas Works to the southwest and urban neighborhoods to the northeast and reaching an eastbound interchange for 28th Street and a westbound interchange with Vare Avenue and Mifflin Street. The Schuylkill Expressway comes to an interchange with Passyunk and Oregon avenues that also has an eastbound exit and westbound entrance to 26th Street that provides access to PA 291 and Philadelphia International Airport. At this point, I-76 narrows to four lanes and turns south, with a CSX railroad branch parallel to the west and CSX's Harrisburg Subdivision parallel to the east. This marks the point heading eastbound where the DRPA maintains the road. The freeway makes a sharp turn to the east and passes under the Harrisburg Subdivision, heading near commercial areas and coming to a westbound exit and eastbound entrance with the eastern terminus of PA 291 at Penrose Avenue, providing access to Philadelphia International Airport. The Schuylkill Expressway continues east near urban residential neighborhoods and reaches an interchange with PA 611 (Broad Street). From here, I-76 widens to six lanes and passes north of the South Philadelphia Sports Complex and Live! Casino & Hotel Philadelphia, coming to an interchange with 7th Street and Packer Avenue that has an eastbound exit and entrance and a westbound exit. A short distance later, the freeway comes to a westbound exit and eastbound entrance providing access to I-95 and Front Street. Immediately after, the road has a westbound toll plaza for the Walt Whitman Bridge. The freeway heads onto the seven-lane Walt Whitman Bridge, which carries it over Front Street, I-95, Conrail Shared Assets Operations' Swanson Street Industrial Track, industrial areas in the Port of Philadelphia, Christopher Columbus Boulevard, the Philadelphia Belt Line Railroad, and finally the Delaware River. At this point, the Schuylkill Expressway ends and I-76 continues into New Jersey.[10][16]
History
Planning and construction
Plans for a limited-access highway along the west bank of the Schuylkill River originated in 1932, as part of a proposed cars-only parkway system for the Philadelphia area similar to the contemporary system being built in New York City. The Valley Forge Parkway was to have run from Fairmount Park to Valley Forge State Park (now Valley Forge National Historical Park) with plans for a later extension to Reading via Pottstown. However, planning for the proposed parkway system stalled and the plan was eventually abandoned.[17]
Planning for today's expressway began in 1947, when the city of Philadelphia approved plans to develop a highway connecting the city with the terminus of the planned Philadelphia Extension of the Pennsylvania Turnpike near Valley Forge.[18] The highway was designed by engineers Michael Rapuano, who had previously aided in the design of the Garden State Parkway, and Bill Allen of Gannett Fleming.[19] The new expressway largely followed the earlier planned parkway route from Valley Forge to Fairmount Park, while also extending into southern Philadelphia and across the Delaware River into New Jersey. Two alternatives were proposed south of University City: one routing would continue along the west bank of the river into Southwest Philadelphia to its confluence near Philadelphia International Airport, where it would tunnel underneath the Delaware to Paulsboro, New Jersey; the other would cross the Schuylkill south of University City and bisect South Philadelphia, crossing the Delaware River into Gloucester City, New Jersey. Planned expansions of the airport in the path of the former proposal led to adoption of the routing through South Philadelphia.[18]
Construction of the road began in 1949. Plans called for the Schuylkill Expressway to run between City Line Avenue and University Avenue in Philadelphia. Extensions from the Schuylkill Expressway would connect to Roosevelt Boulevard in Northeast Philadelphia and Vine Street in Center City Philadelphia. The Valley Forge Expressway was planned to link the Schuylkill Expressway at City Line Avenue to the Philadelphia Extension of the Pennsylvania Turnpike in King of Prussia. At University Avenue, the Schuylkill Expressway would connect to a highway running along 34th Street and Vare Avenue to South Philadelphia. The expressway, which would be between four and six lanes wide, was to be built by the state at a cost of $77 million.[20] In December 1949, it was determined that the state would pay for the cost of building the entire Schuylkill Expressway rather than the city of Philadelphia. Originally, it had been thought that the state would only pay for building the road between the Pennsylvania Turnpike and City Line Avenue. Effective January 1, 1950, the state would assume the cost of building the Schuylkill Expressway in exchange for turning over to the city of Philadelphia maintenance of 69.25 mi (111.45 km) of state highway within the city.[21]
The portion of the highway west of US 202 in King of Prussia was opened on November 20, 1950, as part of the turnpike's Philadelphia Extension.[22] The section from King of Prussia to Montgomery Avenue in Gulph Mills opened in October 1951.[23] The portion of the highway from Gulph Mills to Elizabeth Street in West Conshohocken opened a year later, on December 8, 1952.[24] The section between West Conshohocken and City Line Avenue opened on September 1, 1954.[25] Following the opening of this section of the Schuylkill Expressway, there were large traffic jams on roads near the eastern terminus at City Line Avenue due to the roads being inadequate to handle the increased traffic.[26] The expressway between City Line Avenue and Montgomery Drive opened to traffic on May 18, 1956.[27] The Walt Whitman Bridge and its approach road opened on May 15, 1957, with a dedication ceremony held.[28] On November 25, 1958, the Schuylkill Expressway opened between Montgomery Drive and Vine Street, including the Vine Street bridge over the Schuylkill River providing the expressway a connection to 22nd and Winter streets.[29] The highway was opened to traffic between Vine Street and South Street on October 23, 1959, months ahead of schedule.[30] On November 25, 1959, the entire expressway was complete with the opening of the segment between South Street and the Walt Whitman Bridge approach.[31][32]
Route numbers
Location | King of Prussia–Philadelphia |
---|---|
Length | 27.5 mi (44.3 km) |
Existed | 1951–1964 |
Location | King of Prussia–Philadelphia |
---|---|
Existed | 1958–1964 |
Location | Philadelphia |
---|---|
Existed | 1958–1964 |
The Schuylkill Expressway was initially designated as PA 43 and was cosigned with I-80S between King of Prussia and Center City Philadelphia and I-680 between Center City Philadelphia and the Walt Whitman Bridge when the Interstate Highway System was designated in 1956.[33][34] Prior to the roadways being signed as Interstates, I-395 was to be designated along the Schuylkill Expressway from the Vine Street Expressway to the Walt Whitman Bridge; however, I-680 was preferred to be the final designation for this route. On April 16, 1963, Pennsylvania wanted to renumber its Interstate numbers. Part of this was the renumbering from I-80S into I-76, and all of its auxiliary routes into I-x76. The Federal Highway Administration approved the request on February 26, 1964. As a result, I-80S became I-76 and I-680 became I-676.[34] In addition to this renumbering, the PA 43 designation was removed from the Schuylkill Expressway.[35] In 1972, the I-76 and the I-676 designations were switched onto their current routes, with the entire length of the Schuylkill Expressway designated as I-76.[36]
Improvements
Immediately after its completion, operational studies performed on the Schuylkill Expressway found that the route would be unable to cope with the area's growing traffic demands, due to the many substandard design elements and compromises incorporated to cope with the rugged, difficult routing of the road. In 1962, plans were announced for a parallel expressway along the east bank of the Schuylkill River known as the Manayunk Expressway; however, these plans were quickly withdrawn due to substantial opposition.[37] An alternative plan was then introduced to widen the entire highway to eight lanes in time for the United States Bicentennial in 1976. The proposal called for building the four eastbound lanes on top of the High Line railroad tracks to the west of 30th Street Station while keeping the westbound lanes in the current location. However, these plans were also shelved due to local disapproval including from the Philadelphia Bulletin newspaper, who opppsed the route along the High Line as they felt it would disrupt their property.[19] A scaled-down widening project was successfully undertaken from 1969 to 1972 to widen a short section of the road to six lanes through Fairmount Park.[19][38]
On March 1, 1985, the first phase of a reconstruction project on the Schuylkill Expressway began that reduced the highway to one lane in each direction between US 202 in King of Prussia and I-476 in West Conshohocken and between I-676/US 30 and University Avenue in Philadelphia in addition to closing several ramps along this stretch. Under this construction project, the steel median barrier was replaced with a concrete barrier in Montgomery County, road signs were replaced, the interchange with US 202 and PA 363 (Gulph Road) in King of Prussia was rebuilt, and the ramp between westbound I-676/US 30 and the eastbound Schuylkill Expressway was improved. As a result of the construction project, drivers were encouraged to take alternate routes. SEPTA offered additional bus, train, and trolley service and expanded parking lots at train stations in areas near the Schuylkill Expressway.[39] The first phase of the reconstruction project along the highway took nine months to complete, with traffic congestion from the construction less than anticipated as many drivers avoided the highway. On January 15, 1986, the first part of the second phase of the reconstruction project along the Schuylkill Expressway began between Belmont Avenue in Lower Merion Township and US 1 (Roosevelt Expressway) in Philadelphia, with several ramp closings. Drivers were again encouraged to use alternate routes while SEPTA offered additional train service on lines near the Schuylkill Expressway.[40] The second part of the second phase began on March 1, 1986, which extended construction along the Schuylkill Expressway between I-476 in West Conshohocken and I-676/US 30 in Philadelphia. As a result, there were additional ramp closures and traffic was reduced to one lane in each direction along this stretch.[41] Construction along this segment was finished by the end of the year.[42] However, construction of the I-676/US 30 interchange was stopped in May 1986 after it was noticed that there were gaps in the outer walls of the reinforced earth wall at the under-construction interchange; it was then determined that the interchange was sinking due to unstable subsoils. This construction error cost $50 million and would require the interchange to be torn down and rebuilt.[43][44]
Work on the final segment of the reconstruction between US 1 (Roosevelt Expressway) and University Avenue was to take place in 1987 and be completed in August of that year. However, on December 5, 1986, it was announced that construction was postponed until 1988 after a dispute between PennDOT and the contractors over extended construction delays.[45] On August 28, 1987, PennDOT released plans for the next reconstruction phase between US 1 (Roosevelt Expressway) and University Avenue, which was planned to take place between February 1, 1988, and September 30, 1989. The reconstruction would include lane reductions through the construction zone. The interchange with I-676/US 30 (Vine Street Expressway) will be rebuilt as part of this construction phase.[46] The rebuilt interchange would use a reinforced earth wall but would build it on a concrete slab drilled through the unstable soil using pilings into bedrock.[43] On February 1, 1988, the reconstruction of this section began with the closure of the ramp from I-676/US 30 to the eastbound Schuylkill Expressway and the closure of an eastbound lane.[47] On March 7, 1988, the Schuylkill Expressway was reduced to one lane in each direction between Montgomery Drive and I-676/US 30 (Vine Street Expressway) with several ramp closures along this stretch.[48] The final phase of the reconstruction project along the Schuylkill Expressway was completed on September 13, 1989, with the removal of traffic barriers. The entire reconstruction project cost $225 million.[49]
In the almost seven decades since its opening, congestion on the expressway has steadily increased. Plans to expand the expressway to eight lanes by building an upper deck, including high-occupancy toll lanes, were advocated by Pennsylvania House Speaker John Perzel in 2004, but never came to fruition.[50] PennDOT completed a scaled back version of a $23.7-million (equivalent to $32.9 million in 2023[51]) project to add 29 webcams on the Schuylkill Expressway between the Conshohocken Curve and Passyunk Avenue in 2008.[52]
On the afternoon of June 8, 2011, a section of the Schuylkill Expressway near Grays Ferry Avenue buckled from temperatures around 100 °F (38 °C), causing lane closures. The closed lane of the road was later reopened temporarily until full repairs could be made.[53] Exactly three months later, on September 8, 2011, heavy rains caused by Tropical Storm Lee caused a mudslide by Girard Avenue, blocking traffic.[54]
In May 2011, the new westbound entrance at South Gulph and South Henderson roads in King of Prussia was completed and in November the westbound exit was completed. The new interchange cost $10.5 million (equivalent to $14 million in 2023[51]) and used money from the American Recovery and Reinvestment Act of 2009.[55]
PennDOT has installed variable speed limit signs along the Schuylkill Expressway, where the speed limit can be lowered due to factors such as inclement weather or accidents as well as to manage traffic flow. The variable speed limit signs were activated on April 8, 2021.[56] The project incorporates variable-message signs to alert motorists to traffic congestion ahead. It could also coordinate with SEPTA to provide motorists with real-time mass transit information to give commuters an option to exit the highway and use public transportation to finish their trip at some point. There are also future plans to coordinate traffic signals on roads leading to the Schuylkill Expressway and install ramp meters on entrance ramps to the highway. PennDOT is in the preliminary stages of studying plans to use the right shoulder of the Schuylkill Expressway as a travel lane in certain sections during peak periods; construction of these lanes is not expected to begin until sometime in the mid-2020s.[57]
Exit list
Mileposts and exit numbers reflect the entire length of I-76, which is concurrent with the Pennsylvania Turnpike from the Ohio state line to the Valley Forge Interchange.
County | Location | mi[1] | km | Old exit[58] | New exit[58] | Destinations | Notes |
---|---|---|---|---|---|---|---|
Montgomery | Upper Merion Township | 327.28 | 526.71 | – | 326 | I-76 Toll west / I-276 Toll east / Penna Turnpike to I-476 Toll / I-95 – Harrisburg, Allentown, New York City | No exit number westbound; western terminus of Schuylkill Expressway |
Valley Forge Toll Plaza (eastern end of closed toll system) | |||||||
327.55 | 527.14 | 25 | 327 | North Gulph Road/Village Drive – Valley Forge | Eastbound exit and entrance; access to Valley Forge National Historical Park | ||
327.70 | 527.38 | Mall Boulevard | Westbound exit and entrance; access to King of Prussia shopping mall and Valley Forge Casino Resort | ||||
327.98– 328.23 | 527.83– 528.23 | 26 | 328 | US 202 / US 422 west / Swedesford Road – West Chester, Pottstown, King of Prussia | Signed as exits 328A (north) and 328B (south/west); access to Valley Forge National Historical Park via US 422 | ||
– | 329 | King of Prussia, Norristown | Westbound exit and entrance; access via South Gulph Road/South Henderson Road | ||||
330.30 | 531.57 | 27 | 330 | PA 320 – Gulph Mills | Westbound exit provided by Balligomingo Road; westbound entrance provided by exit 329; access to Villanova University and Rosemont College | ||
West Conshohocken | 332.36 | 534.88 | 28 | 331 | I-476 – Chester, Plymouth Meeting, Conshohocken | Signed as exits 331A (south) and 331B (north); exits 16A-B on I-476; Conshohocken signed eastbound | |
332.61 | 535.28 | 29 | 332 | PA 23 – Conshohocken | Eastbound access is via exit 331B; originally planned western terminus of the proposed Ten Mile Loop | ||
Lower Merion Township | 337.39 | 542.98 | 30 | 337 | Gladwyne | Westbound exit and eastbound entrance; access via Hollow Road | |
338.73 | 545.13 | 31 | 338 | Belmont Avenue/Green Lane | Access to Manayunk and Roxborough | ||
Montgomery–Philadelphia county line | Lower Merion Township–Philadelphia line | 340.20 | 547.50 | 33 | 339 | US 1 south (City Avenue) | Western terminus of US 1 concurrency; access to St. Joseph's University |
Philadelphia | Philadelphia | 340.34 | 547.72 | 32 | 340A | Lincoln Drive/Kelly Drive | Access to Germantown and Wissahickon Park |
340.92 | 548.66 | 34 | 340B | US 1 north / Roosevelt Boulevard | Eastern terminus of US 1 concurrency; access to Northeast Philadelphia | ||
342.55 | 551.28 | 35 | 341 | Montgomery Drive/Martin Luther King Jr. Drive | Access to Mann Music Center; no commercial vehicles | ||
343.73 | 553.18 | 36 | 342 | US 13 / US 30 west (Girard Avenue) – Philadelphia Zoo | Western terminus of US 30 concurrency; to East Fairmount Park | ||
344.57 | 554.53 | 37 | 343 | Spring Garden Street/Haverford Avenue | Eastbound exit and westbound entrance | ||
345.04 | 555.29 | 38 | 344 | I-676 east / US 30 east – Central Philadelphia | Eastern terminus of US 30 concurrency; western terminus of I-676 | ||
345.36 | 555.80 | 39 | 345 | Market Street (PA 3) / 30th Street – 30th Street Station | Access to Drexel University; access via Schuylkill Avenue; Market Street signed eastbound | ||
346.04 | 556.90 | 40 | 346A | South Street | Left exit; access to University of Pennsylvania | ||
346.80 | 558.12 | 41 | 346B | Grays Ferry Avenue/University Avenue | Originally planned eastern terminus of the proposed Five Mile Loop[59] | ||
347.41 | 559.10 | 42 | 346C | 28th Street/Vare Avenue/Mifflin Street | 28th Street signed eastbound; Vare Avenue and Mifflin Street signed westbound | ||
348.01 | 560.07 | 43A | 347A | To I-95 south / PA 291 (Penrose Avenue) – International Airport | Access via South 26th Street; eastbound exit and westbound entrance | ||
43B | 347B | Passyunk Avenue/Oregon Avenue | Signed as exit 347 westbound; Oregon Avenue not signed westbound | ||||
349.14 | 561.89 | 44 | 348 | PA 291 west (Penrose Avenue) | Westbound exit and eastbound entrance; east end of PA 291 | ||
349.65 | 562.71 | 45 | 349 | PA 611 (Broad Street) – Sports Complex | |||
350.14 | 563.50 | 46 | 350 | 7th Street/Packer Avenue to I-95 | I-95 not signed westbound; 7th Street not signed eastbound; no westbound entrance | ||
350.53 | 564.12 | 47 | 351 | I-95 / Front Street – Trenton, Chester, Airport | Westbound exit and eastbound entrance; exit 19 on I-95 | ||
Delaware River | 351.98 | 566.46 | Walt Whitman Bridge (westbound toll; cash or E-ZPass) | ||||
– | – | I-76 east – Atlantic City | Continuation into New Jersey | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
- ^ a b DeLorme Street Atlas USA 2007, Toggle Measure Tool. Retrieved on March 26, 2007.
- ^ "Accidents, delayed flights and travel headaches across the region". The Philadelphia Inquirer. March 16, 2007.
- ^ "The Roads of Metro Philadelphia: Schuylkill Expressway (I-76)". Retrieved 2007-03-24.
- ^ "Pennsylvania Highways: Interstate 76". Retrieved 2007-03-24.
- ^ Traffic Volumes for Philadelphia County (PDF) (Map). PennDOT. 2022. Retrieved June 30, 2024.
- ^ Traffic Volumes for Montgomery County (PDF) (Map). PennDOT. 2022. Retrieved June 30, 2024.
- ^ "Schuylkill Expressway Work Entering Time of Worst Jams". The New York Times. February 23, 1986. Retrieved 2007-03-24.
- ^ "Pennsylvania Turnpike: Schuylkill Expressway". www.pahighways.com. September 30, 2022. Retrieved January 9, 2023.
- ^ "Penn students propose a plan to connect their campus to the Schuylkill". 30 November 2006. Retrieved 4 October 2014.
- ^ a b c d e f Google (February 7, 2017). "overview of Schuylkill Expressway" (Map). Google Maps. Google. Retrieved February 7, 2017.
- ^ a b c Montgomery County, Pennsylvania Highway Map (PDF) (Map). PennDOT. 2016. Retrieved February 7, 2017.
- ^ "MONTGOMERY COUNTY COMMISSIONERS TO UNVEIL NEW VIDEO MONITORING CAPABILITY FOR AREA HIGHWAYS". Montgomery County Press Release. April 13, 2004. Retrieved 2007-03-24.
- ^ "Conshohocken Curve". WPVI. Retrieved 2009-08-09.
- ^ "Rain Closes expressway east of Conshohocken Curve". The Philadelphia Inquirer. Associated Press. 2009-08-02.
- ^ "Rains flood region". Retrieved 2009-08-09.
- ^ a b c Philadelphia County, Pennsylvania Highway Map (PDF) (Map). PennDOT. 2016. Retrieved February 7, 2017.
- ^ Regional Plan of the Philadelphia Tri-State District. Regional Planning Federation. 1932.
- ^ a b Philadelphia Expressway Program. Philadelphia City Planning Commission. 1947.
- ^ a b c Bowden, Mark (April 17, 1983). "The Schuylkill - The road that can't be fixed". The Philadelphia Inquirer. p. 489-490.
- ^ Williams, Edgar (February 19, 1950). "$260,000,000 Traffic Solution". The Philadelphia Inquirer. p. 145.
- ^ McCullough, John M. (December 7, 1949). "State Will Foot Entire Expense Of Expressway". The Philadelphia Inquirer. p. 1, 45.
- ^ "100 Miles Added to Pennsylvania Turnpike As Eastern Section Opens Near Philadelphia". The New York Times. November 21, 1950. p. 14.
- ^ "Scarcity of Bridge Steel Expected to Delay Completion of Valley Forge Expressway". The Philadelphia Inquirer. October 22, 1951. p. 19.
- ^ "Express Highway Section Opened". The Philadelphia Inquirer. December 9, 1952. p. 33. Retrieved March 13, 2024.
- ^ "State Police Plan 24-Hour Patrol as Expressway Opens Today From W. Conshohocken to City Line". The Philadelphia Inquirer. September 1, 1954. p. 35.
- ^ "Expressway Bottleneck a Warning, Not a Surprise". The Philadelphia Inquirer. September 3, 1954. p. 10.
- ^ "Expressway Set For Extension". The Philadelphia Inquirer. May 17, 1956. p. 15.
- ^ Rosen, Frank (May 15, 1957). "Walt Whitman Bridge: Aid to Traffic-Tangled Valley". The Philadelphia Inquirer. p. 3.
- ^ Gilson, James T. (November 26, 1958). "River Expressway Opens With Jams And Hitches". The Philadelphia Inquirer. p. 1.
- ^ "PRR-South St. Expressway Link Is Opened Early". The Philadelphia Inquirer. October 24, 1959. p. 11.
- ^ "Expressway Link to Open". The Philadelphia Inquirer. November 24, 1959. p. 35. Retrieved March 13, 2024.
- ^ "Express Section To Bridge Open". The Philadelphia Inquirer. November 26, 1959. p. 53.
- ^ Official Map of Pennsylvania (back) (PDF) (Map). Pennsylvania Department of Highways. 1960. Retrieved January 16, 2014.
- ^ a b "Was I-76 Numbered to Honor Philadelphia for Independence Day, 1776?". Ask the Rambler. Federal Highway Administration. January 18, 2005. Retrieved June 6, 2007.
- ^ Official Map of Pennsylvania (back) (PDF) (Map). Pennsylvania Department of Highways. 1970. Retrieved December 16, 2014.
- ^ U.S. Route Numbering Subcommittee (June 20, 1972). "U.S. Route Numbering Subcommittee Agenda Showing Action Taken by the Executive Committee" (Report). Washington, DC: American Association of State Highway Officials. p. 425. Retrieved October 16, 2014 – via Wikisource.
- ^ "Survey Ordered for New Expressway". The Philadelphia Inquirer. January 17, 1962. p. 31.
- ^ Kohler, Saul (September 5, 1968). "Extra Lanes Planned for Expressway". The Philadelphia Inquirer. p. 1.
- ^ Nussbaum, Paul (February 24, 1985). "A survival guide to the Schuylkill". The Philadelphia Inquirer. p. 1-B, 10-B.
- ^ Caba, Susan (January 12, 1986). "Caution: Expressway work ahead". The Philadelphia Inquirer. p. 1-A, 14-A.
- ^ Caba, Susan (March 2, 1986). "Schuylkill roadwork intensifies". The Philadelphia Inquirer. p. 1-B, 4-B.
- ^ "Commuter advisory - Schuylkill rebuilding winds down". The Philadelphia Inquirer. November 30, 1986. p. 7-B.
- ^ a b Bowden, Mark (November 13, 1988). "Untangling the $50 million Schuylkill blunder". The Philadelphia Inquirer. p. 1-A, 14-A.
- ^ Hollman, Laurie (September 17, 1989). "A new life at the end of the roadwork". The Philadelphia Inquirer. p. 3-C.
- ^ Caba, Susan (December 6, 1986). "Expressway plans grind to a halt". The Philadelphia Inquirer. p. 1-A, 12-A.
- ^ Byrd, Jerry W. (August 29, 1987). "Worst is yet to come on Schuylkill". The Philadelphia Inquirer. p. 1-A, 8-A.
- ^ Bowden, Mark (January 31, 1988). "Schuylkill: Worst begins, ramp by ramp - Final portion of project begins tomorrow". The Philadelphia Inquirer. p. 1-A, 10-A.
- ^ "New lane restrictions on the Schuylkill Expressway". The Philadelphia Inquirer. March 6, 1988. p. 5-B.
- ^ Hollman, Laurie (September 14, 1989). "Going that extra mile to finish the expressway". The Philadelphia Inquirer. p. 13-B.
- ^ Cattabiani, Mario F.; Downs, Jere (February 25, 2004). "Overhead lanes for Schuylkill and I-95? - Those, plus Roosevelt Blvd. underpasses, are fancied by House Speaker John Perzel. The ideas are in early stages". The Philadelphia Inquirer. p. B01.
- ^ a b Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- ^ Mucha, Peter (March 14, 2008). "PennDot readies Web cams for Schuylkill Expressway - By fall, there are expected to be more than 225 traffic video cameras in the region". The Philadelphia Inquirer. p. B04.
- ^ McCarthy, Kevin (June 8, 2011). "Excessive Heat Causes I-76 to Buckle: PENNDot". Philadelphia, PA: WCAU-TV. Retrieved June 9, 2011.
- ^ Nussbaum, Paul (September 9, 2011). "Flooding makes for rough going on Philly roads and rails". The Philadelphia Inquirer. p. A11.
- ^ Nussbaum, Paul (November 4, 2011). "New I-76 ramp opens in King of Prussia". The Philadelphia Inquirer. Retrieved November 7, 2011.
- ^ Chirico, Jeff (April 8, 2021). "PennDOT activates variable speed limit signs along Schuylkill Expressway to help balance traffic". Philadelphia, PA: WPVI-TV. Retrieved April 8, 2021.
- ^ Simansky, Matt; Taff, Brian (April 30, 2019). "What you can do to improve congestion on the Schuylkill Expressway". Philadelphia, PA: WPVI-TV. Retrieved April 30, 2019.
- ^ a b "Pennsylvania Exit Numbering" (PDF). Pennsylvania Department of Transportation. Retrieved October 2, 2007.
- ^ "Cobbs Creek Expressway". www.phillyroads.com. Retrieved January 9, 2023.