Batang–Semarang Toll Road

From the AARoads Wiki: Read about the road before you go
(Redirected from Batang-Semarang Toll Road)
Jump to navigation Jump to search

Batang-Semarang Toll Road

Kalikuto Bridge.jpg
Kalikuto Bridge on Batang–Semarang Toll Road
Route information
Part of AH 2
Maintained by PT Jasamarga Semarang Batang
(PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya))
Length75 km (47 mi)
Existed2018–present
Major junctions
West endBatang
Major intersections
East endSemarang
Location
CountryIndonesia
Major cities
Highway system

Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]

Sections

Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:

  • Section I, beginning of project - East Batang (3.2 km)
  • Section II, East Batang - Weleri (36.35 km)
  • Section III, Weleri - Kendal (11.05 km)
  • Section IV, Kendal - Kaliwungu (13.5 km)
  • Section V, Kaliwungu - Krapyak (10.9 km)

Exits and Gates

Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only

ProvinceLocationkmmiExitNameDestinationsNotes
Central JavaKandeman, Batang Regency00.0348Kandeman Toll GateWestern terminus
Gringsing, Batang Regency23.9614.89371Gringsing Toll Gate
  • Gringsing
  • Industrial Area
Weleri, Kendal Regency36.1022.43384Weleri Toll Gate
Pegandon, Kendal Regency47.0429.23395Kendal Toll Gate
Kaliwungu, Kendal Regency60.4037.53409Kaliwungu Toll Gate
  • Kaliwungu
  • Boja
Ngaliyan, Semarang64.8840.31Kalikangkung Toll Gate (Main toll gate)
71.3044.30419Krapyak InterchangeEastern terminus, Eastern end of ID Tol14-1.svg Toll Road Route 1, Western end of ID Tol14-6.svg Toll Road Route 6
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ Inilah Pemenang Lelang Jalan Tol Batang-Semarang
  2. ^ "Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018". Retrieved 23 December 2017.
  3. ^ "Jalan Tol Batang - Semarang Selesai Akhir 2018". Archived from the original on 17 April 2018. Retrieved 23 December 2017.
  4. ^ "Batang and Balikpapan toll road projects accelerated". Archived from the original on 23 December 2017. Retrieved 23 December 2017.