A16 (Great Britain)
Route information | ||||
---|---|---|---|---|
Length | 78.3 mi[1] (126.0 km) | |||
Major junctions | ||||
South end | A47 in Peterborough | |||
A151 near Spalding A17 in Sutterton | ||||
North end | A180 in Grimsby | |||
Location | ||||
Country | United Kingdom | |||
Constituent country | England | |||
Primary destinations | Spalding Boston | |||
Road network | ||||
|
The A16 (Great Britain) is a principal road of Lincolnshire in the East Midlands region of England, connecting the port of Grimsby and Peterborough, where it meets the A1175, A47 & A1139 then on to the A1 and the A605; the latter, in turn, giving a through route to Northampton and the west, and south west of England. Its length is 78 miles (126 km). The road was "de-trunked", with responsibility largely returned to Lincolnshire County Council from the Highways Agency in 2002.[2][3]
Settlements on route
From north to south its route is:
- Grimsby
- Utterby
- Louth (now bypassed)
- Burwell
- Walmsgate
- Dalby
- Partney (now bypassed)
- Spilsby
- East Keal
- Keal Cotes
- Stickford (now bypassed)
- Stickney
- Sibsey
- Hilldyke
- Boston
- Wyberton (now bypassed)
- Kirton (now bypassed)
- Surfleet (now bypassed)
- Pinchbeck (now bypassed)
- Spalding (now bypassed)
- Crowland (bypassed)
- Peterborough
The road is a Primary Route for its entire length. Most of the A16 is single carriageway.
History
Ludborough Bypass opening
The 1-mile (1.6 km) £1.2 million Ludborough Bypass opened on 25 October 1992.[4]
Fotherby Bypass opening
The 1-mile (1.6 km) Fotherby Bypass opened in 2004.[citation needed]
Louth Bypass opening
3-mile (4.8 km) £6.6 million Louth Bypass opened in August 1991.[5]
Partney Bypass opening
The 1-mile (1.6 km) Partney Bypass opened in August 2005.[citation needed]
Stickford Bypass opening
The 1-mile (1.6 km) £1 million Stickford Bypass opened in October 1992.[citation needed]
Boston Inner Relief Road opening
The £1.4 million Boston Inner Relief Road opened in early 1978.[citation needed]
Boston-Algarkirk Diversion opening
The 6-mile (9.7 km) £11.5 million Boston-Algarkirk Diversion opened in October 1991.[citation needed]
Spalding Bypass opening
The 11-mile (18 km) £23 million Spalding-Sutterton Improvement (the Spalding Bypass) opened in August 1995.[6]
Junction list
County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Cambridgeshire | Peterborough | 0.0 | 0.0 | A47 (Eye Road) / Welland Road to A1 / A15 / A605 – Wisbech, Peterborough, Leicester, Dogsthrope, The North, London, Sleaford, Northampton, Eye, Eye Green, Thorney | Southern terminus |
Lincolnshire | Cowbit–Spalding boundary | 13.1 | 21.1 | A1175 south-west / B1173 (Barrier Bank) to A15 – Stamford, Spalding town centre, Bourne, Deeping St Nicholas, Market Deeping | North-eastern terminus of A1175 |
Spalding | 16.2 | 26.1 | A151 (Holbeach Road) to A17 – Spalding, Holbeach, King's Lynn, Weston, Moulton | ||
Surfleet | 19.8 | 31.9 | A152 north-west – Surfleet, Gosberton, Donington | South-eastern terminus of A152 | |
Sutterton | 23.2 | 37.3 | A17 / Station Road to A52 – King's Lynn, Sleaford, Grantham, Sutterton, Fosdyke, Wigtoft | ||
Boston | 29.7 | 47.8 | A52 west (Liquorport Road) to A1121 – Grantham, Sleaford | Southern terminus of A52 concurrency | |
29.9 | 48.1 | A1138 south (South End) – Fishtoft | Fishtoft signed northbound only; northern terminus of A1138 | ||
30.4 | 48.9 | Horncastle Road (A1137 west) / Wide Bargate / B1183 – Horncastle | Eastern terminus of A1137 | ||
31.2 | 50.2 | A52 east (Wainfleet Road) – Wainfleet, Fishtoft | Fishtoft signed southbound only; northern terminus of A52 concurrency | ||
West Keal–East Keal boundary | 43.4 | 69.8 | A155 west (Main Road) to A153 – Sleaford, West Keal, East Kirkby | Eastern terminus of A155 | |
Partney | 47.5 | 76.4 | A158 – Skegness, Lincoln, Partney, Scremby, Burgh le Marsh, Sausthorpe, Horncastle | ||
Ulceby with Fordington | 51.4 | 82.7 | A1028 south-east (Main Road) / A1104 north-east to A158 – Skegness, Mablethorpe, Ulceby, Alford, Bilsby | Ulceby signed northbound only; north-western terminus of A1028; south-western terminus of A1104 | |
Raithby cum Maltby | 60.4 | 97.2 | A157 east (Station Road) / B1520 (London Road) – Mablethorpe, Louth, Manby, Saltfleetby | Southern terminus of A157 concurrency | |
Elkington | 62.6 | 100.7 | A157 west / B1200 to A631 – Lincoln, Louth, Gainsborough, Market Rasen, Wragby | Northern terminus of A157 concurrency | |
Utterby–Ludborough boundary | 67.9 | 109.3 | A18 west – Immingham, Humber Bridge, Ludborough, North Ormsby | Eastern terminus of A18 | |
New Waltham | 74.6 | 120.1 | Louth Road (A1243 north) / Becklands Avenue – Scartho | Southern terminus of A1243 | |
75.3 | 121.2 | A1098 north (Hewitt's Avenue) – Cleethorpes | Southern terminus of A1098 | ||
Grimsby | 76.9 | 123.8 | A46 (Weelsby Road) – Cleethorpes, Lincoln | ||
77.8 | 125.2 | Ellis Way / Frederick Ward Way (A1136) - Town centre | |||
78.3 | 126.0 | A180 (Cleethorpe Road / Westgate) / Lockhill / M180 – Cleethorpes, Immingham | Northern terminus | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Future
Boston Distributor Road
There are demands for Boston to be bypassed. Therefore, Lincolnshire County Council have 'safeguarded' the corridor for the Boston Distributor Road. [7]
Incidents
There are multiple crashes on the A16, especially near Louth and Crowland. [8]
Spalding-Peterborough route change
Old route of the A16
The route of the A16 changed following the completion of the new Spalding-Peterborough link road. The section between Spalding to the south of Crowland only, opened in August 2010; the remainder was completed in October 2011. The new route has taken the number A16, effectively linking the route with Peterborough, with the current road from Spalding to Stamford becoming the A1175.[9]
A1073 (Great Britain)
This new section replaced the A1073 (Great Britain), a road that ran between the former A16 at 0.81 miles (1.3 km) south of Spalding in Lincolnshire and the A47 between Eye and Eye Green at near Peterborough. [10][11][12]
The A1073 route had become increasingly dangerous over the years because traffic usage had increased. It was narrow with many blind corners and slopes, and much of it was on an embankment with deep ditches either side and no run-off areas. There were dangerous junctions, particularly with the B1443 between Peakirk and Thorney, which formed a staggered crossroads. The road was a principal route servicing the food-processing industry in Spalding, bringing in supplies and moving products to the supermarket distribution system to the south.
An upgrade to the route had been under discussion for many years. The main hold-up was arguments over funding between the administrative counties of Lincolnshire, Cambridgeshire and the Department for Transport, exacerbated by the actions of a former Leader of Lincolnshire County Council who went to jail for seeking to influence the route to his own financial advantage.[13] Eventually a route was agreed, avoiding Cowbit and Crowland and joining the A47 west of Eye, and in 2008 construction work began, originally due to be completed by Autumn 2010.[14][15]
The Northern 8.3 miles (13.4 km) of the new route opened between Spalding and the roundabout south of Crowland in Autumn 2010, with the opening of the Southern 4.8 miles (7.7 km) delayed due to structural problems at the embankment at Car Dyke Bridge. On completion of remedial repairs and the opening of the Southern portion on 16 October 2011, the new road was renumbered to form part of the A16; the original A1073 alignment between Spalding and Eye Green became an unclassified local road.[16]
References
- ^ a b "Peterborough PE4 7AA, UK to Cowbit, Spalding, UK to A16, Spilsby, UK to Grimsby, United Kingdom". Google Maps. Alphabet Inc. Retrieved 25 February 2023.
- ^ "Could the M11 motorway be extended to the Humber Bridge?". Grimsby Telegraph. 9 November 2017. Retrieved 9 November 2017.
- ^ "Local Transport Plan: Chapter 19: Detrunking" (PDF). Lincolnshire County Council. Retrieved 9 November 2017.
- ^ "Bypass opens tomorrow". Grimsby Evening Telegraph. 24 October 1992. Retrieved 8 September 2023.
- ^ Craig, Peter (22 August 1991). "A new route to the coast". Scunthorpe Evening Telegraph. Retrieved 8 September 2023.
- ^ "Road to close for work to proceed". Horncastle Target. 6 September 1995. Retrieved 8 September 2023.
- ^ "Boston Distributor Road". Lincolnshire County Council. Retrieved 2022-12-10.
- ^ "A16". Grimsby Live. Retrieved 2022-12-10.
- ^ Chance to see route of £69.8 million road from Spalding to Eye Archived 29 September 2008 at the Wayback Machine, Lincs. Free Press, 25 September 2008
- ^ "Protest at A1073 delay to go to Westminster". Spalding Guardian - Lincolnshire Free Press. 2016-03-21. Archived from the original on 21 March 2016. Retrieved 2022-12-10.
- ^ "The A1073 Spalding to Eye improvement". Peterborough City Council. 2016-04-24. Archived from the original on 24 April 2012. Retrieved 2022-12-10.
- ^ "Safety concerns delay full opening of A1073 (Great Britain) scheme". BBC News. 2010-08-05. Retrieved 2022-12-10.
- ^ "BBC report of trial of council leader". BBC News. 2004-04-02.
- ^ "Work starts on £80m road scheme". BBC News. 2008-02-26. Retrieved 2010-01-01.
- ^ "A1073 – Spalding to Eye Improvement Scheme". Lincolnshire County Council. Archived from the original on 16 August 2011. Retrieved 2010-03-07.
- ^ Chance to see route of £89 million road from Spalding to Eye Archived 29 September 2008 at the Wayback Machine, Lincs. Free Press, 25 September 2008