Florida State Road 404

From the AARoads Wiki: Read about the road before you go
(Redirected from Pineda Causeway)
Jump to navigation Jump to search

State Road 404

Pineda Causeway
SR 404 highlighted in red
Route information
Maintained by FDOT
Length4.139 mi[1] (6.661 km)
Existed1973–present
Major junctions
West end US 1 near Palm Shores
East end SR A1A in South Patrick Shores
Location
CountryUnited States
StateFlorida
CountyBrevard
Highway system
SR 401 SR 405

State Road 404 (SR 404), the Pineda Causeway, is an east–west divided highway currently running from Interstate 95 (I-95) to SR A1A at Patrick Space Force Base, Florida, US. It was opened as a toll road in 1971 and classified as a state road two years later. The tolls were removed in 1990. It was named after Pineda, a former village east of Suntree on U.S. Route 1 (US 1). With interchanges at US 1 (SR 5), South Tropical Trail (County Road 3, CR 3), and South Patrick Drive (SR 513), the Pineda Causeway is (along with SR A1A) the primary access for Patrick Space Force Base and the southern end of Merritt Island. From US 1 to the eastern terminus, it is part of the Indian River Lagoon Scenic Highway system.

Route description

Pineda Causeway from US 1

The Pineda Causeway Extension begins at an interchange with Interstate 95 at exit 188. From I-95, the Pineda Causeway Extension passes between developments to its north and south. After an intersection with a local road, the route curves to the northeast and later resumes its eastward course, reaching Wickham Road.[2] The route turns to the east and moves across the Florida East Coast Railway,[2] via a partially completed overpass.[3]

East of the railway, the route crosses below US 1. The eastbound lane has an exit ramp that connects to both directions of US 1; in contrast, the westbound lane has a dedicated exit for both US 1 northbound and a loop to US 1 southbound. The road continues to the east, crossing a small inlet and a small island before ascending over the Indian River with twin bridges. At the eastern end of the bridges, the route again crosses a small island and inlet before reaching a narrow portion of Merritt Island. There, the causeway intersects with CR 3. The route crosses a series of islands, forming another twin set of bridges over the Banana River. After reaching land for the final time, the route enters South Patrick Shores and passes to the south of Patrick Space Force Base. It has a partial interchange with SR 513, with only an eastbound exit and a westbound entrance. After passing north of a housing development, the causeway ends at an intersection with SR A1A.[2]

Along the causeway east of the extension, the Florida Department of Transportation (FDOT) estimated in 2011 that 37,500 cars drove on the route each day.[4] According to the Space Coast Transportation Planning Organization, 30,245 cars drove on the route between U.S. 1 and I-95.[3]

As part of a pilot project, FDOT has painted the shoulders as bike lanes, thus allowing cyclists on a controlled-access highway that had been closed to them.[5]

History

Due to high traffic involving the Kennedy Space Center and Patrick Space Force Base in eastern Brevard County, local politicians in the early 1960s petitioned the United States Bureau of Public Roads for federal funding in creating a new causeway across the Banana River, between the Eau Gallie Causeway and SR 520. Although the federal agency declined twice due to low traffic projections, local officials maintained the need for the proposed causeway.[6] In November 1969, after FDOT opened bids for various state construction projects, the Gregg, Gibson & Gregg Inc. put out a $7.7 million estimate to build the causeway from US 1 to the eastern shore of the Banana River.[7] Ultimately, the original Pineda Causeway was opened in 1972, costing about $7 million to construct.[8] In the previous year, the route's interchanges with US 1 and CR 3, as well as the bridges, were completed. In 1972, the interchange with SR 513 was finished.[9] On May 31, 1973, FDOT classified the bridge and causeway as State Route 404.[10]

Initially it was a toll road, which funded the road's maintenance. However, FDOT agreed in 1989 to remove the fee and pay for maintenance. In June 1990, workers removed the toll along the Pineda Causeway, along with the Bennett Causeway to the north, at a cost of $745,000.[8] The interchange with U.S. 1, which was first built in 1971, was reconstructed in 1997.[9] In 1999, the route became part of the newly created Indian River Lagoon Scenic Highway, which was a series of roads around the Indian River Lagoon.[11]

In conjunction with a project to add additional lanes to I-95, FDOT authorized funding in March 2008 to create an interchange with an extension of the Pineda Causeway. The two projects were estimated to cost $202 million upon completion. On May 2, 2011, the interchange with I-95 opened.[12] FDOT also authorized $10 million to complete the extension from the interchange to its original routing.[13] The overall cost of the extension was estimated at $27 million, of which the remainder not financed by FDOT was paid by impact fee and gas tax. Groundbreaking for the extension occurred on December 14, 2007,[14] and the project was finished in May 2011.[13] This created a 1.9 mi (3.1 km) extension of the highway after decades of planning; once finished, it became a hurricane evacuation route. The project was expected to aid the local economy due to ease of travel from I-95 to the beach.[15]

In 2008, Brevard County commissioned a $400,000 study to create an overpass for the causeway over the Florida East Coast Railway line, located just west of US 1.[16] In July 2018, FDOT began a $24 million construction project to build a bridge over the Florida East Coast Railway, at a height of 25 ft (7.6 m), as well as to add a traffic signal for Holy Trinity Episcopal Academy. The eastbound bridge was finished on March 19, 2020. The overpass was named for Major General John Cleland, a local World War II veteran.[3]

The extension dead-ended just west of the I-95 interchange until May 5, 2021 when it was connected to Pineda Boulevard, which connects to Lake Andrew Drive. Eventually, Pineda Boulevard will connect to Stadium Parkway and Wickham Road.[17]

Exit list

The entire route is in Brevard County.

Locationmi[1]kmDestinationsNotes
−2.8[18]−4.5 I-95 (SR 9)Exit 188 (I-95); western terminus of Pineda Causeway
Melbourne−0.5[18]−0.80Wickham Road (CR 509) / Pineda Plaza WayAt-grade intersection; western terminus of signed SR 404
0.0000.000West end of state maintenance
0.190.31 US 1 (SR 5) – Cocoa, Melbourne
0.688–
1.120
1.107–
1.802
Pineda Causeway over Indian River (Atlantic Intracoastal Waterway)
Merritt Island1.642.64 CR 3 (South Tropical Trail) – Merritt Island
2.182–
2.372
3.512–
3.817
Pineda Causeway over Banana River
South Patrick Shores3.615.81 SR 513 – Patrick Space Force BaseEastbound exit and westbound entrance
4.1396.661 SR A1A – Patrick Space Force Base, Satellite BeachAt-grade intersection; eastern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ a b FDOT straight line diagrams Archived March 6, 2014, at the Wayback Machine, accessed March 2014
  2. ^ a b c Google (2011-11-08). "Overview Map of State Road 404" (Map). Google Maps. Google. Retrieved 2011-11-08.
  3. ^ a b c Rick Neale (March 31, 2020). "Pineda Causeway bridge over railroad tracks opens to eastbound traffic". Florida Today.
  4. ^ Greg Pallone (2011-05-26). "New causeway extension provides another hurricane escape route". Orlando: Central Florida News 13. Archived from the original on 2011-11-08. Retrieved 2011-11-08.
  5. ^ Space Coast Daily, State Completes Bicycle Lane On Pineda Causeway, August 2, 2013
  6. ^ Sue Butler (1963-09-23). "Says Causeway Not Abandoned". Daytona Beach Sunday News-Journal. Retrieved 2011-11-08.
  7. ^ "Bridge, Road Bids Received by State". Sarasota Herald-Tribune. Associated Press. 1969-11-21. Retrieved 2011-11-08.
  8. ^ a b Susan Jacobson (1990-06-22). "Causeway Tolls To End In 1 Week Motorists Jubilant Toll Booths On Way Out". Orlando Sentinel. Archived from the original on 2013-09-26. Retrieved 2011-11-08.
  9. ^ a b Florida Department of Transportation (2011). "Florida Bridge Information" (PDF). Retrieved 2011-11-08.
  10. ^ FDOT ‐ Transportation Statistics Office (2011-07-18). "2011 Listing of Designated Roads in Florida" (PDF). p. 3. Retrieved 2011-11-08.
  11. ^ Indian River Lagoon Scenic Highway Corridor Advocacy Group (2011). "Indian River Lagoon Scenic Highway Corridor Management Plan" (PDF). Archived from the original (PDF) on 2012-05-22. Retrieved 2011-11-08.
  12. ^ Florida Department of Transportation (August 2011). "Summary of Public Private Partnership Project" (PDF). Retrieved 2011-11-06.
  13. ^ a b Florida Department of Transportation (2011-07-19). "Brevard County" (PDF). Retrieved 2011-11-06.
  14. ^ Tony Judnich (2007-10-19). "Groundbreaking set for Pineda Causeway work". Hometown News. Archived from the original on 2012-04-06. Retrieved 2011-11-08.
  15. ^ Ken Datzma (2009-12-07). "Pineda Extension linking I–95 in Melbourne seen as economic lift for area" (PDF). Brevard Business News. Vol. 27, no. 49. Retrieved 2011-11-08.[permanent dead link]
  16. ^ "Has Money For Flyover Bridge Been Wasted?". WFTV9 ABC. May 23, 2011. Retrieved April 2, 2020.
  17. ^ Gaffey, Mike. "Pineda Causeway-Lake Andrew Drive extension opens to traffic". Viera Voice. Retrieved 7 August 2021.
  18. ^ a b Google Maps distance