Peripheral Ring Road

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Peripheral Ring Road

Route information
Length73 km (45 mi)
Major junctions
North endTumkur Road
South endHosur Road
Location
CountryIndia
StatesKarnataka
Highway system

The Peripheral Ring Road (PRR) is a proposed 12-lane ring road[1] that runs around Bangalore, Karnataka,.[2] It will have 8-lane access-controlled main carriageway along with 2-lane service roads on both sides. It is outside of Outer Ring Road, Bangalore, which is a 60-kilometre-long road.

Peripheral Ring Road (PRR) has 2 components PRR-1 and PRR-2. PRR-1 is a 73-km access-controlled expressway around east and northern parts of the Bangalore. PRR-2 is in DPR stage, which may cover other half.[3]

History

Outer ring road}} The reason for creating the PRR was to decongest the Outer Ring Road which currently acts as a by-pass to the city with more than 10,000 trucks using it. According to BDA's project report, with the immense growth in intra-city traffic, the ORR is under tremendous pressure already[citation needed]. The city has already extended beyond the ORR which is a key factor in the increasing pressure on ORR.

In order to relieve the traffic pressure on the ORR and the major road networks of the city, a peripheral ring road (PRR) of 116 km was planned outside of the ORR. This stretch is planned to not only improve connectivity of areas beyond the ORR, but also ease the congestion on the ORR. The BDA was focussed on the first phase of the project from Hosur Road to Tumakuru Road with a distance of 67 km.[4] While 1,810 acres were notified for acquisition in the final notification in 2007 for the Peripheral Ring Road (PRR) project, the Bangalore Development Authority (BDA) barely managed to acquire 3.21 acres of land.[5] Urban Development Minister Byrathi Suresh “The PRR is an essential project for Bengaluru, and exploring Public–private partnership, else Bangalore Development Authority will take up the work, responsibility for executing the entire project."[6]

See also

References

  1. ^ "Karnataka cabinet gives nod to Bengaluru Peripheral Ring Road project". India Today. 10 February 2022.
  2. ^ "Peripheral Ring Road gets environment panel okay". Deccan Herald. 21 March 2023.
  3. ^ "Amid struggle to lay PRR-1, BDA invites bids for DPR on PRR-2". The Times of India. 2024-03-01. ISSN 0971-8257. Retrieved 2024-03-04.
  4. ^ "BDA expects cost of PRR project to skyrocket". Deccan Herald. 18 August 2019.
  5. ^ "BDA acquired 3 acres in 18 years for Peripheral Ring Road project in Bengaluru". The Hindu. 1 August 2023.
  6. ^ "Peripheral Ring Road to get new boost". Bangalore Mirror. 1 July 2023.

External links