M-13 (Pakistan)

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

M-13

ایم ١٣ موٹروے
Kharian-Rawalpindi Motorway
Route information
Maintained by National Highway Authority
Length117 km (73 mi)
HistoryUnder Construction
Major junctions
East endPakistan M-12.svg Kharian
West endPakistan N-5.svg Rawalpindi
Location
CountryPakistan
Major cities
Towns
Highway system

The M-13 motorway (Urdu: موٹروے 13 ), or the Kharian-Rawalpindi motorway, is a motorway in Pakistan, under construction since September 2022.[1] M-13 will connect Rawalpindi to Kharian. The 117 km (73 mi) long motorway will have 8 interchanges, 2 service areas, 26 bridges, including one spanning River Jhelum, and two twin-tube tunnels of 1.3 km (0.81 mi) and 0.6 km (0.37 mi) respectively to cross the Salt Range between Dina and Sohawa.[2] The M-13 will be a six-lane motorway with a design speed of 120 km/h (75 mph) and an expected completion time of 2 years.[3] The motorway will reduce the travel time between the capital cities of Islamabad and Lahore by one hour compared to the existing M2 Motorway, while also taking traffic off of the congested N5 Highway that runs parallel to it.[1] It is link to M2 Motorway via Rawalpindi Ring Road.

References

  1. ^ a b Butt, Waseem Ashraf (2022-09-30). "Land being acquired for Kharian-Pindi motorway". DAWN.COM. Retrieved 2022-12-09.
  2. ^ "Request for Proposal - Kharian Rawalpindi Motorway" (PDF). National Highways Authority (NHA). 7 February 2022. pp. 49–50. Retrieved 9 December 2022.
  3. ^ "Transaction structure of Kharian-Rawalpindi Motorway approved". DAWN.COM. 2021-10-16. Retrieved 2022-12-09.

External links