Interstate 57
Interstate 57 (I-57) is a north–south Interstate Highway in Arkansas, Missouri, and Illinois, which currently exists in two segments. The southern segment runs from I-40 in North Little Rock, Arkansas, to Walnut Ridge, Arkansas, following U.S. Highway 67 (US 67). The northern segment runs from Sikeston, Missouri, at I-55 to Chicago, Illinois, at I-94. The northern section parallels the old Illinois Central Railroad for much of its route. I-57 essentially serves as a shortcut route for travelers headed between the Southern U.S. (Memphis, New Orleans, etc.) and Chicago, bypassing St. Louis, Missouri, and Springfield, Illinois. Between the junction of I-55 and I-57 in Sikeston and the junction of I-55 and I-90/I-94 in Chicago, I-55 travels for 436 miles (702 km), while the combination of I-57 and I-94 is only 396 miles (637 km) long between the same two points. In fact, both the control cities on the overhead signs and the destination mileage signs reference Memphis along southbound I-57, even as far north as its northern origin at I-94 in Chicago.[2] Likewise, at its southern end, Chicago is the control city listed for I-57 on signs on northbound I-55 south of Sikeston, even though I-55 also goes to Chicago.[3] A southward extension of I-57 to North Little Rock, Arkansas, is currently in various stages of development.
As of 2023, I-57 has no spur routes nor are any planned for the near future.[4] At a length of just over 386 miles (621 km), it is the second-longest primary Interstate Highway without an auxiliary route, behind I-49. I-57 has one business loop in Charleston, Missouri.
Route description
mi[1] | km | |
---|---|---|
AR | 122.80 | 197.63 |
MO | 21.96 | 35.34 |
IL | 364.16 | 586.06 |
Total | 508.92 | 819.03 |
Arkansas
In Arkansas, I-57 begins in North Little Rock at I-40, running concurrently with US 67 and US 167. I-440 westbound begins at the junction of the two Interstates in Jacksonville. I-57 continues northbound through Jacksonville, and the Interstate temporarily narrows from six lanes to four lanes at the Main Street interchange. I-57 is four lanes until it widens back to six lanes just north of the Vandenberg Boulevard interchange (exit 11). I-57 widens back to six lanes for five miles (8.0 km) northbound until an interchange with Highway 5 (AR 5) and AR 89 in Cabot. At this point, the Interstate reverts to four lanes as it continues north through Cabot.[a] After the AR 5/AR 89 interchange in Cabot, I-57 reverts to four lanes until it ends in Walnut Ridge. In Beebe, US 64 runs concurrently with the Interstate and continues east for 27 miles (43 km) until exit 55 in Bald Knob where US 64 splits off to the east and US 167 splits off to the north to Batesville. I-57 continues northbound from Bald Knob, through Newport to Walnut Ridge, where it runs concurrently with US 412. The Interstate ends at unsigned exit 124 in Walnut Ridge, where US 67 continues north to Pocahontas and US 412 splits off to the east.
Missouri
In the state of Missouri, I-57 begins in Sikeston at a cloverleaf interchange with I-55 as a continuation of U.S. Route 60 (US 60) and heads east. Entering Charleston, the Interstate almost immediately interchanges with Route 105, with I-57 Business (I-57 Bus.) heading north with Route 105. Southeast of the city, it then turns to the northeast. To the east of Charleston, the US 60 concurrency ends after about 12 miles (19 km) when I-57 meets US 62/Route 77, with US 60 heading eastward and I-57 Bus. ending. I-57 eventually meets the Missouri–Illinois state line at the Mississippi River, crossing the Cairo I-57 Bridge into Cairo, Illinois.
Illinois
I-57 is the longest Interstate Highway in the state of Illinois, spanning 364.16 miles (586.06 km) long with Chicago being the main city along its northern route and Memphis being the southern main city along its southern route. I-57 then enters Illinois across the Mississippi River into Cairo. It passes through Mounds and Ullin, and then it makes an interchange with US 51, making US 51 depart from its temporary concurrency with the Interstate. I-57 then continues north and has an interchange with I-24 toward Nashville, Tennessee. It then continues to head toward Marion, West Frankfort, Benton, Whittington, and Ina and then heads into Mount Vernon. In Mount Vernon, I-57 has a short concurrency with I-64 while making two diamond interchanges with the city's streets. I-64 then leaves I-57 and continues its western route toward St. Louis, Missouri, while I-57 continues toward Effingham. In Effingham, I-70 joins I-57 and makes interchanges with the city's streets once again. I-70 then departs from I-57 and continues east toward Terre Haute and Indianapolis, Indiana. As for I-57, it continues and heads toward Mattoon where it has a cloverleaf interchange with US 45 and then heads toward Champaign where it meets the terminus of I-72 in a cloverleaf interchange. It then travels for another two miles (3.2 km) and then meets up with a soon to be changed from a cloverleaf interchange to a semi-directional interchange with I-74 going east toward Indianapolis (again) and west toward Bloomington. The Interstate then heads toward Kankakee and then into Cook County where it meets its own terminus with I-94 ending in Chicago.
History
The oldest segment of I-57 is a 6.2-mile (10.0 km) strip running east of Bradley to Kankakee labeled on the 1959 Illinois state highway map.[5] Two years later, a 30-mile (48 km) stretch of I-57 from Dongola north to Marion opened on September 26, 1961.[6] Another portion between the Illinois Route 121 (IL 121)/US 45 exit and the Watson–Mason exit was completed and opened prior to July 1965, linking I-57 to I-70 and running in tandem with I-70 for several miles, with access to Indianapolis, Indiana, to the east and St. Louis, Missouri, to the west. A 21.5-mile (34.6 km) section of I-57 in Jefferson County from Bonnie (using a temporary road that is still partially visible from the northbound lanes) to IL 161 later opened on December 9, 1969.[7] The portion of I-57 in Chicago (known as the Dan Ryan West Leg Extension) was constructed and opened in segments between 1963 and 1970. It remains the most recent Interstate Highway to be established within the city.[6] The final section of I-57 in Illinois opened in December 1971 at Paxton.[8]
The portion of I-43 from Milwaukee to Green Bay was originally numbered as I-57.[9] The number was changed due to the existence of I-57 in Illinois.[10]
I-57 was widened to six lanes in Effingham from 2011 until 2016.[11]
For many years, an interchange at the junction of I-57 with I-294 did not exist. It was one of the few places in the U.S. where Interstates cross but have no interchange. The Illinois Department of Transportation (IDOT) and Illinois State Toll Highway Authority (ISTHA) opened Phase 1 of a new interchange in 2014, providing access from I-57 north to I-294 north and from I-294 south to I-57 south.[12] Phase 2, which completed the remaining movements except for northbound I-57 to southbound I-294 and northbound I-294 to southbound I-57, was opened to traffic on September 11, 2022.[13]
On November 7, 2024, I-57 was designated onto 110 mi (180 km) of US 67 between North Little Rock and Walnut Ridge in Arkansas.[14]
Future
I-57 is slated to eventually be extended west along US 60 to Poplar Bluff, Missouri, and then south along the US 67 corridor to North Little Rock, Arkansas, ending at I-40.[15] The extension is listed under High Priority Corridor 89, the I-57 Corridor Extension.[16] In April 2016, a provision designating US 67 from North Little Rock to Walnut Ridge, Arkansas, as "Future I-57" was added into the federal fiscal year 2017 Transportation, Housing and Urban Development funding bill and officially became law in 2017.[17]
Missouri has already converted 62 miles (100 km) of the US 60/US 67 corridor between Sikeston and Route 158 near Harviell to a mixture of freeway and expressway segments. All at-grade crossings along the corridor would have to be eliminated before the Interstate designation could be applied.[18] A new freeway segment from Route 158 to just south of Neelyville near County Route 274 (about two miles (3.2 km) north of the Arkansas border) has been announced as part of a cost share program and is in the planning stages.[19][20] In August 2022, redesign of the US 67 and US 160/Route 158 interchange began. The interchange will be transformed to contain roundabouts. The work was completed in November 2023.[21][22][23][24] In the meantime, the Missouri Department of Transportation began a study in the Summer of 2023 in regard to the 11 miles (18 km) of US 60 between CR 593 and the existing I-55/I-57/US 60 interchange in Sikeston with results planned to be released by the end of 2024.[25]
In Arkansas, 118 miles (190 km) of Interstate-grade US 67 runs from I-40 to US 412 in Walnut Ridge, leaving a segment of approximately 40 miles (64 km) of new Interstate-grade highway along US 67 that still would need to be built in northeastern Arkansas.[26] On February 23, 2018, Arkansas state officials unveiled a "Future I-57" sign to be posted along the corridor of US 67.[27] A route for I-57 from Walnut Ridge to the Missouri state line was chosen in 2022. The route shows it passing near levees[28] but was adjusted to not have any impact on the levees. The Arkansas Department of Transportation announced in September 2023 that work to extend Future I-57 in Clay County would begin in late 2024 or early 2025 depending on when contracts are let along with completion of the final design process.[29] The first section will be between the US 67 interchanges at Walnut Ridge and Corning while the second section (which will begin construction starting in 2026) will extend the first section northward to the Missouri state line.[30] Plans for the Corning Bypass show AR 657 as a temporary designation for this section until other sections are completed.[31] ARDOT announced on November 6, 2024, that ground would be broken on the Corning Bypass on November 14, 2024.[32]
Exit list
State | County | Location | mi[33][34] | km | Exit | Destinations | Notes |
---|---|---|---|---|---|---|---|
Arkansas | Pulaski | North Little Rock | 0.0 | 0.0 | I-40 west / US 67 south / US 167 south – Little Rock, Fort Smith | Southern end of US 67/US 167 concurrency; southern terminus | |
155 | I-40 east – Memphis | Southbound exit and northbound entrance; exit number corresponds to I-40; exit 155 on I-40 | |||||
0.9– 1.2 | 1.4– 1.9 | 1 | McCain Boulevard | Signed as exits 1A (east) and 1B (west) northbound | |||
Sherwood | 1.9 | 3.1 | 2 | Trammel Road | Northbound exit only | ||
3.2 | 5.1 | 3 | Wildwood Avenue / Trammel Road | No northbound access to Trammel Road | |||
3.9 | 6.3 | 4 | AR 176Y north to Brockington Road | Northbound exit and southbound entrance; southern terminus of AR 176Y | |||
4.3 | 6.9 | 5 | AR 176 west (Kiehl Avenue) | Eastern terminus of AR 176 | |||
Jacksonville | 6.0 | 9.7 | 6 | I-440 west – Memphis, Texarkana | Current eastern terminus and exit 13 on I-440 | ||
8.3 | 13.4 | 8 | Redmond Road | Northbound exit and southbound entrance | |||
8.5 | 13.7 | 9 | Main Street | ||||
9.2 | 14.8 | 10A | James Street | ||||
10.1 | 16.3 | 10B | AR 161 south / Gregory Street | AR 161 not signed southbound | |||
10.6 | 17.1 | 11A | AR 161 south / Vandenberg Boulevard | Signed as exit 11 southbound; AR 161 not signed northbound | |||
11.3 | 18.2 | 11B | Air Force Base | Northbound exit and entrance; accsss via T.P. White Drive | |||
Lonoke | | 15.7– 16.0 | 25.3– 25.7 | 16 | AR 5 north / AR 321 north / AR 367 north – Heber Springs, Cabot | Signed as exits 16A (AR 321) and exit 16B (AR 5) northbound | |
Cabot | 18.4 | 29.6 | 19 | AR 89 – Cabot | |||
20.4 | 32.8 | 21 | AR 38 east – Cabot | Western terminus of AR 38 | |||
Austin | 21.6 | 34.8 | 22 | AR 305 – Austin | |||
Ward | 24.2 | 38.9 | 25 | AR 319 – Ward | |||
White | Beebe | 27.8 | 44.7 | 28 | US 64 west / US 67B north – Beebe, Conway | Southern end of US 64 concurrency; southern terminus of US 67B | |
28.8 | 46.3 | 29 | AR 367S south – Beebe | Northern terminus of AR 367S | |||
30.1 | 48.4 | 31 | US 67B south / AR 31 – Beebe, Antioch | Northern terminus of US 67B | |||
| 34.6 | 55.7 | 35 | AR 13 – McRae, Garner | Former AR 371 | ||
Searcy | 41.6 | 66.9 | 42 | US 67B north / AR 367 south – Searcy, Garner | Southern terminus of US 67B; northern terminus of AR 367 | ||
43.2 | 69.5 | 44 | AR 367 – Searcy | ||||
44.6 | 71.8 | 45 | AR 36 west / AR 367 – Searcy | AR 367 not signed; eastern terminus of AR 36 | |||
45.8 | 73.7 | 46 | US 67B south / AR 36 east – Searcy, Kensett | Northern terminus of US 67B; western terminus of AR 36 | |||
| 47.4 | 76.3 | 48 | AR 385 – Judsonia | |||
| 50.5 | 81.3 | 51 | AR 157 – Judsonia | |||
| 54.0 | 86.9 | 54 | Bald Knob Lake Road | |||
Bald Knob | 54.9 | 88.4 | 55 | US 64 east / US 167 north – Bald Knob, Batesville | Northern end of US 64/US 167 concurrency | ||
| 59.5 | 95.8 | 60 | Russell | Access via SE 3rd Street | ||
| 64.9 | 104.4 | 65 | AR 87 – Bradford | |||
Jackson | | 68.6 | 110.4 | 69 | CR 315 – Possum Grape | ||
| Bridge over White River | ||||||
Ingleside | 73.5 | 118.3 | 74 | AR 224 east | Western terminus of AR 224 | ||
| 80.0 | 128.7 | 80 | AR 14 / AR 224 west – Waldenburg | AR 224 not signed | ||
| 82.3 | 132.4 | 82 | AR 17 – Newport | |||
Newport | 83.4 | 134.2 | 83 | AR 384 – Newport | |||
85.5 | 137.6 | 85 | AR 18 – Newport, Grubbs | ||||
| 87.8 | 141.3 | 87 | CR 43 | |||
| 96.3 | 155.0 | 95 | AR 37 – Tuckerman, Grubbs | |||
Craighead | | 102.7 | 165.3 | 102 | US 78 east / AR 226 – Jonesboro, Cash, Arkansas State University | Western terminus of US 78; former routing of US 67 | |
Lawrence | Alicia | 110.1 | 177.2 | 111 | AR 230 to AR 91 / AR 367 – Alicia, Bono | ||
Walnut Ridge | 120.0 | 193.1 | 121 | US 63 / US 412 west – Hoxie, Jonesboro | Southern end of US 412 concurrency; signed as exits 121A (north) and 121B (south) southbound; former routing of US 67 | ||
122.8 | 197.6 | 124 | US 67 north / US 412 east / US 412B west – Paragould, Walnut Ridge | Northern end of US 67/US 412 concurrency; current northern terminus; eastern terminus of US 412B; exit number not signed | |||
Gap in designation, connection made via US 67 and US 60 | |||||||
Missouri | Scott | Sikeston | 0.000 | 0.000 | US 60 west – Dexter, Poplar Bluff | Southern end of US 60 concurrency; continuation beyond I-55; future I-57 south | |
0.000– 0.538 | 0.000– 0.866 | 1 | I-55 – Memphis, St. Louis | Current southern terminus; signed as exits 1A (south) and 1B (north) I-55 exit 66 | |||
Mississippi | Long Prairie Township | 4.916 | 7.912 | 4 | Route B – Bertrand | ||
Charleston | 10.745 | 17.292 | 10 | I-57 BL north / Route 105 – Charleston, East Prairie | |||
13.027 | 20.965 | 12 | I-57 BL south / US 60 east / US 62 / Route 77 – Charleston, Wyatt | Northern end of US 60 concurrency | |||
Mississippi River | 22.328 0.00 | 35.933 0.00 | Interstate 57 Bridge Missouri–Illinois state line | ||||
Illinois | Alexander | Cairo | 1.4 | 2.3 | 1 | US 51 south / IL 3 – Cairo, Olive Branch | Southern end of US 51 concurrency |
Pulaski | Mounds | 7.6 | 12.2 | 8 | Mounds Road | ||
Ullin | 17.7 | 28.5 | 18 | Ullin | |||
Union | Dongola | 24.4 | 39.3 | 24 | Dongola Road | ||
25.0 | 40.2 | 25 | US 51 north – Carbondale | Northern end of US 51 concurrency; northbound exit and southbound entrance | |||
Anna | 30.0 | 48.3 | 30 | IL 146 – Anna, Vienna | |||
Buncombe | 36.3 | 58.4 | 36 | Lick Creek Road | |||
Johnson | Goreville | 39.7 | 63.9 | 40 | Goreville Road | ||
Williamson | Southern Precinct | 43.9 | 70.7 | 44 | I-24 east – Nashville | Western terminus of I-24 | |
45.2 | 72.7 | 45 | IL 148 (Refuge Road) | ||||
Marion | 52.9 | 85.1 | 53 | Main Street – Marion | Former IL 13 | ||
53.6 | 86.3 | 54 | IL 13 – Carbondale, Harrisburg The Hill Avenue | Split into exits 54A (IL 13) and 54B (The Hill Avenue) northbound | |||
Johnston City | 58.9 | 94.8 | 59 | Johnston City, Herrin | |||
Franklin | West Frankfort | 64.6 | 104.0 | 65 | IL 149 – West Frankfort, Zeigler | ||
West City | 71.6 | 115.2 | 71 | IL 14 – Benton, Christopher | To IL 34 | ||
Ewing Township | 77.5 | 124.7 | 77 | IL 154 – Sesser, Whittington | |||
Jefferson | Ina | 82.6 | 132.9 | 83 | Ina | ||
Dodds Township | 91.5 | 147.3 | 92 | I-64 east – Louisville | Southern end of I-64 concurrency; I-64 exit 78 westbound | ||
Mt. Vernon | 93.7 | 150.8 | 94 | Veterans Memorial Drive | |||
94.7 | 152.4 | 95 | IL 15 – Mt. Vernon, Ashley | ||||
96.2 | 154.8 | 96 | I-64 west – St. Louis | Northern end of I-64 concurrency; I-64 exit 73 eastbound | |||
Dix | 103.5 | 166.6 | 103 | Dix | |||
Marion | Raccoon Township | 109.2 | 175.7 | 109 | IL 161 – Centralia | ||
Salem | 116.4 | 187.3 | 116 | US 50 – Salem, Sandoval | |||
Kinmundy Township | 127.2 | 204.7 | 127 | Patoka, Kinmundy | |||
Fayette | Farina | 135.4 | 217.9 | 135 | IL 185 – Farina, Vandalia | ||
Clay | No major intersections | ||||||
Effingham | Mason Township | 144.7 | 232.9 | 145 | Edgewood | ||
150.7 | 242.5 | 151 | Watson, Mason | ||||
Summit Township | 157.3 | 253.1 | 157 | I-70 west – St. Louis | Southern end of I-70 concurrency; exit 92 eastbound | ||
Effingham | 159.4 | 256.5 | 159 | Fayette Avenue | |||
160.5 | 258.3 | 160 | IL 32 / IL 33 | Access to Lake Shelbyville and Convention Center | |||
162.2 | 261.0 | 162 | US 45 – Sigel, Effingham | Access to Lake Land College and Kuthe Center | |||
Teutopolis Township | 163.4 | 263.0 | 163 | I-70 east – Indianapolis | Northern end of I-70 concurrency; exit 98 westbound | ||
Shelby | No major intersections | ||||||
Cumberland | Neoga Township | 177.0 | 284.9 | 177 | US 45 – Neoga | ||
Coles | Mattoon | 184.4 | 296.8 | 184 | US 45 / IL 121 – Mattoon, Toledo | ||
189.6 | 305.1 | 190 | IL 16 – Charleston, Mattoon | Signed as exits 190A (east) and 190B (west); access to Coles County Airport and Eastern Illinois University | |||
192.4 | 309.6 | 192 | CR 18 (Mattoon-Charleston Enterprise Parkway) | ||||
Douglas | Arcola | 203.6 | 327.7 | 203 | IL 133 – Paris, Arcola | ||
Tuscola | 211.7 | 340.7 | 212 | US 36 – Newman, Tuscola | |||
Champaign | Pesotum | 219.9 | 353.9 | 220 | US 45 – Tolono, Pesotum | ||
Tolono Township | 228.6 | 367.9 | 229 | Monticello, Savoy, Tolono | Access to Willard Airport | ||
Champaign Township | 231.7 | 372.9 | 232 | Curtis Road | |||
Champaign | 235.2 | 378.5 | 235 | I-72 west / University Avenue – Springfield, Decatur | Signed as 235A (University Avenue) and 235B (I-72); I-72 exit 182 | ||
237.4 | 382.1 | 237 | I-74 – Indianapolis, Peoria | Signed as exits 237A (east) and 237B (west); I-74 exit 179 | |||
238.4 | 383.7 | 238 | Olympian Drive | ||||
Hensley Township | 240.5 | 387.0 | 240 | Market Street | |||
Rantoul | 250.2 | 402.7 | 250 | US 136 – Rantoul, Fisher | |||
Ford | Paxton | 260.9 | 419.9 | 261 | IL 9 – Paxton, Gibson City | ||
Iroquois | Artesia Township | 271.9 | 437.6 | 272 | Buckley, Roberts | Roberts signed northbound only | |
Onarga Township | 279.9 | 450.5 | 280 | IL 54 – Onarga, Roberts | Roberts signed southbound only | ||
Gilman | 282.9 | 455.3 | 283 | US 24 – Gilman, Chatsworth | |||
Ashkum Township | 292.7 | 471.1 | 293 | IL 116 – Ashkum, Pontiac | |||
Clifton | 296.5 | 477.2 | 297 | Clifton | |||
Chebanse Township | 301.6 | 485.4 | 302 | Chebanse | |||
Kankakee | Kankakee | 307.5 | 494.9 | 308 | US 45 / US 52 – Kankakee | ||
311.6 | 501.5 | 312 | IL 17 – Kankakee, Momence | ||||
315.3 | 507.4 | 315 | IL 50 – Bradley, Bourbonnais | ||||
Bourbonnais | 318.4 | 512.4 | 318 | Bourbonnais Parkway | Opened November 2, 2018[35] | ||
Manteno | 321.6 | 517.6 | 322 | Manteno | |||
Will | Peotone Township | 327.1 | 526.4 | 327 | Wilmington, Peotone | ||
Monee | 335.1 | 539.3 | 335 | Manhattan, Monee | |||
University Park | 337.1 | 542.5 | 337 | Stuenkel Road / University Parkway | Access to Governors State University; interchange opened on October 30, 2015[citation needed] | ||
Cook | Richton Park | 339.0 | 545.6 | 339 | Sauk Trail | ||
Matteson | 340.69 | 548.29 | 340 | US 30 / Lincoln Highway – Matteson | Signed as exits 340A (east) and 340B (west) southbound | ||
342.21 | 550.73 | 342 | Vollmer Road | Signed as exits 342A (east) and 342B (west) southbound | |||
Bremen Township | 344.67– 344.86 | 554.69– 555.00 | 345 | I-80 to I-294 Toll – Indiana, Iowa | Signed as exits 345A (east) and 345B (west); I-80 exit 151 | ||
346.62 | 557.83 | 346 | 167th Street to IL 50 (Cicero Avenue) | Signed as exits 346A (east) and 346B (west to IL 50) | |||
Markham | 347.90 | 559.89 | 348 | US 6 (159th Street) – Markham, Oak Forest | Signed as exits 348A (east) and 348B (west) | ||
349.62 | 562.66 | 349 | I-294 Toll (Tri-State Tollway) – Wisconsin, Indiana | Signed as exits 349A (north) and 349 (south) southbound<; no northbound exit to I-294 south; no southbound entrance from I-294 north; I-294 exit 7 | |||
Posen | 350.15 | 563.51 | 350 | IL 83 (147th Street / Sibley Boulevard) | |||
Calumet Park | 353.25 | 568.50 | 353 | 127th Street / Burr Oak Avenue | |||
Calumet Park–Chicago line | 354.25 | 570.11 | 354 | 119th Street | |||
Chicago | 355.27 | 571.75 | 355 | 111th Street / Monterey Avenue | |||
357.32 | 575.05 | 357 | IL 1 (Halsted Street) | Northern terminus of IL 1 | |||
358.47 | 576.90 | — | I-94 east (Bishop Ford Freeway) – Indiana | Northbound exit and southbound entrance; I-94 exit 63 | |||
358.57 | 577.06 | 358 | Wentworth Avenue | Southbound exit only | |||
359.12 | 577.95 | I-94 west (Dan Ryan Expressway) – Chicago Loop | Northern terminus; I-94 exit 63 | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
Charleston business loop
Location | Charleston, Missouri |
---|---|
Length | 2.94 mi (4.73 km) |
Interstate 57 Business (I-57 Bus.) in Charleston, Missouri, begins at I-57 exit 10. From this diamond interchange, it runs north in a concurrency with Route 105 along South Main Street into the city center. It then turns east onto Marshall Street, which also carries US 62 and Route 77. The business route ends at I-57 exit 12, with US 62 and Route 77 continuing to the east with US 60.
Notes
- ^ Construction to widen I-57 to six lanes between Main Street and Vandenburg Boulevard in Jacksonville and the AR 5/AR 89 interchange is ongoing and is expected to be complete sometime in 2027.
References
- ^ a b c Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Archived from the original on July 3, 2017. Retrieved December 28, 2023.
- ^ American Association of State Highway and Transportation Officials. "Interstate Control Cities". American Association of State Highway and Transportation Officials. Archived from the original on June 24, 2021. Retrieved July 10, 2021.
- ^ Missouri Department of Transportation (n.d.). Exit 64A sign (Highway guide sign). Sikeston: Missouri Department of Transportation. Retrieved April 4, 2012.
- ^ Federal Highway Administration (December 31, 2018). "Table 2: Auxiliary Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways as of December 31, 2018". Federal Highway Administration. Archived from the original on July 3, 2017. Retrieved July 10, 2021.
- ^ Illinois Division of Highways; H.M. Gousha (1959). Illinois Official Highway Map (Map). [1:790,00]. Springfield: Illinois Division of Highways – via Illinois Digital Archives.
- ^ a b "Interstate 57". Interstate Guide. Archived from the original on May 17, 2019. Retrieved May 17, 2019.
- ^ Mt. Vernon Register-News. December 9, 1969.
{{cite news}}
: Missing or empty|title=
(help)[full citation needed] - ^ Southern Illinoisan. December 29, 1971.
{{cite news}}
: Missing or empty|title=
(help)[full citation needed] - ^ Fond du Lac Reporter. March 9, 1972.
{{cite news}}
: Missing or empty|title=
(help)[full citation needed] - ^ The Journal Times. Racine, WI. December 10, 1974.
{{cite news}}
: Missing or empty|title=
(help)[full citation needed] - ^ "I-57/I-70 Rehabilitation". Lochmueller Group. Archived from the original on March 24, 2016. Retrieved March 14, 2022.
- ^ "Interchange connecting I-57, I-294 opens". ABC7 Chicago. October 25, 2014. Archived from the original on March 14, 2022. Retrieved March 14, 2022.
- ^ "I-294/I-57 Interchange Project - Phase 2". Illinois State Toll Highway Authority. Archived from the original on November 4, 2022. Retrieved December 3, 2022.
- ^ Zeringue, Neale (November 7, 2024). "Highway 67 now designated as Interstate 57, will soon connect North Little Rock to Chicago". Little Rock, AR: KARK-TV. Retrieved December 1, 2024.
- ^ Miller, Bob (27 February 2023). "Extension of I-57 to impact national traffic, Poplar Bluff and Arkansas economies". Southeast Missourian. Archived from the original on May 18, 2023. Retrieved 18 May 2023.
- ^ "Statutory Listing of Corridor Descriptions - High Priority Corridors - National Highway System - Planning - FHWA". www.fhwa.dot.gov. Archived from the original on January 10, 2018. Retrieved January 4, 2022.
- ^ "Arkansas Highway to Receive 'Future I-57' Designation". Times Record. Arkansas News Bureau. Archived from the original on June 2, 2017. Retrieved June 14, 2017.
- ^ Heuring, Leonna (August 1, 2010). "MoDOT Celebrates Completion of US 60 Four-Lane Project with Caravan". The Southeast Missourian. Cape Girardeau, Missouri. Archived from the original on May 12, 2016. Retrieved April 26, 2016.
- ^ Ruch, Amber (March 3, 2020). "Gov. Parson visits transportation cost-share project in Poplar Bluff, Mo". KFVS-TV. Archived from the original on April 9, 2022. Retrieved March 14, 2022.
- ^ "U.S. 67 (Future I-57) in Butler County". Archived from the original on April 25, 2020. Retrieved April 26, 2020.
- ^ Newsdesk, Region 8 (August 11, 2022). "First phase of Future I-57 project slated to begin". Jonesboro, Arkansas: KAIT-TV. Archived from the original on October 9, 2022. Retrieved October 9, 2022.
{{cite web}}
: CS1 maint: numeric names: authors list (link) - ^ Ruch, Amber (14 June 2023). "1st phase of U.S. 67/Future I-57 project in Butler Co. continues with intersection changes". www.kfvs12.com. Archived from the original on July 10, 2023. Retrieved 10 July 2023.
- ^ "U.S. 67 (Future I-57) Corridor Upgrades in Butler County | Missouri Department of Transportation". www.modot.org. Archived from the original on July 10, 2023. Retrieved 10 July 2023.
- ^ "First phase of Future I-57 project slated to begin". KAIT 8. 11 August 2022. Archived from the original on October 9, 2022. Retrieved 24 October 2023.
- ^ U.S. Route 60 Conceptual Study in New Madrid and Scott Counties. Missouri Department of Transportation https://www.modot.org/60corridorstudy. Retrieved August 11, 2024.
{{cite web}}
: Missing or empty|title=
(help) - ^ Reaves, Jonathan (June 2017). "Arkansas 'has a lot of work to do' to bring 'Future I-57' to Missouri line". KASU-TV. Archived from the original on June 1, 2017. Retrieved June 14, 2017.
- ^ Pettit, Emma (February 23, 2018). "Corridor stretching from North Little Rock to northeast Arkansas recognized as future interstate". Arkansas Democrat-Gazette. Archived from the original on February 23, 2018. Retrieved February 23, 2018.
- ^ Savage, Hayden (December 2, 2022). "Future I-57 potentially covering levee in Randolph County". Jonesboro, Arkansas: KAIT-TV. Archived from the original on February 2, 2023. Retrieved February 2, 2023.
- ^ "I-57 route identified". Jonesboro Sun. 25 October 2023. Archived from the original on October 26, 2023. Retrieved 26 October 2023.
- ^ Savage, Hayden (21 September 2023). "Work expected to begin on "Future I-57″ in 2024". KAIT 8. Archived from the original on November 17, 2023. Retrieved 24 October 2023.
- ^ "Corning Bypass (Future I-57)" (PDF). Arkansas Department of Transportation. Arkansas Highway District 10. Retrieved August 16, 2024.
- ^ "ARDOT to Break Ground on Corning Bypass". Arkansas Department of Transportation. November 6, 2024. Retrieved November 8, 2024.
- ^ Missouri Department of Transportation (November 14, 2012). MoDOT HPMAPS (Map). Missouri Department of Transportation. Retrieved November 14, 2012.
- ^ Google (July 10, 2014). "Map of Interstate 57 in Illinois" (Map). Google Maps. Google. Retrieved July 10, 2014.
- ^ Dykstra, John (November 3, 2018). "I-57 interchange at Bourbonnais Parkway finally opens". The Daily Journal. Kankakee, Illinois. Archived from the original on November 3, 2018. Retrieved November 5, 2018.
External links
- Articles with incomplete citations
- Interstate 57
- Interstate Highway System
- Interstate Highways in Illinois
- Interstate Highways in Missouri
- Scott County, Missouri
- Mississippi County, Missouri
- Alexander County, Illinois
- Pulaski County, Illinois
- Union County, Illinois
- Johnson County, Illinois
- Williamson County, Illinois
- Franklin County, Illinois
- Jefferson County, Illinois
- Marion County, Illinois
- Fayette County, Illinois
- Clay County, Illinois
- Effingham County, Illinois
- Shelby County, Illinois
- Cumberland County, Illinois
- Coles County, Illinois
- Douglas County, Illinois
- Champaign County, Illinois
- Ford County, Illinois
- Iroquois County, Illinois
- Kankakee County, Illinois
- Will County, Illinois
- Cook County, Illinois