Federal Route 1 in Sarawak

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Federal Route 1

Pan Borneo Highway Sarawak
(Sarawak First Trunk Road)
Route information
Part of AH 150
Length1,077.1 km (669.3 mi)
Existed2013–present
HistoryCompleted in 2024
Major junctions
West endTelok Melano
East end FT 1 Malaysia Federal Route 1 (Sabah) in Merapok
Section 1
West endSematan
Major intersections FT 21 Tebedu Highway
FT 25 Batang Ai Highway
FT 800 Jalan Tanjung Kidurong
FT 801 Kuching Bypass
FT 803 Bakun Highway
East endSungai Tujoh
Section 2
West endKuala Lurah
East endPandaruan
Section 3
West endMengkalap
East end FT 1 Malaysia Federal Route 1 (Sabah) in Merapok
Location
CountryMalaysia
Primary
destinations
Kuching
Serian
Sri Aman
Sarikei
Sibu
Bintulu
Limbang
Highway system

The Sarawak section of the Federal Route 1, Asian Highway Route AH 150, also known as Pan Borneo Highway Sarawak or Sarawak First Trunk Road, is a 1077-km federal highway in Sarawak, Malaysia, making the highway as the longest component of the Malaysian portion of the larger Pan Borneo Highway network.[1] Construction of the highway began in 2014 after Sarawak government being pressured by Sarawakian to exit Malaysia when they see no proper big highway connecting Sarawak after became a member of the federation of Malaysia for 55 years with all the natural resources being extract and sell by Malaysia Federal Government.

The combined length of the Pan Borneo Highway Sarawak and its Sabahan counterpart forms the longest federal highway in Malaysia, with the total length of 1,503 km.[1]

The Pan Borneo Highway Sarawak is notable for having three separate segments, sandwiched by two segments of Bruneian Pan-Borneo Highway. The Federal Route 1 was built in sections, comprising 92 sections altogether. Generally, all other federal and state highways in Sarawak serve as tributaries of the Federal Route 1. The highway is the only east-west oriented highway in Sarawak and links most of the division capitals in Sarawak except Kapit and Mukah. The sections from Miri to Limbang and to Lawas are connected by Brunei highway networks. At the Sarawak-Sabah border at Merapok, motorists must pass an immigration checkpoint to enter Sabah and vice versa. The highway continues as Malaysia Federal Route 1 (Sabah) in Sindumin.

History

Telok Melano, the starting point of Pan Borneo Highway.

The Sarawak Pan-Borneo Highway was built due to the lack of the intercity highway network in Sarawak. Initially, the intercity highway plan in Sarawak only existed after the Second World War ended in 1945, after Sarawak was ceded to Britain to become a British Crown Colony.[2]

The construction of the first intercity trunk highway in Sarawak was commenced in 1965, dubbed as the "First Trunk Road".[3] Most of the highway network in Sarawak was constructed within the decades of 1960s to 1980s.[2] The Lawas–Merapok–Sindumin section was completed in 1981[4] while the final missing link from Sibu to Bintulu was completed in 1985.[5] However, the highway had not been fully paved with asphalt yet at that time; it was only by the end of Sixth Malaysia Plan (RMK6) in 1995 that the FT1 highway in Sarawak was fully paved.[3]

Before 1996, all routes in the Pan-Borneo Highway network in Malaysia, including Sarawak Pan-Borneo Highway, were state highways. After the Federal Roads Act 1959 was made effective in Sabah and Sarawak in 1984, those highways were re-gazetted as federal highways in 1996 with the route number of FT1 (from Sematan to Kudat through Brunei), FT13 (Mile 32 Sandakan to Tawau) and FT22 (Tamparuli to Sandakan).[1] Those highways were later gazetted as a part of Asian Highway Network Route AH150.[6][7]

Although some sections had been upgraded to divided highways, the Sarawak Pan-Borneo Highway was notorious for its poor condition in many sections. The overall condition in many sections of the Malaysian section of the Highway was poor with many potholes, because most sections of the highway were built with standards as low as JKR R3 (design speed limit: 70 km/h; minimum lane width: 3.0 m).[8][9] A study to upgrade the entire highway to a super two highway under JKR R5 standard (design speed limit: 100 km/h; minimum lane width: 3.5 m) was done, which was expected to cost RM16 billion.[9] Ultimately, the Malaysian federal government had opted to upgrade the Pan-Borneo Highway to a divided highway.[10] The upgrade works of the Sarawak Pan-Borneo Highway to a divided highway is expected to be completed by 2023, with the overall cost of RM27 billion including its Sabahan counterparts.[11]

See also

References

  1. ^ a b c Senarai Jalan Persekutuan Utama Malaysia Archived 2011-07-28 at the Wayback Machine (in Malay) - Malaysian Public Works Department. Accessed 2011-5-14.
  2. ^ a b Hill, R.D. & Bray, Jennifer M. (1976). Geography and the Environment in Southeast Asia. Hong Kong: Hong Kong University Press. ISBN 9789622090095.
  3. ^ a b Mody, Ashoka (August 1997). Infrastructure Strategies in East Asia: The Untold Story. Washington, D.C.: Economic Development Institute of the World Bank. p. 35. ISBN 9780821340271.
  4. ^ Tun Dr. Mahathir Mohamad (17 November 1981). Sempena Pembukaan Rasmi Lebuhraya Papar ke Sindumin (Speech). Papar-Sindumin Highway FT1 inaugural speech. Sabah, Malaysia. Retrieved 13 March 2013. (in Malay)
  5. ^ Loi, Teck Hui (16 August 2017). Practising Corporate Social Responsibility in Malaysia: A Case Study in an Emerging Economy. Palgrave Macmillan. p. 76. ISBN 978-3-319-62475-4.
  6. ^ "Asian Highway Database: AH Network in Member Countries". United Nations Economic and Social Commission for Asia and the Pacific. Archived from the original on 2013-01-25. Retrieved 2015-09-19.
  7. ^ ERIA Study Team. "Current Status of ASEAN Transport Sector" (PDF). ASEAN Strategic Transport Plan 2011–2015. Jakarta: ASEAN Secretariat and ERIA. pp. 3-1–3-95. Retrieved 16 November 2013.
  8. ^ Zaain Zin (17 December 2011). "Naik taraf jalan Pan Borneo RM16b". Utusan Malaysia. Retrieved 14 January 2012. (in Malay)
  9. ^ a b Wong, Jack (17 December 2011). "Study gets underway for proposed upgrading of much-maligned Pan Borneo Highway". The Star. Retrieved 14 January 2012.
  10. ^ Sinyang, Angeline (2015-04-01). "Pan Borneo Sarawak dilancar". Utusan Malaysia (in Malay). Retrieved 2017-10-19.
  11. ^ "Lebuhraya Pan Borneo Sarawak dijangka siap pada 2023 - Rosnah" (in Malay). Berita Harian. 2015-11-26. Retrieved 2017-10-19.