D3 (Czechia)
You can help expand this article with text translated from D3 (Czechia) in Czech. Click [show] for important translation instructions.
|
Dálnice D3 (Czech) | |
Route information | |
Part of | |
Length | 70 km (43 mi) Planned: 172 km (107 mi) |
Major junctions | |
From | D0 in Prague |
To | S10 border with Austria near Dolní Dvořiště |
Location | |
Country | Czechia |
Regions | Central Bohemian, South Bohemian |
Major cities | Tábor, České Budějovice |
Highway system | |
The D3 motorway (Czech: Dálnice D3) is a highway in the Czechia. Currently only the middle segment of the route is in operation; when complete, it will run from Prague via Tábor and České Budějovice to the Czech-Austrian border at Dolní Dvořiště. It is part of the European route E55.
The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2026.[1] Completion of D3 in the Central Bohemian Region is planned by 2028, however its designed course through the Lower Sázava landscape is still objected and opposed by environmental and citizens associations.
Course
Once completed, the 172-kilometer-long (107 mi) highway will connect the Czech capital Prague with the Austrian Mühlviertel Expressway (S10) to Linz. As of December 2019 only 69.6 km (43.2 mi) of the highway are in operation, a section from Mezno to Úsilné (near to České Budějovice), while a further 43.7 km (27.2 mi) from Úsilné to Czechia-Austria border are currently under construction. The most controversial and disputed section is the planned segment in the Central Bohemian Region.
A 24.0-kilometer-long (14.9 mi) section from Dolní Třebonín to the border with Austria on the other side of the future S10 expressway was initially planned to be built as an expressway (Czech: rychlostní silnice) as well, however on 1 January 2016, the category of expressways (R) was abolished in Czechia, so it is counted as part of the D3 motorway.
Unfinished sections
Section | Length | Start of construction | Completion |
---|---|---|---|
Praha – Jílové u Prahy | 9,51 km | planned 2026 | planned 2030 |
Jílové u Prahy – Hostěradice | 4,49 km | ||
Hostěradice – Václavice | 11,29 km | ||
Václavice – Voračice | 16,70 km | ||
Voračice – Nová Hospoda | 16,45 km | ||
Úsilné – Hodějovice | 7,2 km | 04/2019[2] | 2024[2] |
Hodějovice – Dolní Třebonín | 12,5 km | 03/2019[3] | 2024[4] |
Dolní Třebonín – Kaplice-nádraží | 8,5 km | 02/2022[5] | planned 2024[5] |
Kaplice-nádraží – Nažidla | 12,0 km | 6/2024 | planned 2026 |
Nažidla – border with Austria | 3,5 km | 01/2024[6] | planned 2026 |
Images
D3 motorway near Planá nad Lužnicí.
D3 motorway near České Budějovice.
References
- ^ "ŘSD může dostavět padesát metrů dálnice D3, vyvlastnění pozemku platí". iDNES.cz. 4 February 2019.
- ^ a b https://mapapp.rsd.cz/Upload/Stavby/39/infoletak_d3-usilne-hodejovice.pdf All articles with bare URLs for citations[bare URL PDF]
- ^ "Directorate of roads and highways" (PDF). Archived (PDF) from the original on 2019-01-13.
- ^ https://apdos.roadmedia.cz/Upload/Stavby/40/infoletak_d3-hodejovice-trebonin.pdf?t=2024-01-04%2017:52:01.863
- ^ a b https://mapapp.rsd.cz/Upload/Stavby/48/infoletak_d3-trebonin-kaplice.pdf All articles with bare URLs for citations[bare URL PDF]
- ^ https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877