Bengaluru–Mysore Infrastructure Corridor

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

Bengaluru–Mysuru Infrastructure Corridor

Nandi Infrastructure Corridor Enterprises Road
NICE Peripheral Ring Road
BMIC-Mallasandra-flyover.jpg
NICE road at Mallasandra
Route information
Maintained by Nandi Infrastructure Corridor Enterprises Road
Length40 km (25 mi)
Existed1996–present
Major junctions
North endBengaluru
Major intersections
South endMysuru
Location
CountryIndia
StatesKarnataka
Highway system

The Nandi Infrastructure Corridor Enterprises Road, commonly known as NICE Road, is a partially implemented and largely scrapped 4 to 6 lane private tolled expressway in Karnataka,[1] that was intended to connect the two important cities Bengaluru and Mysuru in the Indian state of Karnataka. It will not be implemented, as Bengaluru–Mysuru access-controlled Highway part of NH 275 is going to replace it as a section of the new Bengaluru–Mangaluru Industrial Corridor (EC-34).

As of May 2017, around 800,000 vehicles use the road daily on its presently operational section from Electronic City on Hosur Road to Tumakuru Road.[2]

There has been accusation of irregularities in the execution of the Bengaluru Mysore Infrastructure Corridor (BMIC) by the Nandi Infrastructure Corridor Enterprise (NICE).[3]

History

NICE Road toll plaza

In conjunction with a 1995 Trade Mission to India sponsored by the then Governor of Massachusetts, William Weld, a memorandum of understanding was signed by Consortium members, Indian officials, including then Karnataka Chief Minister, H. D. Deve Gowda, and U.S. officials, which set the stage for launching the Bangalore Mysore Infrastructure Corridor project. The Consortium, Nandi Infrastructure Corridor Enterprises (NICE), comprises the Kalyani Group of Companies, VHB International LTD. and SAB International LTD. to develop the Bangalore Mysore Infrastructure Corridor.

The project has been in controversy since the day of planning. In October 2012, the Karnataka Lokayukta ordered a probe into several former chief ministers in matters relating to irregularities in land acquisition for the project.[4]

Status updates

  • Mar 2019: 4 km of expressway is completed, besides this 41 km of peripheral road and 8.5 km of link road is also constructed.[5]

Gallery

See also

References

  1. ^ "119 km Bengaluru – Mysuru Expressway project on NH-275 is an under construction 6-10 lane access-controlled highway with a route alignment in Karnataka.This mix of brownfield-upgrade (60%) and greenfield (40%) project was envisioned as an alternate to the now-scrapped Nandi Infrastructure Corridor Enterprises (NICE) Road". themetrorailguy. Bangalore. 2012-10-25. Retrieved 2012-03-13.
  2. ^ Yadav, Umesh. "Now, BMRCL chalks out a 'NICE' plan for Namma Metro - The Economic Times". The Economic Times. Retrieved 8 May 2017.
  3. ^ "NICE project: HDK to approach PM Modi with documents".
  4. ^ Chaturvedi, Amit (2012-10-25). "Mysore infrastructure corridor project: Probe ordered against former Karnataka chief ministers". Bangalore. NDTV. Retrieved 2012-10-25.
  5. ^ "Kumaraswamy mum on NICE project he once opposed". 16 November 2018.

External links