Arizona State Route 24

From the AARoads Wiki: Read about the road before you go
Jump to navigation Jump to search

State Route 24

Williams Gateway Freeway
SR 24 highlighted in red
Route information
Maintained by ADOT
Length5.48 mi[1] (8.82 km)
ExistedMay 4, 2014 (2014-05-04)–present
Major junctions
West end Loop 202 in Mesa
East endIronwood Road in Queen Creek/Apache Junction
Location
CountryUnited States
StateArizona
CountiesMaricopa, Pinal
Highway system
  • Arizona State Highway System
I-19SR 24 SR 30
SR 801Arizona 802.svg SR 989

State Route 24 (SR 24), also known as the Gateway Freeway or the Williams Gateway Freeway, is a freeway in the extreme southeastern region of the Phoenix Metropolitan Area.[2] The roadway is planned as a controlled-access highway to move traffic from the southeastern suburbs of Phoenix to planned ones in northwestern Pinal County. It is the lowest-numbered state route in Arizona. The first mile from Loop 202 to Ellsworth Road opened on May 4, 2014. An extension to Ironwood Drive opened in 2022, with the completion of "Interim Phase II";[3] the first mile of this extension from Ellsworth Road to Williams Field Road opened on April 1, 2022,[4] with the remainder following on August 11.[5] Planning for future sections has been halted until studies for the Pinal North-South Freeway are completed to confirm how the two freeways will intersect.[6]

In earlier planning stages, the freeway was formerly labeled State Route 802 (SR 802).

Route description

State Route 24 is a controlled-access highway at the intersection of Loop 202's southern leg (Santan Freeway) and Hawes Road, extending southeast near the Phoenix-Mesa Gateway Airport. The road continues along the Frye Road alignment to the Pinal County line, where it has a diamond interchange with Meridian Road.[7] Shortly after crossing into Pinal County, State Route 24 ends at an intersection with Ironwood Road.

Within Pinal County, State Route 24 is planned to continue further east, intersecting a future north-south freeway under study,[8] and reaching an eastern terminus in the general vicinity of Florence Junction, where US 60 and AZ 79 intersect.[9]

History

Freeway origins

The first mention of a controlled-access highway facility in the Gateway Freeway area occurred in 2003, when the Maricopa Association of Governments (MAG)'s Southeast Maricopa/Northern Pinal County Area Transportation Study identified a freeway starting at Route 202, passing by the Williams Gateway Airport (now Phoenix-Mesa Gateway Airport), and extending east into Pinal County, having its eastern terminus at Route 60. This new freeway was listed as a "potential new regional facility" that would benefit from right-of-way protection.[10] That same year, the Williams Gateway corridor was identified as a new corridor in Maricopa County's Regional Transportation Plan, with construction for the segment within the county planned in the 2016–2020 timeframe.[11] However, the implementation of the plan was based on the assumption that the ½¢ sales tax dedicated to transportation would be extended past its expiration at the end of 2005.[12]

In November 2004, voters in Maricopa County approved Proposition 400, an extension to the existing sales tax funding transportation improvements. A portion of those funds are earmarked toward improvements of the county's regional freeway system, which experiences significant volumes of traffic in parts of the Phoenix Metropolitan Area. These improvements are made either through expansion of existing freeways, or the development of new freeway corridors.[13] The Maricopa County portion of the Williams Gateway corridor, as a part of the county's Regional Transportation Plan, was included in the list of projects to be funded with the sales tax.[14]

In 2006, MAG identified a preferred alignment for Route 802 within Maricopa County. The alignment travels southeast from Route 202, between the airport and the former General Motors Desert Proving Grounds, until it turns to the east at Frye Road, continuing eastward to the Pinal County line.[7]

In response to a projected budget shortfall of $6.6 billion brought on by the Great Recession, MAG voted to modify its Regional Transportation Plan by suspend funding to numerous projects during a meeting on October 28, 2009. The Williams Gateway Freeway was among the projects affected, since the construction of most of the Maricopa County portion of the route—the alignment between Ellsworth Road and Meridian Road—was deferred to 2026 or later.[15] An interim roadway between the Santan Freeway and Ellsworth Road would still be constructed in the 2016–2020 time period.[16]

Phase I

In 2011, the City of Mesa announced it would provide $148 million (2011 USD) to advance construction of the first mile of the freeway, between the Santan Freeway and Ellsworth Road, to provide access to the eastern side of Phoenix-Mesa Gateway Airport. The Arizona State Transportation Board moved construction of the interim facility from fiscal year 2016 to fiscal year 2012, and renumbered the freeway to State Route 24.[2] The interim facility will contain the semi-directional T interchange with the Santan Freeway, consisting of four one-lane ramps; additional traffic lanes on the Santan Freeway; a half-diamond interchange at Ellsworth Road; and a two-lane roadway mainline connecting the two termini of the roadway.[17]

On March 30, 2012, Mesa officials announced plans to start construction the following Friday near Phoenix-Mesa Gateway Airport. Mesa Mayor Scott Smith and Arizona Department of Transportation Director John Halikowski attended a groundbreaking ceremony for the Gateway Freeway, State Route 24. Mesa officials said in a statement that by issuing bonds, the city was able to speed up construction on the project by four years.

Phase II

The intersection of Meridian Road and SR 24 in Arizona, prior to the full interchange being built there

Route 24's extension, opened in August 2022, has been labeled as an "interim" phase.[3] This is due to the fact that the freeway lanes will travel on the ramps and service roads at each intersection.

Interim Phase II built two general-purpose lanes in each direction.[18] Ultimately, ADOT plans to have three general-purpose lanes, one auxiliary lane, and one HOV lane in each direction.[19] These updates will coincide with the build-out of the actual interchanges at each new intersection, which are anticipated to be completed during Phase V of MAG's Regional Transportation Plan.[3] Bridges over Ellsworth Road were also added to the plan.

The first mile of Interim Phase II opened on April 1, 2022, from Ellsworth Road to an extended Williams Field Road. This was done in order to provide additional access to and from Bell Bank Park, a brand new sports complex adjacent to the road. Bell Bank Park was constructed on the former local General Motors Desert Proving Grounds.[4] The remainder, to Ironwood Drive, opened on August 11.[5] This stretch includes junctions with Signal Butte Road and Meridian Road, which was extended north from Combs Road to meet SR 24,[20] replacing a rural avenue known as Moeur Road.

Further extensions

No specific alignment of Route 24 has been set within Pinal County. The study that would determine the preferred alignment for the state route was suspended to allow it to advance in conjunction with the study for the North-South Corridor.[21] However, study maps from the Arizona Department of Transportation show that the freeway's study area in Pinal County runs between the end of the Maricopa County segment and the intersection of U.S. 60 and Arizona 79 in the vicinity of Florence Junction.[9] However, no funds have been identified for the Pinal County segment.[22]

Exit list

CountyLocationmi[1]kmExit[23]Destinations[17]Notes
MaricopaMesa0.000.00 Loop 202Exit 34A on Loop 202 (Santan Freeway)
0.801.291Ellsworth RoadFull interchange opened on April 1, 2022[3][4]
1.903.062Williams Field RoadAt-grade intersection, future interchange[4]
3.405.473Signal Butte RoadAt-grade intersection, future interchange
MaricopaPinal
county line
MesaQueen Creek
Apache Junction tripoint
4.407.084Meridian RoadAt-grade intersection, future interchange[3]
PinalQueen CreekApache Junction line5.488.825Ironwood RoadAt-grade intersection, future interchange; current eastern terminus[3]
Gold Canyon US 60Proposed interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

References

  1. ^ a b Google (August 20, 2022). "Arizona State Route 24" (Map). Google Maps. Google. Retrieved August 20, 2022.
  2. ^ a b Nelson, Gary (2011-01-26). "Gateway freeway gets state OK". AZCentral. Retrieved 2011-06-17.
  3. ^ a b c d e f "State Route 24 Interim Phase II: Ellsworth Road to Ironwood Drive". Arizona Department of Transportation. Retrieved January 9, 2020.
  4. ^ a b c d "ADOT to extend SR 24 east to Williams Field Road on Friday, April 1". Arizona Department of Transportation. March 31, 2022. Retrieved April 1, 2022.
  5. ^ a b "ADOT opens new stretch of SR 24 east of Williams Field Road". Arizona Department of Transportation. August 11, 2022.
  6. ^ "Hundreds walk on State Route 24 freeway in Mesa April 15 prior to its opening". May 2014. Archived from the original on 2014-05-12. Retrieved 2014-05-10.
  7. ^ a b DMJM Harris (March 2006). "Final Preferred Alignment Report" (PDF). Williams Gateway Freeway Alignment and Environmental Overview Study. Maricopa Association of Governments. pp. 43–44. Retrieved 2011-06-17.
  8. ^ "Northern Possible Route Alternatives" (PDF). North-South Corridor Study. Arizona Department of Transportation. December 2011. Retrieved 2012-01-08.
  9. ^ a b "State Route 802 Corridor Study Location/Design Concept Study & Environmental Assessment" (PDF). Arizona Department of Transportation. December 2009. Archived from the original (PDF) on 2010-02-03. Retrieved 2011-06-23.
  10. ^ Parsons Brinckerhoff (September 2003). "Southeast Maricopa / Northern Pinal County Area Transportation Study" (PDF). Maricopa Association of Governments. pp. 4–4, 7-1–7-3. Archived from the original (PDF) on 2012-03-14. Retrieved 2011-06-17.
  11. ^ Maricopa Association of Governments (November 2003). "Regional Transportation Plan: Executive Summary" (PDF). pp. 13, 15. Retrieved 2011-06-17.
  12. ^ Maricopa Association of Governments (November 2003). "Regional Transportation Plan" (PDF). pp. 1–2, 5–1, 5–4. Retrieved 2011-06-21.
  13. ^ Intermodal Transportation Division, Arizona Department of Transportation; Federal Highway Administration (October 2010). "Draft Environmental Assessment: State Route 802, Williams Gateway Freeway" (PDF). Arizona Department of Transportation. pp. 2–10. Retrieved 2011-06-17.
  14. ^ "What's in the Regional Transportation Plan?" (PDF). MAGAZine. Maricopa Association of Governments. November 2004. p. 8. Retrieved 2011-06-17.
  15. ^ Holstege, Sean (2009-10-29). "Valley freeway projects shelved". The Arizona Republic. Retrieved 2009-11-04.
  16. ^ Maricopa Association of Governments (December 2010). "Regional Transportation Plan: 2010 Update" (PDF). pp. 8-18–8-19. Retrieved 2011-06-21.
  17. ^ a b Intermodal Transportation Division, Arizona Department of Transportation; Federal Highway Administration (October 2010). "Draft Environmental Assessment: State Route 802, Williams Gateway Freeway" (PDF). Arizona Department of Transportation. pp. 31–32. Retrieved 2011-06-21.
  18. ^ "Typical Interim SR 24 Roadway Section" (PDF). November 2019. Retrieved January 9, 2020.
  19. ^ Bill Fathauer (November 14, 2019). "Public Information Meeting, State Route 24 (Gateway Freeway)" (PDF). Arizona Department of Transportation. Retrieved January 9, 2020.
  20. ^ Staff Reports (August 19, 2021). "Pinal County, Queen Creek break ground on major road extension". Pinal Central. Casa Grande Valley Newspapers Inc. Retrieved October 22, 2022.
  21. ^ "December 2009 Frequently Asked Questions" (PDF). State Route 802 Study. Arizona Department of Transportation. December 2009. Retrieved 2011-06-23.
  22. ^ "State Route 802". ADOT. Retrieved 2011-06-23.
  23. ^ Transportation Planning Division. "2018 Average Annual Daily Traffic Report - State Routes" (PDF). Phoenix: Arizona Department of Transportation. Retrieved October 16, 2019.

External links